Transcript
Page 1: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

-1-

MADHYA PRADESH MADHYA KSHETRA

VIDYUT VITARAN COMPANY LTD.

BHOPAL

ANNUAL REGULATORY COMPLIANCE REPORT

FOR

THE PERIOD APRIL‟10 TO MARCH‟11

By- Reporter of Compliance (Central Discom)

Page 2: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

2

M. P. MADHYA KSHETRA VIDYUT VITARAN COMP. LTD

(Wholly Owned Government of M. P. Undertaking) Nishtha Parisar, Bijalee Nagar, Govindpura, Bhopal –462023

0755-2678325, 2602036, 35, 33; Fax:2589821 Website:- madhyavitaran.nic.in

No. CMD/MK/MPERC/2534 Bhopal Dated: 29-06-2011 To

The Secretary

M.P. Electricity Regulatory Commission E-5 Arera Colony Metro Plaza (5th Floor) Bittan Market 462016 BHOPAL.

Sub : Draft Annual Regulatory Compliance Report for Year ending March‟11.

*****

In compliance to the Clause 6.1 of the MPERC, Bhopal (Guidelines for Reporting Regulatory Compliance) Regulation, 2005, please find enclosed a draft Annual Compliance Report in respect of MPMKVV Co. Ltd, Bhopal for Year ending March‟11. The report has been prepared in the manner that meets the requirements of the compliance systems and reporting. The draft report will be put up to the Board of Directors for approval in next meeting and thereafter

approved report will be submitted to the Hon‟ble Commission.

The enclosed Annual report covers information about all the details

that were required to be furnished for the period specified as above.

The licensee, having made due enquiry, is not aware of any breach of

any of the obligations of license conditions or regulations.

Reporter of Compliance Chairman & Managing Director MPMKVV Co. Ltd M.P.M.K. V.V. Comp. Ltd BHOPAL BHOPAL

Page 3: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

-3-

INDEX

S. No. REGULATIONS Page No Remarks

1. Regulations covered under report. 4

2. Directions of Regulations fully complied partially

complied and not complied. 5

3. Guidelines for Reporting Regulatory compliance

Regulations 2005. 6

4. MP Electricity Supply Code. 11

5. Establishment of Forum and electricity ombudsman

Regulations. 35

6. Distribution Performance Standards Regulations. 37

7. MP Electricity Distribution Code. 48

8. MIS Regulations. 49

9. Security Deposit Regulation. 53

10. MP Regulation on treatment of other business of

licensee. 54

11. Conditions of Distribution License 56

12. MIS Formats. 64

13. Supply code Formats. 71

14. Formats I to V: Conditions of license. 85

15. Status of providing metering at all incoming and

outgoing feeders of 11 KV and above for energy

accounting

101

Annexure- „A‟

16. Projection of category wise sales 103 Annexure- „B‟

17. Projection of monthly unrestricted and restricted

maximum demand in MW for next five Years. 105

Annexure- „C‟

18. Failure of DTR during the Yearly 2010-11 106 Annexure-„D‟

19. Failure of Power Transformers during Yearly ending

2010-11 109

Annexure-„E‟

20. Reliability Index for DHQs for Yearly Report 2010-11 111 Annexure-„F‟

Page 4: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

4

REGULATIONS COVERED UNDER REPORT

As per provision under MPERC (Guidelines for Reporting

Regulatory Compliance) regulation-2005, following regulations are

covered in this report.

1. MPERC (Guide lines for reporting of Regulatory Compliance)

Regulations-2005.

2. M.P. Electricity Supply Code, 2004.

3. MPERC (Establishment of Forum and Electricity Ombudsman

for Redressal of Grievance of the consumers) Regulation,

2004.

4. MPERC (Distribution performance standards) Regulations,

2004

5. MP Electricity Distribution Code.

6. MPERC (Monitoring of Performance of licensee and

Generating Companies) MIS Regulations, 2004.

7. MPERC (Security Deposit) Regulation, 2004.

8. MPERC ( Treatment of Income of other business of licensee)

Regulation, 2004.

9. The Conditions of Distribution License for Distribution

Licensee (including deemed Licensee), 2004.

Page 5: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

-5-

ISSUES, FULLY COMPLIED /PARTIALLY COMPLIED /

NOT COMPLIED

As desired in clause 6.3 of MPERC (guidelines for reporter of regulatory

compliance) regulations 2005, fragmentation of the issues of regulatory

compliance report in three parts is as under:

(A) Issues Fully Complied

S. No.

REGULATIONS Clause Reference

1 Guidelines for reporting Regulatory compliance Regulations 2005.

5.2, 5.3, 6.1, 6.2, 6.3, 6.4, 6.5, 6.6, 6.7

2 MP Electricity Supply Code. 4.7, 8.8, 8.11, 8.13, 8.14, 8.17, 8.19, 8(A).2, 8(A).3, 8(A).5, 8(A).7, 8(A).12, 8(A).13, 8(A).15, 9.1, 9.3, 10.3, 10.6, 10.14, 10.15

3 Establishment of Forum and electricity ombudsman Regulations.

Chapter-1, 3.3, 5.4

4 Distribution Performance Standards Regulation.

7.1, 7.2, 7.3, 8.1,

5 MP Electricity Distribution Code. 5.3.3

6 MIS Regulations. 3.2, 3.3

7 Security Deposit Regulation. 1.21, 1.22

8 MP Regulation on treatment of other business of licensee.

3(1), 4(1), 4(2)

9 Conditions of Distribution license. 9.1, 9.3, 9.9, 10.2, 11.2, 17, 20.2, 20.5, 21.3, 23.3(a), 24.2

(B) (B) Issues Partially Complied.

1. MP electricity Supply Code. 8.1,8.15, 9.14, 9.15, 9.16, 9.19, 9.31, 10.17, 10.20

2. Distribution performance standards Regulations

5.6, 14.9

(C) (C ) Issues Not Complied

NIL

Page 6: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

6

DRAFT ANNUAL REPORT ON REGULATORY COMPLIANCE,

April 2010 – March‟11

(CENTRAL DISCOM)

MPERC (Guide lines for Reporting of Regulatory

Compliance)

Regulations, 2005

This Annual report for the period from April‟10 to March‟11 covers

status of compliance on 9 issues of „Guidelines for reporting of Regulatory

compliance Regulations-2005‟ Out of these 9 issues, All 9 issues complied in

full. Brief details of status of compliance against each issue are as below.

I. Directions covered in clause 5.2:- To submit a issue wise

status report on all issues requiring implementation of

directives, status of compliance, partial compliance and non

compliance be reported for the prescribed period. Such report

should also contain justified reasons on the issues where the

directions could not be complied, if any.

i. Status of Compliance

Issue wise report is being submitted on all issues

requiring implementation along with their status for

specified period. Justified reasons are also reported

where issues are partial complied or not complied.

ii. CMD‟s observations on status of compliance:-

This directive is being complied in full.

iii. Target date proposed for achieving full

compliance/additional remarks, if any:-

No.

Page 7: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

-7-

II. Direction covered in clause 5.3:- To ensure internal audit by

ROC. To authenticate information submitted through the

chairperson and managing Director with the knowledge of

Board of Directors of the licensee.

i. Status of Compliance:-

ROC on a regular basis auditing the information being

submitted on regulatory compliance and these reports are

being studied and signed by CMD. Reports are being put up

to Board of Directors for obtaining their approval.

ii. CMD‟s observations on status of compliance:-

This directive is being complied in full.

iii. Target date proposed for achieving full compliance/additional

remarks, if any:-

No.

