. C
AutoCAD SHX Text
1.PREPARE SUBSTRATE FOR INSTALLATION OF NEW ROOF SYSTEM ON AREAS PREPARE SUBSTRATE FOR INSTALLATION OF NEW ROOF SYSTEM ON AREAS SUBSTRATE FOR INSTALLATION OF NEW ROOF SYSTEM ON AREAS SUBSTRATE FOR INSTALLATION OF NEW ROOF SYSTEM ON AREAS FOR INSTALLATION OF NEW ROOF SYSTEM ON AREAS FOR INSTALLATION OF NEW ROOF SYSTEM ON AREAS INSTALLATION OF NEW ROOF SYSTEM ON AREAS INSTALLATION OF NEW ROOF SYSTEM ON AREAS OF NEW ROOF SYSTEM ON AREAS OF NEW ROOF SYSTEM ON AREAS NEW ROOF SYSTEM ON AREAS NEW ROOF SYSTEM ON AREAS ROOF SYSTEM ON AREAS ROOF SYSTEM ON AREAS SYSTEM ON AREAS SYSTEM ON AREAS ON AREAS ON AREAS AREAS AREAS C1, C2 AND C3. REPAIR DAMAGED OR DETERIORATED DECK TO MATCH C2 AND C3. REPAIR DAMAGED OR DETERIORATED DECK TO MATCH C2 AND C3. REPAIR DAMAGED OR DETERIORATED DECK TO MATCH AND C3. REPAIR DAMAGED OR DETERIORATED DECK TO MATCH AND C3. REPAIR DAMAGED OR DETERIORATED DECK TO MATCH C3. REPAIR DAMAGED OR DETERIORATED DECK TO MATCH C3. REPAIR DAMAGED OR DETERIORATED DECK TO MATCH REPAIR DAMAGED OR DETERIORATED DECK TO MATCH REPAIR DAMAGED OR DETERIORATED DECK TO MATCH REPAIR DAMAGED OR DETERIORATED DECK TO MATCH DAMAGED OR DETERIORATED DECK TO MATCH DAMAGED OR DETERIORATED DECK TO MATCH OR DETERIORATED DECK TO MATCH OR DETERIORATED DECK TO MATCH DETERIORATED DECK TO MATCH DETERIORATED DECK TO MATCH DECK TO MATCH DECK TO MATCH TO MATCH TO MATCH MATCH MATCH EXISTING IN ACCORDANCE WITH SPECIFICATIONS. PRIME CONCRETE AS IN ACCORDANCE WITH SPECIFICATIONS. PRIME CONCRETE AS IN ACCORDANCE WITH SPECIFICATIONS. PRIME CONCRETE AS ACCORDANCE WITH SPECIFICATIONS. PRIME CONCRETE AS ACCORDANCE WITH SPECIFICATIONS. PRIME CONCRETE AS WITH SPECIFICATIONS. PRIME CONCRETE AS WITH SPECIFICATIONS. PRIME CONCRETE AS SPECIFICATIONS. PRIME CONCRETE AS SPECIFICATIONS. PRIME CONCRETE AS PRIME CONCRETE AS PRIME CONCRETE AS PRIME CONCRETE AS CONCRETE AS CONCRETE AS AS AS REQUIRED. INSTALL NEW ROOF SYSTEM AND FLASHINGS IN ACCORDANCE INSTALL NEW ROOF SYSTEM AND FLASHINGS IN ACCORDANCE INSTALL NEW ROOF SYSTEM AND FLASHINGS IN ACCORDANCE INSTALL NEW ROOF SYSTEM AND FLASHINGS IN ACCORDANCE NEW ROOF SYSTEM AND FLASHINGS IN ACCORDANCE NEW ROOF SYSTEM AND FLASHINGS IN ACCORDANCE ROOF SYSTEM AND FLASHINGS IN ACCORDANCE ROOF SYSTEM AND FLASHINGS IN ACCORDANCE SYSTEM AND FLASHINGS IN ACCORDANCE SYSTEM AND FLASHINGS IN ACCORDANCE AND FLASHINGS IN ACCORDANCE AND FLASHINGS IN ACCORDANCE FLASHINGS IN ACCORDANCE FLASHINGS IN ACCORDANCE IN ACCORDANCE IN ACCORDANCE ACCORDANCE ACCORDANCE WITH PLANS, SPECIFICATIONS AND MANUFACTURER'S RECOMMENDATIONS. 2.INSTALL ALL NEW BASE FLASHINGS, WALL FLASHINGS, METAL FLASHINGS, INSTALL ALL NEW BASE FLASHINGS, WALL FLASHINGS, METAL FLASHINGS, ALL NEW BASE FLASHINGS, WALL FLASHINGS, METAL FLASHINGS, ALL NEW BASE FLASHINGS, WALL FLASHINGS, METAL FLASHINGS, NEW BASE FLASHINGS, WALL FLASHINGS, METAL FLASHINGS, NEW BASE FLASHINGS, WALL FLASHINGS, METAL FLASHINGS, BASE FLASHINGS, WALL FLASHINGS, METAL FLASHINGS, BASE FLASHINGS, WALL FLASHINGS, METAL FLASHINGS, FLASHINGS, WALL FLASHINGS, METAL FLASHINGS, FLASHINGS, WALL FLASHINGS, METAL FLASHINGS, WALL FLASHINGS, METAL FLASHINGS, WALL FLASHINGS, METAL FLASHINGS, FLASHINGS, METAL FLASHINGS, FLASHINGS, METAL