cv - patrick byrne

2
Patrick Byrne CORE SKILLS & EXPERIENCE 5 years’ experience within the construction industry as an Assistant/Junior surveyor. Working on some of the biggest and most prestigious projects in London including The Shard, Crossrail, Southbank Tower, DP World London Gateway Port. Working alongside Senior and project surveyors assisting and partaking in various types of survey work. Through this time I have acquired and developed all different aspects of setting-out and survey procedures , Including ; Setting out (Grid lines , control) Datum transfers Monitoring AS- Built Laser Scanning Topographical surveys Traversing Levelling SCL Works at Stepney Green site Wriggle Surveys Measured Building Surveys As built of First stage concrete I am currently working as a junior surveyor for DSJV Eastern running tunnels and have been for the past 2 and half years on the largest part of the Crossrail project worth in excess of £650m. During this time I have become very familiar with working on the Tunnel boring machine and also working on Crosspasages using software such as TMS. Working a 12 hour shift pattern (7/3 - 7/4). Throughout this time I also worked on the SCL at Stepney Green. I also hold a full UK Driving licence. PERSONAL DETAILS ADDRESS 21 Sugden Way, Barking, Essex, IG11 ONJ EMAIL [email protected] TELEPHONE 07972917649 NATIONALITY British DOB 11/03/1993 EMPLOYMENT DATES: September 2011-2014 – SES / September 2014 To present – Crossrail , TGT JOB TITLE: Junior Surveyor COMPANY: Site Engineering Surveys, Tommy Gallagher Tunnelling

Upload: patrick-byrne

Post on 15-Jan-2017

31 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: CV - Patrick Byrne

Patrick Byrne

CORE SKILLS & EXPERIENCE

5 years’ experience within the construction industry as an Assistant/Junior surveyor. Working on some of the biggest and most prestigious projects in London including The

Shard, Crossrail, Southbank Tower, DP World London Gateway Port. Working alongside Senior and project surveyors assisting and partaking in various types of

survey work. Through this time I have acquired and developed all different aspects of setting-out and survey procedures , Including ;

Setting out (Grid lines , control) Datum transfers Monitoring AS- Built Laser Scanning Topographical surveys Traversing Levelling SCL Works at Stepney Green site Wriggle Surveys Measured Building Surveys As built of First stage concrete I am currently working as a junior surveyor for DSJV Eastern running tunnels and have been

for the past 2 and half years on the largest part of the Crossrail project worth in excess of £650m. During this time I have become very familiar with working on the Tunnel boring machine and also working on Crosspasages using software such as TMS.

Working a 12 hour shift pattern (7/3 - 7/4). Throughout this time I also worked on the SCL at Stepney Green. I also hold a full UK Driving licence.

PERSONAL DETAILS

ADDRESS 21 Sugden Way, Barking, Essex, IG11 ONJ

EMAIL [email protected]

TELEPHONE 07972917649

NATIONALITY British

DOB 11/03/1993

EMPLOYMENT

DATES: September 2011-2014 – SES / September 2014 To present – Crossrail , TGT

JOB TITLE: Junior Surveyor

COMPANY: Site Engineering Surveys, Tommy Gallagher Tunnelling

ADDITIONAL SKILLS/ATTRIBUTES

Tunnel safety card Confined space trained Harness trained CSCS Passed Leica TS30, TS15 – TPS Series Total Station, Leica DNA03, VMT Tunnel Boring Machine

Page 2: CV - Patrick Byrne

EDUCATION

Barking Abbey Comprehensive School (5 Years)

QUALIFICATIONS: GCSE Physical Education Grade BEnglish Language Grade CEnglish Literature Grade CMaths Grade BEngineering Grade BScience Grade CHistory Grade C

References References can be supplied upon request.