III. Directions covered in clause 6.1:- The licensee shall submit

“Regulatory Compliance Report” to the commission half-

yearly and annually. The report should based on the issues

as per relevant format specified in Annexure A for the

licensee.

i. Status of Compliance:-

Regulatory compliance reports are regularly being submitted

half-yearly and annually. All the issues as specified in

Annexure A are covered in these reports.

ii. CMD‟s observations on status of compliance:-

This directive is being complied in full.

iii. Target date proposed for achieving full compliance/additional

remarks, if any:-

No.

Page 8: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

8

IV. Directions covered under clause 6.2:- The licensee shall be

guided by but not be limited to the items specified in the

Annexure A.

i. Status of Compliance:-

Issues not included in Annexure „A‟, but are relevant for

reporting are also being covered in compliance report. Status

of some issues covered in amendments of different

Regulations and found relevant for reporting are also

covered in reports.

ii. CMD‟s observations on status of compliance:-

This directive is also being complied in full.

iii. Target date proposed for achieving full compliance/additional

remarks, if any:-

No.

V. Directions covered under clause 6.3:- The “Regulatory

Compliance Report” should be fragmented in three parts as

given below.

a. Report on issues fully complied with.

b. Report on issues partially complied with and details reasons for

partial compliances and future course of action to achieve full

compliance.

c. report on issues not complied with and detailed reasons and

future course of action to achieve compliance

i. Status of Compliance:-

Status of each issue has been mentioned in the report and in

addition, a summary of issues fully complied, partially complied and

not complied is also prepared and attached with the report.

ii. CMD‟s observations on status of compliance:-

This directive is being fully complied.

iii. Target date proposed for achieving full compliance/additional

remarks, if any:-

No.

Page 9: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

-9-

VI. Directions covered under clause 6.4:- Regulatory Compliance

report shall be signed by the Report of Compliance and also

by the chairperson and Managing Director of the licensee.

i. Status of Compliance:-

Regulatory compliance report submitted to MPERC is being

signed by Reporter of compliance and Chairperson and

Managing Director of the licensee.

ii. CMD‟s observations on status of compliance:-

This directive is fully complied.

iii. Target date proposed for achieving full compliance/additional

remarks, if any:-

No.

VII. Directions covered under clause 6.5:- Board of Directors of

the licensee shall approve the “Regulatory Compliance

Report” before its submission to the commission.

i. Status of compliance:-

Regulatory compliance Report is being put up to Board of

Directors and approval is obtained for every report. Some

time when it is likely to be delayed from the due date of

submission, a draft report is submitted to commission with

the signatures of Reporter of Compliance and CMD and

subsequently approval from BOD is conveyed.

ii. CMD‟s observations on status of compliance:-

This directive is fully complied.

iii. Target date proposed for achieving full compliance/additional

remarks, if any:-

No.

Page 10: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

10

VIII. Directions covered under clause 6.6:- A certificate shall be

attached with the Regulatory Compliance report as is given

at Annexure „B‟.

i. Status of compliance:-

Certificate in accordance to the provision in regulation is

being attached with every Regulatory compliance Report.

ii. CMD‟s observations on status of compliance:-

This directive is fully complied.

iii. Target date proposed for achieving full compliance/additional

remarks, if any:-

No.

IX. Direction covered under clause 6.7:- Half yearly Compliance

Report already submitted and consolidated yearly

Compliance report for the financial year 2010-11 is as

under.

i. Status of Compliance:-

Periodicity of report as per provision in Regulation is being

maintained.

ii. CMD‟s observations on status of compliance:-

This directive is being complied fully.

iii. Target date proposed for achieving full

compliance/additional remarks, if any:-

No.

*********

Page 11: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

-11-

M.P. ELECTRICITY SUPPLY CODE – 2004

Introduction: - This Annual report for the period from April' 10 to March‟11

covers status of compliance on 29 identified issues of supply code. Out of

these 29 issues, 20 issues complied in full, while 9 issues have been partially

complied. Brief details of status of compliance against each issue along with

the reasons for partial are as below.

I. Directions given in Clause 4.7 “To prepare ready reckoner for

per unit material cost”.

i) Status of compliance:- Ready Reckoner for HT, LT and sub-

stations etc has been prepared and circulated to field offices for

uniformity and simplification in calculating the actual cost of extension

vide No CMD/MK/Works/147 dt.07/05/10.

ii. CMD's observation on status of compliance:- Per unit cost

schedule is prepared and circulated to all field offices. The direction is

complied in full.

iii Target date proposed for achieving full compliance/ additional remarks, if any: –

II. Directions given in Clause 8.1 "No new connection to be

released without meter".

i. Status of compliance:- During the period under report i.e. from

April' 2010 to March‟11 a total of 368284 new permanent connections are

released. Out of this, 343994 connections are regularized and brought into

billing circuit as they were found using electricity without availing any legal

connection. A special facility for BPL and general domestic connection was

implemented during the year 2010-11. Connections are regularized by giving

facility of installments, due to this such huge no. of connections are

regularized as tabulated below :-

S.No BPL/SLP Gen. Rural Others FM Total

1 204681 87019 51854 440 343994

Page 12: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

12

Meters are being installed on these connections, after completion of

formalities. The direction is partially complied.

ii CMD's observation on status of compliance:- Meters will be

provided on these regularized connections.

III. Directions given in Clause 8.8 "All new meters should be

installed in a tamper-proof meter box. The licensee shall

prepare and implement a phased plan to install tamper-proof

metering boxes for all the meters, which are at present

installed without meter boxes".

i. Status of compliance:- All the new meters are being installed in

tamper-proof meter boxes only. The meters are procured with tamper-

proof boxes. Plan to install temper proof meter boxes has been

prepared for the meters, which are at present installed without meter

boxes and boxes are being provided to these meters. The direction is

partially complied.

ii CMD's observation on status of compliance:-

Meter boxes are being installed on meters which are at presently

installed without boxes.

IV. Directions given in clause 8.11 "Sealing of meter to be ensured

by licensee".

i. Status of compliance:- Sealing of all the meters installed for new

connections including replacement against stopped and defective

meters is being done at the time of installation of meters itself. The

work of sealing of meters already installed is also in progress where

seals are broken due to different reasons. Discom is presently

procuring meters fitted in push fit type meter boxes. Once this meter is

installed and box cover is fitted on pushing the cover, the meter is

sealed automatically and there is no need to provide seal on terminal.

These boxes are transparent and each connection is clearly visible all

the times.

Page 13: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

-13-

ii. CMD's observation on status of compliance:-

This directive is fully complied.

iii. Target date proposed for achieving full compliance/ additional

remarks, if any-

No

V. Directions given in Clause 8.13 "The licensee shall submit a list

of all the types of meters installed in its area of operation, to

the Commission annually. The information shall include the

specification of each type of meter and the total number of

units of each type in use and in stock with the licensee".

i. Status of compliance:-

Details of different types of meters installed have been submitted to

the Hon'ble Commission year ending March‟11 in prescribed format

ESC-7 (attached).

ii. CMD's observation on status of compliance:-

The directive is fully complied.

iii. Target date proposed for achieving full compliance/

additional remarks, if any:-

No.