FLASHINGS, METAL FLASHINGS, METAL FLASHINGS, FLASHINGS, FLASHINGS, METAL COPINGS, SCUPPERS, DOWNSPOUTS, COUNTER FLASHINGS, ETC. AS COPINGS, SCUPPERS, DOWNSPOUTS, COUNTER FLASHINGS, ETC. AS COPINGS, SCUPPERS, DOWNSPOUTS, COUNTER FLASHINGS, ETC. AS SCUPPERS, DOWNSPOUTS, COUNTER FLASHINGS, ETC. AS SCUPPERS, DOWNSPOUTS, COUNTER FLASHINGS, ETC. AS DOWNSPOUTS, COUNTER FLASHINGS, ETC. AS DOWNSPOUTS, COUNTER FLASHINGS, ETC. AS COUNTER FLASHINGS, ETC. AS COUNTER FLASHINGS, ETC. AS FLASHINGS, ETC. AS FLASHINGS, ETC. AS ETC. AS ETC. AS AS AS REQUIRED. 3.REPAIR ROOF SYSTEM ON METAL ROOF AREAS. REAPPLY SEALANT AT ALL REPAIR ROOF SYSTEM ON METAL ROOF AREAS. REAPPLY SEALANT AT ALL ROOF SYSTEM ON METAL ROOF AREAS. REAPPLY SEALANT AT ALL ROOF SYSTEM ON METAL ROOF AREAS. REAPPLY SEALANT AT ALL SYSTEM ON METAL ROOF AREAS. REAPPLY SEALANT AT ALL SYSTEM ON METAL ROOF AREAS. REAPPLY SEALANT AT ALL ON METAL ROOF AREAS. REAPPLY SEALANT AT ALL ON METAL ROOF AREAS. REAPPLY SEALANT AT ALL METAL ROOF AREAS. REAPPLY SEALANT AT ALL METAL ROOF AREAS. REAPPLY SEALANT AT ALL ROOF AREAS. REAPPLY SEALANT AT ALL ROOF AREAS. REAPPLY SEALANT AT ALL AREAS. REAPPLY SEALANT AT ALL AREAS. REAPPLY SEALANT AT ALL REAPPLY SEALANT AT ALL REAPPLY SEALANT AT ALL REAPPLY SEALANT AT ALL SEALANT AT ALL SEALANT AT ALL AT ALL AT ALL ALL ALL DETAILS, GUTTERS, EDGES, PENETRATIONS. CLEAN GUTTERS AND GUTTERS, EDGES, PENETRATIONS. CLEAN GUTTERS AND GUTTERS, EDGES, PENETRATIONS. CLEAN GUTTERS AND EDGES, PENETRATIONS. CLEAN GUTTERS AND EDGES, PENETRATIONS. CLEAN GUTTERS AND PENETRATIONS. CLEAN GUTTERS AND PENETRATIONS. CLEAN GUTTERS AND CLEAN GUTTERS AND CLEAN GUTTERS AND CLEAN GUTTERS AND GUTTERS AND GUTTERS AND AND AND DOWNSPOUTS, REATTACHED LOOSE METAL FLASHINGS. 4.WATER THAT REMAINS IN AN AREA ON THE ROOF LONGER THAN 48 HOURS WATER THAT REMAINS IN AN AREA ON THE ROOF LONGER THAN 48 HOURS THAT REMAINS IN AN AREA ON THE ROOF LONGER THAN 48 HOURS THAT REMAINS IN AN AREA ON THE ROOF LONGER THAN 48 HOURS REMAINS IN AN AREA ON THE ROOF LONGER THAN 48 HOURS REMAINS IN AN AREA ON THE ROOF LONGER THAN 48 HOURS IN AN AREA ON THE ROOF LONGER THAN 48 HOURS IN AN AREA ON THE ROOF LONGER THAN 48 HOURS AN AREA ON THE ROOF LONGER THAN 48 HOURS AN AREA ON THE ROOF LONGER THAN 48 HOURS AREA ON THE ROOF LONGER THAN 48 HOURS AREA ON THE ROOF LONGER THAN 48 HOURS ON THE ROOF LONGER THAN 48 HOURS ON THE ROOF LONGER THAN 48 HOURS THE ROOF LONGER THAN 48 HOURS THE ROOF LONGER THAN 48 HOURS ROOF LONGER THAN 48 HOURS ROOF LONGER THAN 48 HOURS LONGER THAN 48 HOURS LONGER THAN 48 HOURS THAN 48 HOURS THAN 48 HOURS 48 HOURS 48 HOURS HOURS HOURS AFTER THE CESSATION OF RAINFALL IS NOT ACCEPTABLE AND SHALL BE THE CESSATION OF RAINFALL IS NOT ACCEPTABLE AND SHALL BE THE CESSATION OF RAINFALL IS NOT ACCEPTABLE AND SHALL BE CESSATION OF RAINFALL IS NOT ACCEPTABLE AND SHALL BE CESSATION OF RAINFALL IS NOT ACCEPTABLE AND SHALL BE OF RAINFALL IS NOT ACCEPTABLE AND SHALL BE OF RAINFALL IS NOT ACCEPTABLE AND SHALL BE RAINFALL IS NOT ACCEPTABLE AND SHALL BE RAINFALL IS NOT ACCEPTABLE AND SHALL BE IS NOT ACCEPTABLE AND SHALL BE IS NOT ACCEPTABLE AND SHALL BE NOT ACCEPTABLE AND SHALL BE NOT ACCEPTABLE AND SHALL BE ACCEPTABLE AND SHALL BE ACCEPTABLE AND