This project assess present scenario of Paldi, an affluent residential area of south west ahmedabad, the current trends and provides proposals for the development of the ward.It mainly focuses land use zoning, transit oriented development around the BRTs and proposed metro corridor and provision of green spaces in the ward to make " A residential ward with diverse economic opportunities"

TRANSCRIPT

Page 1: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

Area Planning LabPaldi

પા�લડી�

ISHITA KACHRU, KANICA GOLA, AMANPREET KAUR, SWAPNEEL VAIJANAPURKAR, NARESH KURUBA, KAUSHALENDRA SINGH HITESHI, SUMANDEEP SANDHU

Page 2: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

Location map

Paldi is located in South Western Ahmedabad, India

WARD- AT GLANCE Location : 23°0 22″n 72°33 53″e′ ′Elevation : 55m above sea levelArea : 5.78 sq.K.M Population : 83,373Density : 14,424Literacy rate : 88%Sex ratio : 972

Page 3: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II) Area Planning Lab 2012 Paldi Ward-40 (Group II)

Area Persons per HectarePaldi 147

Chandlodia 160Naroda 183Ranip 265

Maninagar 320 Bapunagar 330 70%

25%5%

Building Heights

G - G+3G+3 - G+6G+7 - G+10

40%55%

5%

Income wise Classification

HIGMIG & LIGEWS

Paldi is an affluent residential area of south west Ahmedabad having maximum number of bungalows. It has a strong presence of HIG & MIG

Page 4: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

NORTH

4%20%

34%18%

24%

FSI Utilization Chart

Less than 0.50.5 to 11 to 1.21.2 to 1.5Above 1.5

24%

76%

FSI Utilization

UtilizedUnder Utilized

NORTH

N.I.D.

TAGOREHALL

SANSKARKENRDA

PALDI BUSSTAND

KOCHRABASHRAM

BURIALGROUND

Vajubhai Dave marg

Manubhai Jadhani margPaldi

Kochrab

Madalpur

Fatehpura

ELLIS BRIDGE

Permissible FSI all over Paldi is 1.8 and net FSI used Paldi is 0.8. FSI utilization is maximum in northern part of Paldi due to trend of commercialization along ashram road

Page 5: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

Land transformation from low rise residential buildings to high rise residential and mixed spaces occurring all over Paldi.

Page 6: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

All newly constructed flats in Paldi(2/3/4 BHK) ranging from 65 lacs to 1.0 crores are sold just within 9 months from the launch of scheme.(Source:- Various property developers in Paldi)

Name:- Shivalik ApartmentsLocation:- Near Sabarmati River FrontAverage Price:- 65 lacs

Scheme completely booked in seven months

Name:- Satva ApartmentsLocation:- Near Sabarmati River Front

Average Price:- 80 lacs

Scheme consisting of 208 flats completely booked in five months

Page 7: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

The present trend will intensify with the various city level projects like BRT, Metro and Sabarmati river front .

Page 8: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

Objectives

To maximize the benefits offered by current city level projects like BRTS, Metro and Sabarmati river front

Vision

A RESIDENTIAL WARD WITH DIVERSE ECONOMIC OPPORTUNITIES

Strategies

•To provide diverse mix use of land along ashram (arterial) road, BRTS and proposed metro corridor.

•Adopting a use that maximizes the benefits of reclaimed land of Sabarmati river front

•Improving the road network and connectivity

Page 9: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

Objectives

To enhance the residential character

Strategies

• Increasing the recreational facilities or activity zones in the residential area

•Relocation of slums to EWS housing

Vision

A RESIDENTIAL WARD WITH DIVERSE ECONOMIC OPPORTUNITIES

Page 10: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

Project 1:

Land use zoning.

The zoning districts are meant to create high density transit supportive development around transit stations and route.

Maximize the benefits offered by the transit corridor like BRTS and metro passing through Paldi

Page 11: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

LOCATION CRITERIA Along the arterial road having metro route.ZONES : C-1F.S.I : 3GROUND COVERAGE : 30 %TYPICAL TOTAL NO. OF STOREYS : 10LAND USE SPECIFICATIONS Commercial use consisting of offices, restaurants, malls, retail joints, etc.