Page 14: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

14

VI. Directions given in clause 8.14 "It shall be the responsibility of

the licensee to satisfy himself regarding the accuracy of the

meter before it is installed and may test them for this

purpose".

i. Status of compliance:-

Accuracy of the meters before they are installed is ascertained by

following measures:-

(a) The following condition is incorporated in each supply order

placed for meters. “The manufacturer is bound to conduct

routine test as well as functional test on each and every meter

of the offered lot as per IS: 13779/1999”. The test reports of

all meters are checked and obtained from manufacture by

inspecting officer prior to carrying out acceptance test.

(b) The acceptance test of offered lot is carried out at firm's works

as per the latest version of IS.

(c) Random sample testing of meters received is being done for all

the tests as per IS at M/s CPRI Bhopal and in case, material fails

in testing, complete lot is rejected.

The Discom has also placed orders for procurement of 5 No.s

semiautomatic and 2 Nos. fully automatic Test Benches for testing of

electronic Meters. Out of above two Nos. fully automatic and one

semiautomatic tested benches have been received and one (FA) at

Gwalior and one (SA) at Bhopal has been commission recently.

The complaints of meters have now reduced and only 9312

(0.49%) consumers contested the meters & out of only 3342 (0.177%)

meters found beyond permissible limits of accuracy during the period

under report as against 18.87 Lacs installed. Status during the period

under this report remained as under:

Page 15: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

-15-

Region No. of

Metered Consumers

No. Consumers

who applied for

testing their

meters

No of meters found within

permissible limits of accuracy

No. of meters found

beyond permissible

limits of accuracy

Bhopal 1174347 4946 3568 1219

Gwalior 712755 4366 2243 2123

CZ 1887102 9312 5811 3342

This directive is fully complied.

ii. CMD's observation on status of compliance:- Agreed. iii. Target date proposed for achieving full compliance/ additional

remarks, if any-

No

VII. Directions given in clause 8.15 "The licensee shall conduct

periodical inspection/testing of the meters as per the

following schedule: (a) Single phase meters: at least once

every five years (b) LT 3 phase meters: at least once every 3

years (c) HT meters including MDI: at least once a year.

Wherever practicable, CT and PT shall also be tested along-

with meters".

i. Status of compliance:-

All the HT meters are tested for their accuracy every year, LT CT

meters are also tested once in every 3 years. Achievement during

period under report has remained as under:

Page 16: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

16

Type of

meters

Installed as on

01.04.10

Due for

testing Tested

Nos. % age

HT Meters 1171 1171 1171 100

Three Phase

Meters 242342 80781 73204 90.6

Single Phase

Meters 1484213 296843 251398 84.7

HT meters are tested as per provision in the code. The progress of

single phase and three phase LT meter is however is not matching with

the provision of code. This matter is being given serious attention by

senior management of the company. To enhance the testing capacity

142 Nos Accucheck Meters (RSM) has been procured for testing of

single phase and three phase meters at site. In addition to above

purchase orders for five semiautomatic and two fully automatic Test

benches for testing of electronic machines have been placed. Three

benches have been received and out of these two benches have been

commissioned recently.

This directive is partially complied.

ii. CMD's observation on status of compliance:-

The progress of periodical testing of meters will now be accelerated as

additional accucheck meters have been made available to field staff.

iii. Target date proposed for achieving full compliance/ additional

remarks, if any:-

Better compliance of this directive is expected in next report.

Page 17: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

-17-

VIII. Directions given in Clause 8.17 "licensee shall test the meter

within 30 days of the receipt of the application from consumer"

i. Status of compliance:-

During the period under report total 9312 consumers applied for

testing of their meters. 9153 meters were tested within 30 days and

balance 159 meters could not be tested in 30 days time limit, because

of consumer's absence on pre-decided date of testing, premises found

locked. Out of these 5811 meters found within permissible limits and

3342 found beyond permissible limits. This directive is fully complied.

ii. CMD's observation on status of compliance:-

The directive is being complied in full.

iii. Target date proposed for achieving full compliance/ additional

remarks, if any-

No.

IX. Directions given in Clause 8.19 "The licensee shall endeavor to

identify and develop independent meter testing facilities at

Region

No. Of

consumers who applied

for testing

their meters

No. of

consumers whose

meters

tested within 30

days applications

No. of

consumers whose

meters

could not be tested

within 30 days of

application

No. of

meters found

within

permissible limits of

accuracy against

col.4

No. of

meters found

beyond

permissible limits of

accuracy against

col.4

1

2 3 4 5 6

Bhopal 4946 4787 159 3568 1219

Gwalior 4366 4366 0 2243 2123

TOTAL 9312 9153 159 5811 3342

Page 18: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

18

convenient locations in one year from the date of notification

of this Code".

i. Status of compliance:-

Hon'ble Commission has approved M/s CPRI, Bhopal for conducting

independent meter testing vide order dated 13th March 2005 and

accordingly company is extending facility of independent meter testing

to consumers. This directive is fully complied.

ii. CMD's observation on status of compliance:-

Publicity of this facility has also been made among consumers.

iii. Target date proposed for achieving full compliance/ additional

remarks, if any-

No.

X. Clause no. 8 (A).2: The meter to be installed in the Consumers

premises shall be of appropriate capacity and shall confirm to

the relevant ISI specifications.

i. States of compliance:-

Meters of appropriate capacity are being installed in the consumers

premises commensurate with the contract demand. Meters are being

procured as per the specification laid down, by the Central Electricity

Authority under “installation and operation of meters regulation”.

ii. CMD‟s observation on status of compliance:-

This directive is fully complied.

iii. Target proposed for achieving full compliance/ additional

remarks, if any:-

No

XI. Clause no. 8 (A).3:-Licensee shall offer a choice of meters for

domestic connection to the consumers. The Licensee shall

Page 19: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

-19-

submit the list of meter manufacturing along-with the price of

various types of meters.

i. Status of Compliance:-

Orders to purchase meters are placed to the firm who quotes lowest

rates and therefore meters of one make are procured at a time.

Therefore due to operational constraints, choice of meters is being

provided to consumers from available stock.

Hon‟ble commission has considered the difficulty of DISCOM in case of

choice of meters and has directed to amend the regulation suitably

(Letter No. MPERC/D(RE)/2007/2256dt.01.11.07).

Panel of suitable makes of meter manufactures along-with the details

regarding the accuracy class, capacity of meters has been prepared

and is as under:-

i) M/s Elymer International Pvt. Ltd., 37, Bungalow Rd. 1st Floor

Delhi.

ii) M/s Elymer Electrics Pvt. Ltd., 37 Bungalow Rd. 1st floor Delhi.

iii) M/s Secure meters Ltd., P.O. Box. No. 30, Pratap Nagar

Industrial Area, Udaipur (Rajasthan)

iv) M/s Omni Agate Systems Pvt. Ltd., II Floor, Murugesa Naicker

Complex, 39 Greens Rd. Chennai.

v) M/s HPL, SOCOMEC Pvt. Ltd., Atmaram Mansion 1/21, Asaf Ali

Road New Delhi.

vi) M/s Genus Power Infrastructures, Jaipur.

vii) M/s L&T Ltd., L&T House, Bellard Estate, Mumbai.

viii) M/s Wallaby Metering systems P.Ltd, Chennai.

ix) M/s EM Co Ltd. Industrial Estate Thane-400.600

Page 20: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

20

Basic Technical Specification & prices.