SHALL BE AND SHALL BE AND SHALL BE SHALL BE SHALL BE BE BE CORRECTED IN AN ACCEPTABLE MANNER AT NO ADDITIONAL COST TO THE IN AN ACCEPTABLE MANNER AT NO ADDITIONAL COST TO THE IN AN ACCEPTABLE MANNER AT NO ADDITIONAL COST TO THE AN ACCEPTABLE MANNER AT NO ADDITIONAL COST TO THE AN ACCEPTABLE MANNER AT NO ADDITIONAL COST TO THE ACCEPTABLE MANNER AT NO ADDITIONAL COST TO THE ACCEPTABLE MANNER AT NO ADDITIONAL COST TO THE MANNER AT NO ADDITIONAL COST TO THE MANNER AT NO ADDITIONAL COST TO THE AT NO ADDITIONAL COST TO THE AT NO ADDITIONAL COST TO THE NO ADDITIONAL COST TO THE NO ADDITIONAL COST TO THE ADDITIONAL COST TO THE ADDITIONAL COST TO THE COST TO THE COST TO THE TO THE TO THE THE THE OWNER. 5.WALKWAY PADS SHALL BE PROVIDED AND INSTALLED FROM ALL ENTRY WALKWAY PADS SHALL BE PROVIDED AND INSTALLED FROM ALL ENTRY PADS SHALL BE PROVIDED AND INSTALLED FROM ALL ENTRY PADS SHALL BE PROVIDED AND INSTALLED FROM ALL ENTRY SHALL BE PROVIDED AND INSTALLED FROM ALL ENTRY SHALL BE PROVIDED AND INSTALLED FROM ALL ENTRY BE PROVIDED AND INSTALLED FROM ALL ENTRY BE PROVIDED AND INSTALLED FROM ALL ENTRY PROVIDED AND INSTALLED FROM ALL ENTRY PROVIDED AND INSTALLED FROM ALL ENTRY AND INSTALLED FROM ALL ENTRY AND INSTALLED FROM ALL ENTRY INSTALLED FROM ALL ENTRY INSTALLED FROM ALL ENTRY FROM ALL ENTRY FROM ALL ENTRY ALL ENTRY ALL ENTRY ENTRY ENTRY POINTS TO AND AROUND ALL SERVICEABLE ROOF TOP EQUIPMENT. TO AND AROUND ALL SERVICEABLE ROOF TOP EQUIPMENT. TO AND AROUND ALL SERVICEABLE ROOF TOP EQUIPMENT. AND AROUND ALL SERVICEABLE ROOF TOP EQUIPMENT. AND AROUND ALL SERVICEABLE ROOF TOP EQUIPMENT. AROUND ALL SERVICEABLE ROOF TOP EQUIPMENT. AROUND ALL SERVICEABLE ROOF TOP EQUIPMENT. ALL SERVICEABLE ROOF TOP EQUIPMENT. ALL SERVICEABLE ROOF TOP EQUIPMENT. SERVICEABLE ROOF TOP EQUIPMENT. SERVICEABLE ROOF TOP EQUIPMENT. ROOF TOP EQUIPMENT. ROOF TOP EQUIPMENT. TOP EQUIPMENT. TOP EQUIPMENT. EQUIPMENT. EQUIPMENT. WALKWAY PAD PATHWAYS SHALL ALSO BE PROVIDED BETWEEN COMMON PAD PATHWAYS SHALL ALSO BE PROVIDED BETWEEN COMMON PAD PATHWAYS SHALL ALSO BE PROVIDED BETWEEN COMMON PATHWAYS SHALL ALSO BE PROVIDED BETWEEN COMMON PATHWAYS SHALL ALSO BE PROVIDED BETWEEN COMMON SHALL ALSO BE PROVIDED BETWEEN COMMON SHALL ALSO BE PROVIDED BETWEEN COMMON ALSO BE PROVIDED BETWEEN COMMON ALSO BE PROVIDED BETWEEN COMMON BE PROVIDED BETWEEN COMMON BE PROVIDED BETWEEN COMMON PROVIDED BETWEEN COMMON PROVIDED BETWEEN COMMON BETWEEN COMMON BETWEEN COMMON COMMON COMMON ROUTES (I.E. BETWEEN THE ROOF HATCH AND ACCESS LADDERS TO (I.E. BETWEEN THE ROOF HATCH AND ACCESS LADDERS TO (I.E. BETWEEN THE ROOF HATCH AND ACCESS LADDERS TO BETWEEN THE ROOF HATCH AND ACCESS LADDERS TO BETWEEN THE ROOF HATCH AND ACCESS LADDERS TO THE ROOF HATCH AND ACCESS LADDERS TO THE ROOF HATCH AND ACCESS LADDERS TO ROOF HATCH AND ACCESS LADDERS TO ROOF HATCH AND ACCESS LADDERS TO HATCH AND ACCESS LADDERS TO HATCH AND ACCESS LADDERS TO AND ACCESS LADDERS TO AND ACCESS LADDERS TO ACCESS LADDERS TO ACCESS LADDERS TO LADDERS TO LADDERS TO TO TO ANOTHER ROOF AREA ETC.) IN NO INSTANCE SHALL WALKWAY PADS BE ROOF AREA ETC.) IN NO INSTANCE SHALL WALKWAY PADS BE ROOF AREA ETC.) IN NO INSTANCE SHALL WALKWAY PADS BE AREA ETC.) IN NO INSTANCE SHALL WALKWAY