LOCATION CRITERIA Plots surrounded by the secondary roads but divided by tertiary roadsZONES : R-2F.S.I : 1.8GROUND COVERAGE : 40 %TYPICAL TOTAL NO. OF STOREYS : 5GROUND COVERAGE : 50 %TYPICAL TOTAL NO. OF STOREYS : 3LAND USE SPECIFICATIONS Residential and institutions like school , temples, and grocery shops.

LOCATION CRITERIA Along the BRTS route, Sabarmati river front and the plots attached to the commercial plotsZONES : R-1(a)F.S.I : 3GROUND COVERAGE : 30 %TYPICAL TOTAL NO. OF STOREYS : 10LAND USE SPECIFICATIONS Mixed use consisting of residential with ground floor consisting of food joints, retails, etc.

LOCATION CRITERIA Plots along the secondary roadsZONES : R-1(b)F.S.I : 2.25GROUND COVERAGE : 30 %TYPICAL TOTAL NO. OF STOREYS : 7LAND USE SPECIFICATIONS Mixed use consisting of residential with ground floor consisting of clinics, groceries, etc. and institutions like schools and temples.

COMMERCIAL ZONE, C-1

RESIDENTIAL ZONE, R-1(A)

RESIDENTIAL ZONE, R-1(B)

LEGEND

RESIDENTIAL ZONE, R-2

GAMTAL

ROAD

WATER

RECREATION_PARKS+GARDENS

RIVER

Land use zoning mapNORTH

Page 12: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

C-1

R-2R-1(b)R-1 (a)

R-2R-1 (a)

R-1(b)

R-1(b)

SABARMATI RIVER

Land use zoning map

Page 13: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

Project 2:

Proposal for Arterial road along BRTs corridor..

Maximize the benefits offered by the transit corridor like BRTs through Paldi

Strategies

Land use zoning along the BRTS route

Regulations for proposed built form

Street section that facilitate smooth Pedestrian movement

and street activity.

Page 14: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

It has also been observed that when development concentrates along transit corridor, public transit patronage increases.

Page 15: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

Guangzhou, China Curitiba, Brazil

Daily Ridership: 10,00,000 Daily Ridership: 8,00,000

Along the BRT corridor in case of Guangzhou and Curitiba construction of 6 times the size of plot is allowed (FAR = 6)

Page 16: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

Source: Author compilation (Hinako Maruyama) based on IPPUC (2009a), Hattori (2004)

Major advantage of TOD as in case of Curitiba & Guangzhou include reduction in sprawl and protecting existing neighbourhoods, reduction in commuting times and traffic congestion

Page 17: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

Through impact charges value capture can be made.

COMMERCIAL ZONE, C-1

RESIDENTIAL ZONE, R-1(A)

RESIDENTIAL ZONE, R-1(B)

LEGEND

RESIDENTIAL ZONE, R-2

GAMTAL

ROAD

WATER

RECREATION_PARKS+GARDENS

RIVER

A zoning policy that will allows all new developments in the vicinity of BRTS corridor to have a FSI 1.8 plus an additional F.S.I of 1.2.

NORTH

Page 18: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

Built form of the building near the Brts stops will incorporate open plaza which will provide

facilities like food joints, cafes and sitting space for refreshment purpose.

Proposed plots will have area that varies from 1500 to 3000 sq mts with the front age of the plots that varies from 40 to 50 mts and the depth that varies from 50 to 60 mts. The frontage setback margin of 7.5 mts is proposed.

Regulations for proposed built form

Existing built form Proposed built form

Page 19: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II) Provision of pedestrian street for Creating attractive public and semi-public outdoor amenity spaces such as green spaces with trees, courtyards, outdoor cafés, seating

Designing a street section to facilitate smooth circulation of vehicles and Pedestrian movement

Page 20: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

Strategies

Land use zoning along the Metro

route

Regulations for proposed built form

Street section that facilitate smooth Pedestrian movement

and street activity.

Project 3:

Proposal for Arterial road along Metro corridor.

Maximize the benefits offered by the transit corridor like Metro through Paldi

Page 21: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

Through impact charges value capture can be made.