a. Single Phase Energy Meters -

i) Capacity 5 A, Ib. 30 A, I max ii) Voltage 240 V.A.C. iii) Type of display LCD Display type iv) Class of accuracy 1

v) Parameter on display Date & time KWh & KW & PF / Phase voltage/Current vi) Communication Mod RS 232 GSM Compatible

a. Price – a) Rs. 943.73 per meter (FOR

(with communication port) destination inclusive of freight all taxes & duties against order No. 1009 Dated 25-08-2010)

b) Rs. 910.00 per meter (FOR destination inclusive of freight all taxes & duties against order No. 1073 Dated 28-03-2011)

b. Three phase energy meters.

i) Capacity Ib - 10 Amp Imax – 40 Amp or 60 Amp ii) Voltage 3 x 240 V. a.c. iii) Type of display LCD iv) Class of Accuracy 1 v) Parameters on display Date & time Kwh, KW & PF. Phase Voltage/Current vi) Communication mode RS. 232 GSM Compatible

vii) Price

a) Communicative type with Rs. 232/- Optical port & DLMS Protocol

b) Rs. 2816.83 (F.O.R. destination with freight

taxes & duties)

Page 21: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

-21-

iv. CMD‟s observations on status of compliance:-

The directive is being complied.

v. Target date for achieving full compliance/ additional remarks, if any. No

XII Clause 8 (A).5:- The Licensees shall submit a copy of order

issued for procurement of meters to the Commission along-

with dispatch instructions.

i. Status of Compliance:-

Copies of the purchase orders placed for procurement of single

phase/three phase meters are being sent regularly to Hon‟ble

Commission along with dispatch instructions.

ii. CMD‟s observations on status of compliance:-

The directive of the regulation is being complied in full.

iii. Target date for achieving full compliance/ additional remarks,

if any.

No

XIII. Clause no. 8 (A).7:- the Licensee shall invariably ensure that

sample random testing of meters is carried out as per the

standard sampling procedure of ISS against each lot of

supplies of meters received.

i. Status of compliance:-

The acceptance test at CPRI Bhopal, as per the recommendation of ISI

13779/1999 is being performed on receipt of every lot of energy

meters.

ii. CMD‟s observation on status of compliance:-

The direction is being complied in full.

Page 22: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

22

iii. Target date for achieving full compliance/ additional remark,

if any.

No

XIV. Clause no. 8 (A).12:- Licensee shall submit annual information

about the quantity of meters procured during the year

indicating the type of meter procured, names of

manufacturers and the price of meters.

i. Status of compliance:-

During the period under report details of energy meter purchased are

as under:-

Sl.

no Name of Firm Purchase

order No.

& Date

Type of meter

Qty. procure

d.

1 M/s HPL Socomec pvt Ltd, Delhi

Order No.1009

dt.25.08.10

Single-phase 2 wire 5-30 Amp electronic energy meters.

35,000

Nos.

2. M/s Genus Power Infrastructure Ltd, Jaipur.

Order No 1058

Dt 04-12-10

Three phase 4 wise 10-40 Amp electronic meters .

21,000 Nos.

3. M/s Secure Meters Ltd.

Udaipur.

Order No. 1066 Dt

21-01-2011

Three phase 4 wise 10-40 Amp electronic meters.

14000

Nos.

4. M/s Genus Power Infrastructure

Ltd, Jaipur.

Order No 1067

Dt 31-01-11 Three phase 4 wire/5 Amp LTCT operated meters.

7596

5. M/s Secure Meters Ltd.

Udaipur.

Order No 1068

Dt 31-01-11

Three phase 4 wire/5 Amp LTCT operated meters

1500

6. M/s Genus Power Infrastructure

Ltd, Jaipur.

Order No 1073

Dt 28-03-11 Single phase 2 wire 240 Volt 5-30 Amp meters

1,25,000

Page 23: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

-23-

ii. CMD‟s observation on status of compliance:-

The directive is being complied in full.

iii. Target date for achieving full compliance/ additional remarks,

if any.

No.

XV. Clause No.8 (A).13:- The distribution licensee shall offer a choice

of meters to the domestic consumers at the time of new

connections.

i. Status of Compliance:-

Orders to purchase meters are placed to the firm who quotes lowest

rates and therefore meters of one make are procured at a time.

Therefore due to operational constraints, choice of meters is being

provided to consumers from available stock.

Hon‟ble commission has considered the difficulty of DISCOM in case of

choice of meters and has directed to amend the regulation suitably

(Letter No. MPERC/D(RE)/2007/2256dt.01.11.07).

ii. CMD‟s observation of status of compliance:-

The direction is being complied.

iii. Target date for achieving full compliance/additional remark, if

any.

No

XVI. Clause No. 8(A).15:- Choice of meters be provided to existing

domestic consumers and distribution licensee may recover the

cost involved in the effort of replacement of the meter.

i. Status of Compliance: -

Orders to purchase meters are placed to the firm who quotes lowest

rates and therefore meters of one make are procured at a time.

Page 24: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

24

Therefore due to operational constraints, choice of meters is being

provided to consumers from available stock.

Hon‟ble commission has considered the difficulty of DISCOM in case of

choice of meters and has directed to amend the regulation suitably

(Letter No. MPERC/D(RE)/2007/2256dt.01.11.07).

ii. CMD‟s observation on Status of Compliance The direction is being compiled.

iii. Target date for achieving full compliance/additional remark, if any.

No

XVII. Direction given in Clause 9.1- "Implementation of meter

reading schedule prescribed for various categories of

consumer".

i. Status of compliance:-

Meter readings are being taken as per schedule prescribed for various

categories of consumers under clause 9.1 of supply code 2004.

ii. CMD's observation on status of compliance:-

The directive is being complied in full.

iii. Target date proposed for achieving full compliance/ additional

remarks, if any:-

No.

XVIII. Directions given in Clause 9.3 "licensee to display the meter

reading and payment of high value consumers on the

Internet".

Page 25: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

-25-

i. Status of compliance:-

Status of high value consumers is being displayed on Company‟s

Website on six monthly basis. The status of March‟11 has been loaded

on Company‟s website.

ii. CMD's observation on status of compliance:-

The directive is being complied in full.

iii. Target date proposed for achieving full compliance /additional

remarks, if any-

No.

XIX. Direction given in Clause 9.14 & 9.15 " If for any reason,

meter is not accessible for reading, the licensee shall send a

notice in writing to the consumer to keep the meter available

for reading at the time and date given in the notice. If after

the notice being given as described, the consumer still does

not give access to the meter for reading, the licensee shall be

free to send a provisional bill together with a surcharge. If the

meter remains inaccessible even for the next reading cycle,

the consumer will be served with a notice, to open his

premises for reading of the meter at a fixed time and date. If

the meter is not accessible at the time fixed in the notice, the

supply will be liable to be disconnected after serving a 24 hour

notice under section 163 (3) of the Electricity Act, 2003 (36 of

2003).

i. Status of compliance:-

The procedure is being followed in urban areas. This directive is

partially complied. Status is being reported to Hon‟ble Commission in

format ESC 11. This matter has been discussed at senior level

management of the company and action has been taken to ensure full

compliance.

Page 26: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

26

ii. CMD‟s observation on status of compliance for compliance:-

Field Officers have been advised to ensure compliance of this provision.