PADS BE AREA ETC.) IN NO INSTANCE SHALL WALKWAY PADS BE ETC.) IN NO INSTANCE SHALL WALKWAY PADS BE ETC.) IN NO INSTANCE SHALL WALKWAY PADS BE IN NO INSTANCE SHALL WALKWAY PADS BE IN NO INSTANCE SHALL WALKWAY PADS BE IN NO INSTANCE SHALL WALKWAY PADS BE NO INSTANCE SHALL WALKWAY PADS BE NO INSTANCE SHALL WALKWAY PADS BE INSTANCE SHALL WALKWAY PADS BE INSTANCE SHALL WALKWAY PADS BE SHALL WALKWAY PADS BE SHALL WALKWAY PADS BE WALKWAY PADS BE WALKWAY PADS BE PADS BE PADS BE BE BE INSTALLED OVER A SEAM OR LAP. ORIENT WALKWAY PADS TO ALLOW FOR OVER A SEAM OR LAP. ORIENT WALKWAY PADS TO ALLOW FOR OVER A SEAM OR LAP. ORIENT WALKWAY PADS TO ALLOW FOR A SEAM OR LAP. ORIENT WALKWAY PADS TO ALLOW FOR A SEAM OR LAP. ORIENT WALKWAY PADS TO ALLOW FOR SEAM OR LAP. ORIENT WALKWAY PADS TO ALLOW FOR SEAM OR LAP. ORIENT WALKWAY PADS TO ALLOW FOR OR LAP. ORIENT WALKWAY PADS TO ALLOW FOR OR LAP. ORIENT WALKWAY PADS TO ALLOW FOR LAP. ORIENT WALKWAY PADS TO ALLOW FOR LAP. ORIENT WALKWAY PADS TO ALLOW FOR ORIENT WALKWAY PADS TO ALLOW FOR ORIENT WALKWAY PADS TO ALLOW FOR ORIENT WALKWAY PADS TO ALLOW FOR WALKWAY PADS TO ALLOW FOR WALKWAY PADS TO ALLOW FOR PADS TO ALLOW FOR PADS TO ALLOW FOR TO ALLOW FOR TO ALLOW FOR ALLOW FOR ALLOW FOR FOR FOR MAXIMUM DRAINAGE, DO NOT RUN CONTINUOUS WALKWAY PAD THROUGH DRAINAGE, DO NOT RUN CONTINUOUS WALKWAY PAD THROUGH DRAINAGE, DO NOT RUN CONTINUOUS WALKWAY PAD THROUGH DO NOT RUN CONTINUOUS WALKWAY PAD THROUGH DO NOT RUN CONTINUOUS WALKWAY PAD THROUGH NOT RUN CONTINUOUS WALKWAY PAD THROUGH NOT RUN CONTINUOUS WALKWAY PAD THROUGH RUN CONTINUOUS WALKWAY PAD THROUGH RUN CONTINUOUS WALKWAY PAD THROUGH CONTINUOUS WALKWAY PAD THROUGH CONTINUOUS WALKWAY PAD THROUGH WALKWAY PAD THROUGH WALKWAY PAD THROUGH PAD THROUGH PAD THROUGH THROUGH THROUGH VALLEYS. 6.A MINIMUM OF 12" SHALL BE PROVIDED BETWEEN ALL PENETRATIONS TO A MINIMUM OF 12" SHALL BE PROVIDED BETWEEN ALL PENETRATIONS TO MINIMUM OF 12" SHALL BE PROVIDED BETWEEN ALL PENETRATIONS TO MINIMUM OF 12" SHALL BE PROVIDED BETWEEN ALL PENETRATIONS TO OF 12" SHALL BE PROVIDED BETWEEN ALL PENETRATIONS TO OF 12" SHALL BE PROVIDED BETWEEN ALL PENETRATIONS TO 12" SHALL BE PROVIDED BETWEEN ALL PENETRATIONS TO 12" SHALL BE PROVIDED BETWEEN ALL PENETRATIONS TO SHALL BE PROVIDED BETWEEN ALL PENETRATIONS TO SHALL BE PROVIDED BETWEEN ALL PENETRATIONS TO BE PROVIDED BETWEEN ALL PENETRATIONS TO BE PROVIDED BETWEEN ALL PENETRATIONS TO PROVIDED BETWEEN ALL PENETRATIONS TO PROVIDED BETWEEN ALL PENETRATIONS TO BETWEEN ALL PENETRATIONS TO BETWEEN ALL PENETRATIONS TO ALL PENETRATIONS TO ALL PENETRATIONS TO PENETRATIONS TO PENETRATIONS TO TO TO ALLOW FOR PROPER FLASHING. A MINIMUM OF 8" SHALL BE PROVIDED FOR PROPER FLASHING. A MINIMUM OF 8" SHALL BE PROVIDED FOR PROPER FLASHING. A MINIMUM OF 8" SHALL BE PROVIDED PROPER FLASHING. A MINIMUM OF 8" SHALL BE PROVIDED PROPER FLASHING. A MINIMUM OF 8" SHALL BE PROVIDED FLASHING. A MINIMUM OF 8" SHALL BE PROVIDED FLASHING. A MINIMUM OF 8" SHALL BE PROVIDED A MINIMUM OF 8" SHALL BE PROVIDED A MINIMUM OF 8" SHALL BE PROVIDED A MINIMUM OF 8" SHALL BE PROVIDED MINIMUM OF 8" SHALL BE PROVIDED MINIMUM OF 8" SHALL BE PROVIDED OF 8" SHALL BE PROVIDED OF 8" SHALL BE PROVIDED 8" SHALL BE PROVIDED 