COMMERCIAL ZONE, C-1

RESIDENTIAL ZONE, R-1(A)

RESIDENTIAL ZONE, R-1(B)

LEGEND

RESIDENTIAL ZONE, R-2

GAMTAL

ROAD

WATER

RECREATION_PARKS+GARDENS

RIVER

A zoning policy that will allows all new developments in the vicinity of Metro corridor to have a FSI 1.8 plus an additional F.S.I of 1.2.

INSTITUTIONAL

NORTH

Page 22: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

Proposed plots should have area that varies from 1500 to 3000 sq mts with the front age of the plots that varies from 40 to 50 mts and the depth that varies from 50 to 60 mts. The frontage setback margin of 7.5 mts is proposed.

Existing built form Proposed built form

Regulations for proposed built form

Page 23: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

Designing a street section to facilitate smooth circulation of vehicles and Pedestrian movement

The metro lane will be 40mts which will incorporate carriage ways, medians, sidewalks, service lane parking space. Provision of colonnade of trees for shading purpose on the pedestrian street.

Zone C-1 Sidewalk

Carriage Way

Metro corridor

Service lane

Median Zone C-1Sidewalk

Service lane

MedianCarriage Way

Page 24: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

Project 4:

Proposal for Sabarmati River front Reclaimed land.

Adopting a use that maximizes the benefit of reclaimed land of Sabarmati river front.

Page 25: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

Proposing green park and recreation for the reclaimed land.

Recreation facilities : • Plazas• Amphitheatre• Theme gardens• Food court• Haat• Public utilities• Jogging tracks

PlazasAmphitheatre

NORTH

Page 26: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

Proposing mixed land use consisting of offices, retail shops, restaurants and residential for the land along side the reclaimed land falling under the residential zone 1-A.

Zone R1-a Side walk

Road Recreation park

Haat Plaza Jogging track

Promenade

River

Page 27: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

Ten stories towers aligned at an angle that allows maximum no. of residential units a view of the river and climatically aligns the longer sides of the building along the north south direction

PROPOSED BUILT FORM

Page 28: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

Costing

Total area of Sabarmati river front : 20,5000 sq Mts

Total costing for tree plantation : 1 lacs

Total costing for grass : 40 lacs

Area under paving for pathways is considered to be 15% of the total area : 30,000 sq MtsCosting for paving : 190 lacs

Excavation, Filling and street furniture and Lighting : 19 lacs

Total cost of constructing a recreation space and green park along the Sabarmati river front reclaimed land is 2.5 Crores

Page 29: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

Project 5:

Improve the Road network and Its level of Service.

Page 30: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

Bottleneck problem result in congestion

Junction problem

On street hawking

TrafficCongestion

Problem

EXISTING ROAD HEIRARCHY MAP

PROBLEMS are Non uniform road width, No Pedestrian, On Street hawking, Junction management, no medians.

On Street hawking No median

NORTH

Page 31: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

PROPOSED COLLECTOR

PROPOSED LOCAL

FEATURES- Constructing new roads and widening of road.

BENEFITS-

Smooth flow of Traffic. Pedestrian Friendly.Reduce Congestion. Reduce Conflict points/accidents. Improved Accessibility. Improve Mobility.

PROPOSED ROAD HEIRARCHY MAP

NORTH

Page 32: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

1.5

12

1.5

14

12

17

1.51.5

1.5 9 1.5

12

1.5 1.57.0 7.0

17

7.0 1.5

6 6

17

7.0

7.0 1.5

17

7.0

17

STAGGERED JUNCTION 4-LEGGED JUNCTION

LOCAL ROAD SECTION COLLECTOR ROAD SECTION

Page 33: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

HEIRARCHYEXISTING

LENGTH WIDTH

PROPOSED

LENGTH WIDTH

ARTERIAL

LOCAL

30-40

8-15

5-8

40

17

12

COLLECTOR

8241

14332

27526

11338

20733

22165

Arterial

Collector

Local

0 5000 10000 15000 20000 25000 30000

Proposed

Existing

Length

Road

Typ

e

HEIRARCHYAVERAGE

WIDTH TO BEINCREASED

ARTERIAL

LOCAL

COLLECTOR

PROPOSED LENGTHFOR ROAD WIDENING

8241

20539

21316

5

5

5

COST

3.2 cr

8.2 cr

8.5 cr

HEIRARCHY PROPOSEDWIDTH

ARTERIAL

LOCAL

COLLECTOR

3097

194

849

40

17

12

COST

2.16 cr

0.6 cr

PROPOSED NEWLENGTH OF ROAD

0.15 cr

Total cost required for road widening is 20 crore. Project can be financed through sale of advertisement rights along Arterial and collector roads.