The company is planning to adopt AMR system for meter reading in

phased manner which will automatically avoid the possibility of non

recording of meter readings.

iii. Target date proposed for achieving full compliance/ additional

remarks, if any:-

No.

XX. Direction given in Clause No. 9.16 "Meter reader shall note

down the details of every stopped/defective meter and to file

a report at the end of each working day in prescribed

Performa to the officer in charge of the distribution center in

case of LT consumers and officer in charge of the circle office

in case of HT consumers, who shall be responsible to taken

immediate steps to replace or repair the stopped/defective

meter. In addition to the entry made in the meter-reading

book a separate report shall be required to be given by the

officer in charge of the distribution center to the officer in

charge of the sub-division and division offices, in respect of all

stopped meters and the action taken to replace them."

i. Status of compliance:-

The procedure is being followed for HT consumers and other high

value consumers. Remarks are also recorded for stopped/ defective/

burnt meters on reading diaries by meter readers. However in rural

areas, line staff posted for maintenance work is taking meter readings

and most of them are not capable to prepare reports as per direction

of this clause. Reports are prepared on monthly basis at Distribution

Centers by reviewing meter reading diaries and based on these reports

action to replace stopped / defective meters is taken. Hon‟ble

Commission has also considered this problem and directed that meter

Page 27: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

-27-

readings books be duly checked at DC level by concerned staff.

(Conveyed vide No. MPERC/D (RE)/2007/2256 dt.01.11.07). This

directive is being complied partially.

Status of defective meters at the end of March‟11 is as below:

ii. CMD's observation on status of compliance:-

Agree.

iii. Target date proposed for achieving full compliance/

additional remarks, if any No.

XXI. Clause No. 9.19 " The meter reader shall furnish a list of

connections where the meter reading could not be recorded or

the meter has not recorded any consumption of electricity, to

the officer in charge (OIC) of the Distribution Center. The OIC

shall prepare a list of such consumers where meter reading

could not be taken or the defective meter could not be

replaced (refer clause 8.21) within thirty days and report the

same to the Assistant Engineer and Executive Engineer. The

licensee shall develop and have in place a detailed document

Region Area Existing Metered

Stopped/Defective Meters

%age of stopped/Defective

Meters

Bhopal Urban 681194 19945 2.93

Rural 493153 24419 4.95

Total 11,74,347 44364 3.77

Gwalior Urban 4,55,796 24301 5.33

Rural 2,56,959 9580 3.72

Total 7,12,755 33881 4.77

Discom Urban 1136990 44246 3.89

Rural 712755 33999 4.53

Total 1887102 78245 4.14

Page 28: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

28

describing systems, procedure and accountability regarding

replacement of defective meters."

i. Status of compliance:-

The OIC is preparing list of such consumers where the meter readings

could not be recorded or the meter has not recorded any consumption

of electricity while reviewing the meter reading diaries on monthly

basis and appropriate action is taken by him. Detailed document

describing system, procedure and accountability regarding replacement

of defective meters has been prepared and submitted to Hon'ble

Commission. Directive is partially complied.

ii. CMD's observation on status of compliance:-

The DISCOM has issued directions to keep stock of meters at Division

level on rotating imprest basis to reduce the time for replacement.

Stock of different type of meters have been allotted to field divisions

on imprest basis vide No. CMD/MK/Com/16391 dt. 27.11.07.

iii. Target date proposed for achieving full compliance/ additional

remarks, if any:–

No

XXII. Clause No. 9.31“The Licensee shall setup call center or centers

to provide guidance and information to any consumers on

telephone. All Urban area may be brought under this facility in

the first phase and Rural areas may be included thereafter.

The details of payment status, Arrear status, authority load,

contract demand etc. maybe provided to be consumers if he

discloses his connection no and address.”

i. Status of compliance:-

A call center has been established at Bhopal which is working round

the clock on all week days. Complaints are registered at this call center

Page 29: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

-29-

and payment of energy bill through Account Payee cheques are

accepted. The area of H‟bad, Vidisha, Bhopal and Mandideep Towns is

connected to this call center. This directive is partially complied.

ii. CMD's observation on status of compliance:-

The Company has decided to extend the area of this call center to

other Towns of the Discom. A centralized call center will be established

as provided in R-APDRP Scheme.

XXIII. Clause No 10.2 “Adequate publicity of the address/ locations

and working hours of the collection centers including those

of banks where consumers can make payment to provide a

choice of maximum alternatives modes of payment be made

by the Discom”.

i. Status of compliance:-

Publicity regarding collection centers their locations and working hours

has been made in their area of jurisdiction. Details of working hours

are also displayed on collection centers. Publicity regarding different

mode of payment has been done through local newspapers, Pamphlets

and arranging media workshops at district Head Quarters. This

directive is fully complied.

ii. CMD's observation on status of compliance:-

Agree.

iii. Target date proposed for achieving full compliance/ additional

remarks, if any:-

No.

XXIV. Clause No 10.3 “During the days when there is rush on the

collection windows, separate Queuing arrangement should

be made for senior citizens, women and physically challenged

persons and they should be attended on priority.”

Page 30: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

30

i. Status of compliance:-

Separate queuing arrangement at collection windows for senior citizens

women and physical challenged persons are being ensured on rush

days. This directive is complied in full.

ii. CMD's observation on status of compliance:-

I agree.

iii. Target date proposed for achieving full compliance/ additional remarks, if any:-

No

XXV. Clause No 10.6 “The Licensee should make arrangement to

received payment through drop boxes where the consumers

may drop his cheque (Crossed Account Payee) to facilitate the

payment without the need of standing in the Queue.

i. Status of compliance:-

Drop Boxes have been provided at Zonal offices of City divisions for

receiving payment through crossed Account Payee cheques from

consumers. This directive is complied in full.

ii. CMD's observation on status of compliance:-

I agree.

iii. Target date proposed for achieving full compliance/ additional

remarks, if any:-

No

XXVI. Clause No. 10.14 "Licensee will lay down a policy for grant of

installment facility for the purpose of recovery of dues

subject to approval of the commission. The said policy shall

also designate the officer(s) authorized to grant installment

facility."

Page 31: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

-31-

i. Status of compliance:-

Policy for grant of installment facility for the purpose of recovery of

arrears/ bills already exists and a copy has been submitted to Hon'ble

Commission.

ii. CMD's observation on status of compliance:-

The directive is fully complied.

iii. Target date proposed for achieving full compliance/ additional

remarks, if any:-

No.

XXVII. Clause No. 10.15: "Disputed/Erroneous Bills: To resolve the

dispute within a maximum period of seven days from the date

of receipt of written complaint and OIC of center shall send a

report to the officer in charge of the division giving reasons for

the discrepancy. If on investigation, the Licensee finds the bill

to be erroneous, a revised bill shall be issued with due date

not less than seven days from the date of delivery of revised

bill. Excess amount paid by the consumer, if any, shall be

adjusted in the subsequent bill(s). In case it is established

that the meter reading recorded was incorrect, responsibility

may be fixed and the licensee may take suitable action.

Licensee shall provide quarterly feedback to the Commission

on the analysis of disputed/erroneous bills."

i. Status of compliance:-

Complaints regarding disputed/erroneous bills are being received at

distribution centers. The in-charge of the distribution center, after due

scrutiny, corrects the bill same day, if verification of records and

checking of installation is not required. In other cases bills are

corrected within seven days after checking of meter and records. The

directive is fully complied.