8" SHALL BE PROVIDED SHALL BE PROVIDED SHALL BE PROVIDED BE PROVIDED BE PROVIDED PROVIDED PROVIDED FOR ALL FLASHING HEIGHTS FROM TOP OF FINISHED ROOF SURFACE TO ALL FLASHING HEIGHTS FROM TOP OF FINISHED ROOF SURFACE TO ALL FLASHING HEIGHTS FROM TOP OF FINISHED ROOF SURFACE TO FLASHING HEIGHTS FROM TOP OF FINISHED ROOF SURFACE TO FLASHING HEIGHTS FROM TOP OF FINISHED ROOF SURFACE TO HEIGHTS FROM TOP OF FINISHED ROOF SURFACE TO HEIGHTS FROM TOP OF FINISHED ROOF SURFACE TO FROM TOP OF FINISHED ROOF SURFACE TO FROM TOP OF FINISHED ROOF SURFACE TO TOP OF FINISHED ROOF SURFACE TO TOP OF FINISHED ROOF SURFACE TO OF FINISHED ROOF SURFACE TO OF FINISHED ROOF SURFACE TO FINISHED ROOF SURFACE TO FINISHED ROOF SURFACE TO ROOF SURFACE TO ROOF SURFACE TO SURFACE TO SURFACE TO TO TO TOP OF ROOFING SYSTEM MATERIAL. 7.CONTRACTOR SHALL INCLUDE ALL MECHANICAL, ELECTRICAL AND PLUMBING CONTRACTOR SHALL INCLUDE ALL MECHANICAL, ELECTRICAL AND PLUMBING SHALL INCLUDE ALL MECHANICAL, ELECTRICAL AND PLUMBING SHALL INCLUDE ALL MECHANICAL, ELECTRICAL AND PLUMBING INCLUDE ALL MECHANICAL, ELECTRICAL AND PLUMBING INCLUDE ALL MECHANICAL, ELECTRICAL AND PLUMBING ALL MECHANICAL, ELECTRICAL AND PLUMBING ALL MECHANICAL, ELECTRICAL AND PLUMBING MECHANICAL, ELECTRICAL AND PLUMBING MECHANICAL, ELECTRICAL AND PLUMBING ELECTRICAL AND PLUMBING ELECTRICAL AND PLUMBING AND PLUMBING AND PLUMBING PLUMBING PLUMBING WORK REQUIRED FOR THE INSTALLATION OF THE NEW ROOF SYSTEM. REQUIRED FOR THE INSTALLATION OF THE NEW ROOF SYSTEM. REQUIRED FOR THE INSTALLATION OF THE NEW ROOF SYSTEM. FOR THE INSTALLATION OF THE NEW ROOF SYSTEM. FOR THE INSTALLATION OF THE NEW ROOF SYSTEM. THE INSTALLATION OF THE NEW ROOF SYSTEM. THE INSTALLATION OF THE NEW ROOF SYSTEM. INSTALLATION OF THE NEW ROOF SYSTEM. INSTALLATION OF THE NEW ROOF SYSTEM. OF THE NEW ROOF SYSTEM. OF THE NEW ROOF SYSTEM. THE NEW ROOF SYSTEM. THE NEW ROOF SYSTEM. NEW ROOF SYSTEM. NEW ROOF SYSTEM. ROOF SYSTEM. ROOF SYSTEM. SYSTEM. SYSTEM. INCLUDING BUT NOT LIMITED TO, DISCONNECTS, RECONNECTS, BALANCING, BUT NOT LIMITED TO, DISCONNECTS, RECONNECTS, BALANCING, BUT NOT LIMITED TO, DISCONNECTS, RECONNECTS, BALANCING, NOT LIMITED TO, DISCONNECTS, RECONNECTS, BALANCING, NOT LIMITED TO, DISCONNECTS, RECONNECTS, BALANCING, LIMITED TO, DISCONNECTS, RECONNECTS, BALANCING, LIMITED TO, DISCONNECTS, RECONNECTS, BALANCING, TO, DISCONNECTS, RECONNECTS, BALANCING, TO, DISCONNECTS, RECONNECTS, BALANCING, DISCONNECTS, RECONNECTS, BALANCING, DISCONNECTS, RECONNECTS, BALANCING, RECONNECTS, BALANCING, RECONNECTS, BALANCING, BALANCING, BALANCING, RAISING, RELOCATING, EXTENDING, ETC. AS REQUIRED TO COMPLETE ROOF RELOCATING, EXTENDING, ETC. AS REQUIRED TO COMPLETE ROOF RELOCATING, EXTENDING, ETC. AS REQUIRED TO COMPLETE ROOF EXTENDING, ETC. AS REQUIRED TO COMPLETE ROOF EXTENDING, ETC. AS REQUIRED TO COMPLETE ROOF ETC. AS REQUIRED TO COMPLETE ROOF ETC. AS REQUIRED TO COMPLETE ROOF AS REQUIRED TO COMPLETE ROOF AS REQUIRED TO COMPLETE ROOF REQUIRED TO COMPLETE ROOF REQUIRED TO COMPLETE ROOF TO COMPLETE ROOF TO COMPLETE ROOF COMPLETE ROOF COMPLETE ROOF ROOF ROOF REPLACEMENT IN ACCORDANCE WITH PLANS AND SPECIFICATIONS. 