Note :- We are not considering road widening of arterial road (Sabarmati) as cost will be incurred by the city not by the ward

37.6

44.7

19.6

Page 34: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

EXISTING BLOCK MAP

Block with perimeter more than 700 have more walk able distance which requires to be reduced.

Blocks with Perimeter more than 700 Mts and above

Blocks with Perimeter 0-500 Mts.

Blocks with Perimeter more than 500-700 Mts

700 and Above52%

500-70019%

Less than 50029%

Existing Block Perimeter

NORTH

Page 35: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

Paldi

Kochrab

Madalpur

Fatehpura

ELLIS BRIDGE

N.I.D.

TAGOREHALL

SANSKARKENRDA

PALDI BUSSTAND

KOCHRABASHRAM

BURIALGROUND

Vajubhai Dave marg

Manubhai Jadhani marg

Implementation process includes land acquisition of private property, Monetary Remuneration to private owners, Incentive FSI to be awarded to the affected party

ExistingProposed

Existing buildings

Affected buildings

Map showing how many blocks are

restructured because of proposed new road and

road wideningNORTH

Page 36: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

PROPOSED BLOCK MAP

Total number of restructured blocks 45Building affected by restructuring of blocks are about 50

700 and Above42%

500-70026%

Less than 50032%

Proposed Block Perimeter

NORTH

Page 37: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

Project 6:

Relocation of Paldi bus stop and Proposal for metro station and feeder routes.

.

Page 38: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

Proposing land for the metro stations.

• BRTS Corridor is going across the Paldi ward, it

covers Three Bus stops, namely Chandranagar,

Anjali, Dharnidhar.

• Proposed Metro corridor intersects Anjali Cross

Road and meets Paldi cross road and divides into

two ways, namely Law garden and NID.

• We are proposing Two Metro Stations, one is

near Anjali Cross Road and the other one is near

Paldi Bus Stop.

• The distance between two stations is 1.4 kms.

Dharnidhar

Anjali

Chandra Naga

r

BRTS Corridor

Metro Station 1

Metro Station 2

Metro Corridor

1.4 kms

Page 39: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

•This metro station is located near the Anjali cross roads.

•The private open space near the station will be used as commuters Parking.

•This commuter parking is useful for using Anjali BRTS also.

Metro station-1

Anjali BRTs

Metro stationParking

Page 40: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

Multi-story Parking

Met

ro

Stati

on

Paldi BusStation

•This metro station is located near the Paldi cross roads.

•This is a terminal point, one is going across the Law Garden and another one is going across the NID.

• Provision of Multi-story Parking near Metro Station.

•Implementation process for construction of multi-story parking will includes land acquisition of private property, Monetary Remuneration to private owners, Incentive FSI to be awarded to the affected party.

Metro station-2

Page 41: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

EXISTING PROBLEMS AT BUS STAND:

•It creates 28 conflicts

•Irregular traffic flow

•No proper medians

•Insufficient Parking facilities for commuters

•Improper toilets and other facilities

•Improper traffic management

Relocation of the Paldi bus station.

Page 42: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

• Relocation of Paldi Bus Stand to the Amul park near the Paldi Gamtal.

Benefits :

•It provide safe movement of vehicular traffic.

• it will increases the Traffic flow.

•Parking facilities also provided for commuters.

Relocation of the Paldi bus station.

Parking

ExistingPaldi BusStop

Commercial

ProposedBus Stop

Page 43: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

Proposal for feeder routes for BRTs

A Feeder bus is a local bus service that picks up and delivers passengers to Bus Rapid Transit Station.

Three Feeder CorridorsCorridor1: BlueTotal Length: 4.73 kmsDirection: One way (clock wise)

Corridor2: YellowTotal length: 4.76kmsDirection: One way (clock wise)

Corridor3: GreenTotal length: 6.73kmsDirection: Two way

NORTH

Page 44: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

Objective 2

Enhancing the Residential Character of the area

Strategies

Up gradation of slums

Provision of green/open spaces in the ward.