Page 32: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

32

The status for the period under report has remained as under:

Region No. of complaints

received during

the year

No of

complaints

resolved

No of complaints

resolved within 7

days.

Bhopal 39821 39821 39821

Gwalior 31039 31039 31039

Total 70860 70860 70860

ii. CMD's observation on status of compliance:-

The field SE‟s/EE‟s have been advised to obtain regular reports from

field regarding status of disputed bills and their rectification at level

one i.e. JE/AE.

iii. Target date proposed for achieving full compliance/ additional remarks, if any:-

No

XXVIII. Clause No. 10.17 "To ensure that no default in payment is

continued beyond a reasonable period subject to a maximum

of three months without action for temporary disconnection.

To ensure that all such cases are monitored regularly and

timely action is initiated. A report of cases of permanent

disconnection will be submitted to the Commission on

quarterly basis.

i. Status of compliance:-

The temporary disconnection of defaulting consumers is being done at

distribution center level. The priority is given for disconnection of

defaulter consumers having more arrears irrespective of the period of

arrears. Government connections and connections of public utility are

also not disconnected as their payments are received subsequently. All

Page 33: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

-33-

the defaulter consumers where default is continued for 3 months not

disconnected looking to public inconvenience.

Status during the period under report has remained as under:

CONNECTED CONSUMERS HAVING ARREARS FOR MORE THAN 3 MONTHS

Region

No.of connected

consumers who

are in arrears of

more than three

months

Amount of

arrears against

connected

consumers col.

No.-2

No.of

connections

disconnected

Amount of

arrears

against Col.

4 (Rs. in

Lakhs)

1 2 3 4 5

Bhopal 231321 16726.19 137014 7621.98

Gwalior 136408 54739.82 116017 16862.43

Total 367729 71466.01 253031 24484.41

Out of total 367729 consumers who were in arrears of more than three

months worth Rs. 71466.01 lacs, 253031 consumers disconnected for

arrears worth Rs. 24484.41 lacs. This directive is partially complied.

ii. CMD's observation on status of compliance:-

The CE‟s and SE‟s have been asked to ensure disconnections of

defaulter consumers to the maximum extent possible.

iii. Target date proposed for achieving full compliance/ additional remarks, if any:-

Full compliance could be observed only after sufficient manpower is

managed when company‟s financial health is improved

XXIX. Direction given in Clause No. 10.20 "The licensee would publish the details of such consumers, who are liable to be disconnected but have not been disconnected, in such a

manner as may be directed by the Commission."

Page 34: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

34

i. Status of compliance:-

List of consumers is prepared manually for high value consumers and

is being published on Company‟s website half yearly. Status at the end

of March‟10 has been uploaded on company‟s website. This directive is

partially complied.

ii. CMD's observation on status of compliance:-

Instruction to Field Officers has been issued to prepare this list

manually for publication.

iii. Target date proposed for achieving full compliance/ additional

remarks, if any:-

Discom has decided to implement ERP and R-APDRP part-A solutions in

whole company area in a phased manner and thereafter completed list

will be generated by computer.

*********

Page 35: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

-35-

Establishment of Forum and Electricity

Ombudsman Regulations

This Annual report covers status of compliance of the directives on

three identified issues pertaining to MPERC regulation of “Establishment of

Forum and Electricity Ombudsman for Redressal of grievances of the

consumers” (Published in Official Gazette on dated 30.04.2004). All the three

issues have been complied in full.

I. Chapter 1: "Concerned officers of the Licensee shall personally hear

the consumer complaints every Tuesday, which shall be earmarked as

the "Complaint Redressal Day".

i. Status of compliance:-

Field officers are complying this directive. At some places, weekly

market days are earmarked as “Complaint Redressal Day” because it is

convenient to most of the villagers who comes from remote Rural area to

purchase their needs.

ii. CMD's observation on status of compliance:-

The directive is complied.

iii. Target date proposed for achieving full compliance/ additional

remarks, If any:-

- No

II. Clause No. 3.3- "Forum to decide every complaint, preferably

within 30 days and in any case not exceeding 45 days from the

date of receipt of complaint by it".

i. Status of compliance:-

As per report received from the ECGRF, Bhopal 18 complaints are

pending at the end of March‟11.

Page 36: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

36

Status at the end of March‟11 remained as under:

S. No.

Period Opening balance as

on 01-04-2010

pending

cases

No. of Cases

Received

No of cases

decided

No. of Cases Pending Pending

Cases 30

Days

1-3

Months

3-6

Month

s

Above 6

Month

1 April‟ 10

to

March‟11 18 366 349 17 18 0 0 35

Some decisions could not be taken in time limits due to

following reasons:-

A. Sitting of forum at Places other than Bhopal is held at fixed intervals.

B. Consumers many times do not come prepared and request for

extending dates.

C. Reply from Licensee is delayed in case where old record is required

to be referred/ consulted.

D. Absence of Applicant/ Non-applicants on hearing dates.

ii. CMD's observation on status of compliance:-

Consumer‟s complaints at ECGRF are being decided promptly.

iii. Target date proposed for achieving full compliance/ additional remarks, if any:-

- No.

III. Clause No. 5.4- "Monthly report to be submitted by the Forum".

i. Status of compliance:-

Monthly reports are being submitted by the forum to licensee,

Ombudsman and Hon'ble Commission.

ii. CMD's observation on status of compliance:-

The directive is fully complied by the forum.

*****

Page 37: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

-37-

DISTRIBUTION PERFORMANCE STANDARDS

This Annual report for the period from April 2010 to March‟11 covers

status of compliance on four identified issues of MPERC Distribution

Performance standards regulation No. 1902 dated 13th July, 2004, published

in official gazette on dated 16th July, 2004. Out of above two issues are

complied in full, two partially complied.

I. Direction given in clause 5.6:- The licensee shall provide a toll

free telephone connection at Central fuse off call centre of the

licensee‟s Head Quarter to receive consumer complaints from

the consumers situated in any area of the company.

i. Status of compliance:-

Call centre at Company‟s Head Quarter has been established

which covers Bhopal, H‟bad, Vidisha and Mandideep, Sehore

Towns. Telephone 12660 is installed in this call center but this

no is presently not toll free.

ii CMD's observation of status of compliance

The call center presently does not cover whole area of Discom.

The company has planned to extend this area to complete area

of Discom and a toll free telephone will be installed for lodging

complaints by consumers.

II. Directions given in clause 3.1,3.2,3.3 Distribution Performance

standards – quarterly reports on guaranteed and overall

standards of performance.

Page 38: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

38

1. Status of Compliance:-

Quarterly reports have been submitted as below :-

Quarter

ending

Due Date of

Submission

Date of Submission

Bhopal Region Gwalior Region

June‟10 31.07.2010 06.08.2010 12.07.2010

September‟10 31.10.2010 09.11.2010 19.10.2010

Dec‟10 31.01.2011 04.02.2011 20.01.2011

March‟11 30.04.2011 03.05.2011 18.04.2011

This directive is fully compiled

2. CMD's observation of status of compliance:-

The prescribed information as provided in regulation submitted to

commission.