8.CRICKETS SHALL BE INSTALLED ON THE HIGH SIDE OF ALL PENETRATIONS CRICKETS SHALL BE INSTALLED ON THE HIGH SIDE OF ALL PENETRATIONS SHALL BE INSTALLED ON THE HIGH SIDE OF ALL PENETRATIONS SHALL BE INSTALLED ON THE HIGH SIDE OF ALL PENETRATIONS BE INSTALLED ON THE HIGH SIDE OF ALL PENETRATIONS BE INSTALLED ON THE HIGH SIDE OF ALL PENETRATIONS INSTALLED ON THE HIGH SIDE OF ALL PENETRATIONS INSTALLED ON THE HIGH SIDE OF ALL PENETRATIONS ON THE HIGH SIDE OF ALL PENETRATIONS ON THE HIGH SIDE OF ALL PENETRATIONS THE HIGH SIDE OF ALL PENETRATIONS THE HIGH SIDE OF ALL PENETRATIONS HIGH SIDE OF ALL PENETRATIONS HIGH SIDE OF ALL PENETRATIONS SIDE OF ALL PENETRATIONS SIDE OF ALL PENETRATIONS OF ALL PENETRATIONS OF ALL PENETRATIONS ALL PENETRATIONS ALL PENETRATIONS PENETRATIONS PENETRATIONS 12" OR LARGER TO DIVERT WATER AROUND PENETRATIONS. 9.MATERIAL SHALL BE STAGED AND STORED TO PREVENT DAMAGES TO THE MATERIAL SHALL BE STAGED AND STORED TO PREVENT DAMAGES TO THE SHALL BE STAGED AND STORED TO PREVENT DAMAGES TO THE SHALL BE STAGED AND STORED TO PREVENT DAMAGES TO THE BE STAGED AND STORED TO PREVENT DAMAGES TO THE BE STAGED AND STORED TO PREVENT DAMAGES TO THE STAGED AND STORED TO PREVENT DAMAGES TO THE STAGED AND STORED TO PREVENT DAMAGES TO THE AND STORED TO PREVENT DAMAGES TO THE AND STORED TO PREVENT DAMAGES TO THE STORED TO PREVENT DAMAGES TO THE STORED TO PREVENT DAMAGES TO THE TO PREVENT DAMAGES TO THE TO PREVENT DAMAGES TO THE PREVENT DAMAGES TO THE PREVENT DAMAGES TO THE DAMAGES TO THE DAMAGES TO THE TO THE TO THE THE THE BUILDING STRUCTURE AND / OR NEW MATERIALS. DAMAGE TO THE STRUCTURE AND / OR NEW MATERIALS. DAMAGE TO THE STRUCTURE AND / OR NEW MATERIALS. DAMAGE TO THE AND / OR NEW MATERIALS. DAMAGE TO THE AND / OR NEW MATERIALS. DAMAGE TO THE / OR NEW MATERIALS. DAMAGE TO THE / OR NEW MATERIALS. DAMAGE TO THE OR NEW MATERIALS. DAMAGE TO THE OR NEW MATERIALS. DAMAGE TO THE NEW MATERIALS. DAMAGE TO THE NEW MATERIALS. DAMAGE TO THE MATERIALS. DAMAGE TO THE MATERIALS. DAMAGE TO THE DAMAGE TO THE DAMAGE TO THE DAMAGE TO THE TO THE TO THE THE THE STRUCTURE SHALL BE REPAIRED / REPLACED AT NO ADDITIONAL COST TO SHALL BE REPAIRED / REPLACED AT NO ADDITIONAL COST TO SHALL BE REPAIRED / REPLACED AT NO ADDITIONAL COST TO BE REPAIRED / REPLACED AT NO ADDITIONAL COST TO BE REPAIRED / REPLACED AT NO ADDITIONAL COST TO REPAIRED / REPLACED AT NO ADDITIONAL COST TO REPAIRED / REPLACED AT NO ADDITIONAL COST TO / REPLACED AT NO ADDITIONAL COST TO / REPLACED AT NO ADDITIONAL COST TO REPLACED AT NO ADDITIONAL COST TO REPLACED AT NO ADDITIONAL COST TO AT NO ADDITIONAL COST TO AT NO ADDITIONAL COST TO NO ADDITIONAL COST TO NO ADDITIONAL COST TO ADDITIONAL COST TO ADDITIONAL COST TO COST TO COST TO TO TO THE OWNER. NEW MATERIALS DEEMED TO BE DAMAGED OR DETERIORATED OWNER. NEW MATERIALS DEEMED TO BE DAMAGED OR DETERIORATED OWNER. NEW MATERIALS DEEMED TO BE DAMAGED OR DETERIORATED NEW MATERIALS DEEMED TO BE DAMAGED OR DETERIORATED NEW MATERIALS DEEMED TO BE DAMAGED OR DETERIORATED NEW MATERIALS DEEMED TO BE DAMAGED OR DETERIORATED MATERIALS DEEMED TO BE DAMAGED OR DETERIORATED MATERIALS DEEMED TO BE DAMAGED OR DETERIORATED DEEMED TO BE DAMAGED OR DETERIORATED DEEMED TO BE DAMAGED OR DETERIORATED TO BE DAMAGED OR DETERIORATED TO BE DAMAGED OR DETERIORATED BE