Page 45: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

Project 7:

To provide E.W.S. Housing for relocated slumDwellers

.

Enhance the residential character of the area

Page 46: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II) Sukhpura Slums(Near Hira Bagh Crossing)Total Houses:305Total Population:1850Area:9100sq mt

Slums near Memon Society(Besides Paldi Gamtal)Total Houses:52Total Population:350Area:7816sq mt

C

B

Kashmir Society Slums(Near Jai Bhikku Marg)Total Houses:62Total Population:400Area:2562 sq mt

Slums(Near Shahi Masgid)Total Houses:10Total Population:60Area:496sq mt

Government has already taken steps for improving sanitation by providing new sewer lines with bigger diameter & toilets to individual households at affordable cost of 2000 Rs

Major occupation of the people include serving the nearby areas , street vending. and working in AMC as sweepers. Houses are temporarily constructed and lack of Basic Infrastructure facilities.

DA

Page 47: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

PaldiGamtal

Site for EWS

S

CDA

B

IMPLEMENTATION:-EWS housing for slums is constructed under Rajiv Awaas Yojana.

INVESTMENT REQUIRED

TOTAL AREA OF SITE 7816 SQMTREQUIRED AREA FOR FOR EWS HOUSING 3500 SQMT AREA LEFT 4316 SQMTNO.OF UNITS 105NO OF UNITS ON G.FL 24NO.OF FLOORS 4 BUILT UP AREA 30 SQMTTOTAL BUILT UP 3465 SQMTPER SQMT COST 4893COST PER UNIT RS 1,46,790

TOTAL COST RS 1,69,54,245=1.7 crore

.

1.Removal of slums marked as Band C

2.Relocation of slum (72 Dwelling Units) to area marked as D

Page 48: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

SITE PLAN PLAN OF ONE BLOCK

Benefits of EWS housing includes Healthy living, Closer work places, Better access to roads, access to safe drinking water

FEATURESDwelling Unit of 30 sqm. area with one room kitchen bathroom provided

Amenities Provided·Drainage Line·Water Supply Network &Storage·Compound Wall·Internal Road Network·Street Lighting·Tree Plantation

Page 49: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

Project 8:

Provision of green/open spaces in the ward..

Enhance the residential character of the area

Page 50: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

EXISTING GREEN SPACESPer capita green space is 0.67sqmt/personwhich is 1% of the total area

Most of the area does not have access to any park up to 500 Mts from their place of work or living

30%

70%

Percentage of area served by green spaces

Served

Not served

NORTH

Page 51: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

AMC VACANT LAND

DILAPIDATED BUILDINGS

OPEN VACANT LAND

SABARMATI RECLAIMED LAND

LEGEND

7%

1%

12%

59%

21%

Break up of proposed green spaces

AMC land

Vacant

Delapidated Buildings

Sabarmati River front reclaimed land

Existing

PROPOSED GREEN SPACESPer capita green space is 3.0 sqmt/personwhich is 4.9% of the total area

FEATURES – Redeveloped the existing green spaces and develop the proposed green spaces.

NORTH

Page 52: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

Dilapidated buildings

Page 53: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

BENEFITS – Healthier environment and increased community interaction

Existing

Proposed

0 1 2 3 4 5 6

1

4.9

Green Space Percentage

- Green spaces

Proposed green spaces Per capita green space is 3.0 sqmt/person Investment required for the development and maintenance of garden is 3.3 cr

NORTH

Page 54: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

Existing Proposed

IMPLEMENTATION – Through Ahmedabad municipal cooperation (AMC).In corporation of green spaces within the Block

Page 55: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

Project Priorities

1. Road Widening To promote development without congestion

2. Land use zoning along• BRTs • Metro Corridor

3. Proposal for Feeder Routes

To have high densities along transit corridors

4. Sabarmati River front5. Green space Project6. EWS housing7. Proposal for Relocation of Paldi Bus stop

Development Enhancing the residential character

Page 56: Case study of Paldi, Ahmedabad

Area Planning Lab 2012 Paldi Ward-40 (Group II)

THANK YOU