3. Target date proposed for achieving full compliance/

additional remarks, if any-

No

III. Direction given in clause 8.1:- The distribution licensee shall

provide the monthly information on Reliability Index in

respect of all 11 KV feeders in each commissionary Head

Quarter, District Head Quarter and Industrial growth centre.

i. Status of compliance:-

Monthly information on reliability Index for all 11 KV feeders as

provided in Regulation has been submitted for the period under

report. The directive is fully complied

ii. CMD's observation of status of compliance

Agreed

iii. Target date proposed for achieving full compliance/

Additional remarks, if any-

Page 39: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

-39-

No

IV. Direction given in clause 14.9 The distribution licensee shall

provide energy accounting and audit meters at all incoming

and outgoing feeders with 11 KV and above capacity so as to

facilitate to account for the energy input and consumed in the

various segments of sub-transmission system and the energy

loss.

i. Status of compliance:-

Status of 33 KV and 11 KV metering point under Discom, meters

provided and stopped/defective meters is attached as

Annexure A. Meters are provided at 1122 metering points out

of 1208 of 33 KV. At 2246 metering points out of 2737 meters

are provided on 11 KV. Work of providing metering at balance

point is in progress.

This directive is partially complied.

ii. CMD's observation of status of compliance

Agreed

iii. Target date proposed for achieving full compliance/

additional remarks, if any-

No.

*****

Page 40: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

40

The salient activities covered under regulations are described as under.

(a) Normal Fuse off Calls

Permitted deviation: Urban - 5 % , Rural - 5 %

Particulars 2010-2011 (Y)

Bhopal Gwalior Total

Instances occurred Urban 162380 159264 321644

Rural 54933 45313 100246

Achievement with in prescribed limits

Urban 162375 153506 315881

Rural 54929 44990 99919

Achievement not within prescribed

limits

Urban 5 758 763

Rural 4 323 327

Percentage deviation Urban 0.003 0.48 0.48

Rural 0.007 0.71 0.71

The percentage deviation is well within permitted limits.

(b) Line Breakdowns

Permitted deviation: Urban-5%, Rural- 5%

Particulars 2010-2011 (Y)

Bhopal Gwalior Total

Instances occurred

Urban 162380 159264 321644

Rural 54933 45313 100246

Achievement with in

prescribed limits

Urban 162375 153506 315881

Rural 54929 44990 99919

Achievement not within

prescribed limits

Urban 0 15 15

Rural 0 21 21

Percentage deviation

Urban 0 0.38 0.38

Rural 0 0.39 0.39

The percentage deviation is well within permitted limits.

Page 41: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

-41-

(c ) Replacement of failed Distribution Transformers

Permitted deviation : Urban -5 %, Rural - 5 %

(d) Meter Complaints Permitted deviation: Urban-0.5 %, Rural-2.0 %

Particulars 2010-2011 (Y)

Bhopal Gwalior Total

Instances occurred

Urban 26702 17667 44369

Rural 4321 1682 6003

Achievement with in

prescribed limits

Urban 26702 17638 44340

Rural 4321 1664 5985

Achievement not within prescribed

limits

Urban 0 29 29

Rural 0 18 18

Percentage deviation

Urban 0 0.16 0.16

Rural 0 1.07 1.07

The deviations are well within permissible limits.

Particulars 2010-2011 (Y)

Bhopal Gwalior Total

Instances occurred

Urban 292 1729 2021

Rural 6719 3085 9804

Achievement with in prescribed

limits

Urban 280 1625 1905

Rural 5734 3069 8803

Achievement not within prescribed

limits

Urban 12 13 25

Rural 985 16 1001

Percentage deviation

Urban 4.10 0.75 12.3

Rural 14.65 0.92 13.51

The deviations are well within permitted limits.

Page 42: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

42

(e) New Connections/Additional Loads

Permitted deviation : Urban - Nil Rural- Nil

Particulars 2010-2011 (Y)

Bhopal Gwalior Total

Instances occurred

Urban 23673 22711 46384

Rural 257913 57595 315508

Achievement with in prescribed

limits

Urban 23469 22711 46180

Rural 257626 57595 315221

Achievement not within prescribed

limits

Urban 204 0 204

Rural 287 0 287

Percentage deviation

Urban 0.86 0 0.86

Rural 0.11 0 0.11

The deviations are 0.86 % in urban and 0.11 % in rural areas as against NIL%

permitted.

(f) Transfer of Ownership and Conversion of Service

Permitted deviation: Urban -2.0%, Rural - 2.0%

Particulars 2010-2011 (Y)

Bhopal Gwalior Total

Instances occurred Urban 1294 842 2136

Rural 64 159 223

Achievement with in prescribed limits

Urban 1294 842 2136

Rural 64 159 223

Achievement not within prescribed limits

Urban 0 0 0

Rural 0 0 0

Percentage deviation Urban 0 0 0

Rural 0 0 0

Page 43: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

-43-

(g) Billing Mistakes Permitted deviation: Urban-0.1%, Rural- 0.1%

Particulars

2010-2011 (Y)

Bhopal Gwalior Total

Instances

occurred

Urban 34302 25433 59735

Rural 5557 4217 9774

Achievement with

in prescribed

limits

Urban 34302 25395 59697

Rural 5557 4193 9750

Achievement not

within prescribed

limits

Urban 0 38 38

Rural 0 24 24

Percentage

deviation

Urban 0 0.14 0.14

Rural 0 0.56 0.56

Percentage deviation both in Urban and rural areas are found beyond permissible limits.

Percent deviation for both urban and rural areas found well within permitted limits.

Page 44: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

44

(h) Voltage Variations

Permitted deviation NIL

Particulars 2010-2011 (Y)

Bhopal Gwalior Total

Instances occurred 333 104 437

Achievement with in

prescribed limits 333 104 437

Achievement not within

prescribed limits 0 0 0

Percentage deviation 0 0 0

All the complaints received for voltage variations were attended well within line

limits set in regulation and no deviation noted during the period under report.

(i) Fatal electrical Accidents

Details of fatal electrical accidents to human during the period under report

are as under:

S. No. Name of Circle Accidents

Departmental Outsiders Total

1. Rajgarh 0 6 6

2. Hosangabad 4 9 13

3. Vidisha 0 3 3

4. Betul 1 2 3

5. Sehore 0 8 8

6. Bhopal City 2 7 9

7. Bhopal (O&M) 0 7 7

Bhopal Region 7 42 49

Page 45: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

-45-

8. Gwalior City 1 2 3

9. Gwalior (O&M) 1 11 12

10. Guna 3 12 15

11. Shivpuri 1 7 8

12. Morena 0 11 11

13. Bhind 1 5 6

Gwalior Region 7 48 55

Discom 14 90 104

Total 104 fatal electrical accidents occurred to human during April‟ 10, to

Mar‟11 out of which 14 were of departmental employees and 90 outsiders.

(j) Maintenance of Power and Distribution transformers.

Status has remained as under.

(A) Power Transformers

Regions Total No. Transformers As on 31-03-2011

No of Transformer for which

Quarterly maintenance done

Half yearly maintenance done

Bhopal 709 709 709

Gwalior 547 547 547

Discom 1256 1256 1256

(B) Distribution Transformers

Bhopal 44397 12297 18427

Gwalior 50114 20148 20367

Discom 94511 32445 38794

Page 46: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

46

(k) Failure of Transformers Status of failure of power and Distribution Transformers has remained as under:

(A) Power Transformers

Region Transformer Installed

Transformers failed April‟10 – Mar‟11

Percentage Failure

As on 31-03-2011 April‟10 – Mar‟11

Bhopal 709 8 1.13

Gwalior 547 38 6.94

Discom 1256 46 3.66

(B) Distribution Transformers

Bhopal 44397 7011 15.79

Gwalior 50114 4988 9.95

Discom 94511 11999 12.69

The benchmark for failure for 10-11 has been set as 0% for Power Transformers

and 6.79% for DTRs. The failure for both power transformers and DTRs has

exceeded the benchmark.