DAMAGED OR DETERIORATED BE DAMAGED OR DETERIORATED DAMAGED OR DETERIORATED DAMAGED OR DETERIORATED OR DETERIORATED OR DETERIORATED DETERIORATED DETERIORATED BY THE DESIGNER / OWNER SHALL BE REMOVED FROM THE PROJECT SITE THE DESIGNER / OWNER SHALL BE REMOVED FROM THE PROJECT SITE THE DESIGNER / OWNER SHALL BE REMOVED FROM THE PROJECT SITE DESIGNER / OWNER SHALL BE REMOVED FROM THE PROJECT SITE DESIGNER / OWNER SHALL BE REMOVED FROM THE PROJECT SITE / OWNER SHALL BE REMOVED FROM THE PROJECT SITE / OWNER SHALL BE REMOVED FROM THE PROJECT SITE OWNER SHALL BE REMOVED FROM THE PROJECT SITE OWNER SHALL BE REMOVED FROM THE PROJECT SITE SHALL BE REMOVED FROM THE PROJECT SITE SHALL BE REMOVED FROM THE PROJECT SITE BE REMOVED FROM THE PROJECT SITE BE REMOVED FROM THE PROJECT SITE REMOVED FROM THE PROJECT SITE REMOVED FROM THE PROJECT SITE FROM THE PROJECT SITE FROM THE PROJECT SITE THE PROJECT SITE THE PROJECT SITE PROJECT SITE PROJECT SITE SITE SITE AND REPLACED WITH NEW MATERIALS AT NO ADDITIONAL COST TO THE REPLACED WITH NEW MATERIALS AT NO ADDITIONAL COST TO THE REPLACED WITH NEW MATERIALS AT NO ADDITIONAL COST TO THE WITH NEW MATERIALS AT NO ADDITIONAL COST TO THE WITH NEW MATERIALS AT NO ADDITIONAL COST TO THE NEW MATERIALS AT NO ADDITIONAL COST TO THE NEW MATERIALS AT NO ADDITIONAL COST TO THE MATERIALS AT NO ADDITIONAL COST TO THE MATERIALS AT NO ADDITIONAL COST TO THE AT NO ADDITIONAL COST TO THE AT NO ADDITIONAL COST TO THE NO ADDITIONAL COST TO THE NO ADDITIONAL COST TO THE ADDITIONAL COST TO THE ADDITIONAL COST TO THE COST TO THE COST TO THE TO THE TO THE THE THE OWNER. REMOVE ALL WET OR DETERIORATED DECKING, INSULATION OR REMOVE ALL WET OR DETERIORATED DECKING, INSULATION OR REMOVE ALL WET OR DETERIORATED DECKING, INSULATION OR REMOVE ALL WET OR DETERIORATED DECKING, INSULATION OR ALL WET OR DETERIORATED DECKING, INSULATION OR ALL WET OR DETERIORATED DECKING, INSULATION OR WET OR DETERIORATED DECKING, INSULATION OR WET OR DETERIORATED DECKING, INSULATION OR OR DETERIORATED DECKING, INSULATION OR OR DETERIORATED DECKING, INSULATION OR DETERIORATED DECKING, INSULATION OR DETERIORATED DECKING, INSULATION OR DECKING, INSULATION OR DECKING, INSULATION OR INSULATION OR INSULATION OR OR OR ROOFING MATERIALS. 10.ALL ROOF TOP APPARATUSES / EQUIPMENT, SHALL BE PROPERLY SECURED ALL ROOF TOP APPARATUSES / EQUIPMENT, SHALL BE PROPERLY SECURED ROOF TOP APPARATUSES / EQUIPMENT, SHALL BE PROPERLY SECURED ROOF TOP APPARATUSES / EQUIPMENT, SHALL BE PROPERLY SECURED TOP APPARATUSES / EQUIPMENT, SHALL BE PROPERLY SECURED TOP APPARATUSES / EQUIPMENT, SHALL BE PROPERLY SECURED APPARATUSES / EQUIPMENT, SHALL BE PROPERLY SECURED APPARATUSES / EQUIPMENT, SHALL BE PROPERLY SECURED / EQUIPMENT, SHALL BE PROPERLY SECURED / EQUIPMENT, SHALL BE PROPERLY SECURED EQUIPMENT, SHALL BE PROPERLY SECURED EQUIPMENT, SHALL BE PROPERLY SECURED SHALL BE PROPERLY SECURED SHALL BE PROPERLY SECURED BE PROPERLY SECURED BE PROPERLY SECURED PROPERLY SECURED PROPERLY SECURED SECURED SECURED AND ATTACHED INCLUDING BUT NOT LIMITED TO, SKYLIGHTS, EXHAUST ATTACHED INCLUDING BUT NOT LIMITED TO, SKYLIGHTS, EXHAUST ATTACHED INCLUDING BUT NOT LIMITED TO, SKYLIGHTS, EXHAUST INCLUDING BUT NOT LIMITED TO, SKYLIGHTS, EXHAUST INCLUDING BUT NOT LIMITED TO, SKYLIGHTS, EXHAUST BUT NOT LIMITED TO, SKYLIGHTS, EXHAUST BUT NOT LIMITED TO, SKYLIGHTS, EXHAUST NOT LIMITED TO, SKYLIGHTS, EXHAUST NOT LIMITED TO, SKYLIGHTS, EXHAUST LIMITED TO, SKYLIGHTS, EXHAUST LIMITED TO, SKYLIGHTS, EXHAUST TO, SKYLIGHTS, EXHAUST TO, SKYLIGHTS, EXHAUST SKYLIGHTS, EXHAUST SKYLIGHTS, EXHAUST EXHAUST EXHAUST FANS, SATELLITE DISH, VENT CAPS, MECHANICAL UNITS, CONDUITS, DUCT SATELLITE DISH, VENT CAPS, MECHANICAL UNITS, CONDUITS, DUCT SATELLITE DISH, VENT CAPS, MECHANICAL UNITS, CONDUITS, DUCT DISH, VENT CAPS, MECHANICAL UNITS, CONDUITS, DUCT DISH, VENT CAPS, MECHANICAL UNITS, CONDUITS, DUCT VENT CAPS, MECHANICAL UNITS, CONDUITS, DUCT VENT CAPS, MECHANICAL UNITS, CONDUITS, DUCT CAPS, MECHANICAL UNITS, CONDUITS, DUCT CAPS, MECHANICAL UNITS, CONDUITS, DUCT MECHANICAL UNITS, CONDUITS, DUCT MECHANICAL UNITS, CONDUITS, DUCT UNITS, CONDUITS, DUCT UNITS, CONDUITS, DUCT CONDUITS, DUCT CONDUITS, DUCT DUCT DUCT WORK, PIPE SUPPORTS, ETC. MINIMUM OF TWO (2) GASKETED FASTENERS PIPE SUPPORTS, ETC. MINIMUM OF TWO (2) GASKETED FASTENERS PIPE SUPPORTS, ETC. MINIMUM OF TWO (2) GASKETED FASTENERS SUPPORTS, ETC. MINIMUM OF TWO (2) GASKETED FASTENERS SUPPORTS, ETC. MINIMUM OF TWO (2) GASKETED FASTENERS ETC. MINIMUM OF TWO (2) GASKETED FASTENERS ETC. MINIMUM OF TWO (2) GASKETED FASTENERS MINIMUM OF TWO (2) GASKETED FASTENERS MINIMUM OF TWO (2) GASKETED FASTENERS MINIMUM OF TWO (2) GASKETED FASTENERS OF TWO (2) GASKETED FASTENERS OF TWO (2) GASKETED FASTENERS TWO (2) GASKETED FASTENERS TWO (2) GASKETED FASTENERS (2) GASKETED FASTENERS (2) GASKETED FASTENERS GASKETED FASTENERS GASKETED FASTENERS FASTENERS FASTENERS PER SIDE AT A MINIMUM OF 12" O.C. 11.ALL EXPOSED FASTENERS SHALL BE GASKETED. ALL EXPOSED FASTENERS SHALL BE GASKETED. 12.PROVIDE SHEET METAL BACKER AT FRAMED WALLS WHERE ROOF IS PROVIDE SHEET METAL BACKER AT FRAMED WALLS WHERE ROOF IS SHEET METAL BACKER AT FRAMED WALLS WHERE ROOF IS SHEET METAL BACKER AT FRAMED WALLS WHERE ROOF IS METAL BACKER AT FRAMED WALLS WHERE ROOF IS METAL BACKER AT FRAMED WALLS WHERE ROOF IS BACKER AT FRAMED WALLS WHERE ROOF IS BACKER AT FRAMED WALLS WHERE ROOF IS AT FRAMED WALLS WHERE ROOF IS AT FRAMED WALLS WHERE ROOF IS FRAMED WALLS WHERE ROOF IS FRAMED WALLS WHERE ROOF IS WALLS WHERE ROOF IS WALLS WHERE ROOF IS WHERE ROOF IS WHERE ROOF IS ROOF IS ROOF IS IS IS TERMINATED WITH TERMINATION BAR OR PLATES AND FASTENERS. 13.NAILERS SHALL BE INSTALLED IN GENERAL CONFORMANCE WITH FM 1-49 NAILERS SHALL BE INSTALLED IN GENERAL CONFORMANCE WITH FM 1-49 SHALL BE INSTALLED IN GENERAL CONFORMANCE WITH FM 1-49 SHALL BE INSTALLED IN GENERAL CONFORMANCE WITH FM 1-49 BE INSTALLED IN GENERAL CONFORMANCE WITH FM 1-49 BE INSTALLED IN GENERAL CONFORMANCE WITH FM 1-49 INSTALLED IN GENERAL CONFORMANCE WITH FM 1-49 INSTALLED IN GENERAL CONFORMANCE WITH FM 1-49 IN GENERAL CONFORMANCE WITH FM 1-49 IN GENERAL CONFORMANCE WITH FM 1-49 GENERAL CONFORMANCE WITH FM 1-49 GENERAL CONFORMANCE WITH FM 1-49 CONFORMANCE WITH FM 1-49 CONFORMANCE WITH FM 1-49 WITH FM 1-49 WITH FM 1-49 FM 1-49 FM 1-49 1-49 1-49 AND SECURED TO RESIST A MINIMUM OF 300 PSF. 14.PRIME AND PAINT ALL GAS LINES YELLOW.PRIME AND PAINT ALL GAS LINES YELLOW.