(l) Periodical Testing of Meters. Status of Periodical testing of meters remained as under :

Category Region Meters installed as on 01.04.10

Meters due for Testing

Meters tested

% age achievement

HT Bhopal 798 798 798 100

Gwalior 373 373 373 100

Discom CZ 1171 1171 1171 100

Single Phase

Bhopal 914739 182948 163610 89

Gwalior 569474 113895 87788 77

Discom CZ 1484213 296843 251398 85

Three Phase

Bhopal 182424 60808 55438 91

Gwalior 59918 19973 17766 89

Discom CZ 242342 80781 73204 90.6

Page 47: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

-47-

(m) Status of metering for energy audit.

Status of metering for energy audit at the end of March-11 remained

as under:

Region No. of HT feeders Feeders provided

with Meters

Defective Meters

33 KV 11 KV 33 KV 11 KV 33 KV 11 KV

Bhopal 244 1473 244 1390 48 133

Gwalior 163 1107 163 940 20 126

Discom

*Field 407 2580 407 2330 68 259

Metering has been provided on all 33 kV feeders. Out of these 68 metering

metering have become defective and action to replace these defective

metering is in process.

Metering have been provided to 2330 Nos. 11 KV feeders out of total -

2580 Nos. At the end of March‟11, 259 metering are reported defective. Field

officers are in process of providing metering on balance 250 feeders and

replacement of 259 defective metering. Availability of meters and MEs is

being ensured at company level at the earliest.

*****

Page 48: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

48

M.P. ELECTRICITY DISTRIBUTION CODE

This Annual report covers status of compliance of the directives on one

identified issue pertaining to MPERC regulation on M.P. Distribution code

(published in official gazette on dated 4/1/2006). This issue has been

complied in full.

1. Clause 5.3.3 : Five year demand forecast starting with ensuing

year, revised annually.

i. Status of Compliance:-

Load demand of various categories of consumers and forecast of

demand of power within the area of supply in each of succeeding five

years has been prepared and revised during 10-11 (copy enclosed) as

Annexure B & C.

ii) CMD Observation on status of compliance:-

The directive is complied.

iii) Target date proposed for achieving full compliance/ additional

remarks if any:-

The directive is fully complied by the Discom.

******

Page 49: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

-49-

MIS REGULATIONS

This Annual report covers status of compliance of the directives on two

identified issues of MIS regulation (Gazette notification No. 888 dated

02.04.2004 and published in official Gazette on dated 30.04.2004). Both the

issues are complied.

I. Clause No. 3.2 : "Periodicity of submission of Information".

i. Status of compliance:-

The periodicity of reports in prescribed formats has been maintained as

specified in clause.

ii CMD's observation on status of compliance:–

Directive is fully complied.

iii Target date proposed for achieving full compliance/ additional

remarks, if any-

No.

II. Clause No. 3.3 – "Each report shall be submitted within 45

days of end of quarter.

i. Status of compliance:-

The status of submission of reports has remained as below:-

Duration Due date Date of submission of Report

Bhopal Region Gwalior Region

First quarter ending June 2010 15.08.10 12-08-2010 10-08-2010

Second quarter ending Sept’2010 15.11.10 16-11-2010 18-11-2010

Third Quarter ending Dec’2010 15.02.10 15-02-2011 10-02-2011

Fourth Quarter ending March’2011 15.05.11 07-05-2011 16-05-2011

Page 50: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

50

ii CMD's observation on status of compliance:–

Reports are submitted regularly by ROC.

iii Target date proposed for achieving full compliance/ additional

remarks, if any:–

No.

The salient features have been discussed as under:

A. T & D Losses, Collection efficiency and AT&C losses.

Period T&D Losses (%) AT & C losses (%) Collection efficiency

2010-11 31.82 37.72 0.91

2009-10 35.15 38.48 0.95

2008-09 38.93 41.58 0.96

2007-08 41.43 47.31 0.90

2006-07 42.64 48.80 0.89

During the period under report T&D losses have reduced and AT&C efficiency

has increased. T&D loss remained 31.82 % as against the limit of 33% fixed

by GoMP.

B. Stopped/Defective meters(LT)

Region

Area No. of Metered

consumers S/D meters at

the end of Year

% of S/D meters at the end of Year

Bhopal

Urban 681194 19945 2.93

Rural 493153 24419 4.95

Gwalior

Urban 455796 24301 5.33

Rural 256959 9580 3.72

Discom 1887102 78245 4.14

Page 51: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

-51-

C. Stopped defective meters HT

Region No. Consumers Defective meters at the end of Half year

ME Meters

Bhopal 905 1 9 *

Gwalior 411 0 0

Discom 1316 1 9

*R-15

At the end of March‟11, 1Nos. MEs and 9 Nos. HT meters remained

defectives. Replacement of these defective MEs and Meters is being ensured.

D. Irregularities Detected under section-135

Region Connection

checked Case

Registered

Case submitted to Court

Cases Compounded

Cases decided by Court

Bhopal 24855 6570 5171 4383 4077

Gwalior 38507 10739 4061 3646 3574

Discom 63362 17309 9232 8029 7651

As a result of intensive checking of connections by vigilance and O&M staff

17309 cases registered under section 135.

E. DTR failure.

Distribution transformer failure during the period under report has remained

as under.

S.

No.

Region No of DTRs installed No of DTRs failed %age of DTR failed

1 Bhopal 44397 7011 15.79

2 Gwalior 50114 4988 9.95

CZ 94511 11999 12.69

Page 52: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

52

The benchmark set for DTR failure under performance standard regulation for

FY 10-11 is 6.79 %. The failure has exceeded the bench mark during 10-11.

F. Accidents

237 Fatal and 78 Non-fatal electrical accidents occurred during the

period under report.

Region

Fatal Electrical Non-fatal Electrical

Depp.

Employees outsiders Animals Total

Depp.

Employees outsiders Animals Total

Bhopal 7 42 24 73 16 15 0 31

Gwalior 7 48 109 164 18 23 6 47

CZ 14 90 133 237 34 38 6 78

Out of above 14 fatal accidents occurred to departmental employees,

90 accidents to outsiders and 133 to animals. Field staff has been asked to

spread awareness towards safe working on lines and to use safety appliances.

It was gathered from reports that most of the outsiders who met with

accidents were involved in theft of electricity/interference with live wires and

unsafe working with electrical appliances.

*****

Page 53: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

-53-

Security Deposit Regulations

This Annual report covers status of compliance on two identified issues

of MPERC (Security deposit) regulations 2004 (Gazette Publication No. 2560

dated 22.09.2004 and published in official Gazette on date 01.10.2004. Both

the issues are complied in full.

I. Clause No. 1.21- "Licensee to pay interest at bank rate on

security deposit w.e.f. 10th June 2004".

i Status of compliance:-

Interest on security deposit received from consumers is being paid to

consumer at bank rate w.e.f. 10th 2004.

ii. CMD's observation on status of compliance: –

The directive is fully complied.

iii Target date proposed for achieving full compliance/ additional

remarks, if any

No

II. Clause No. 1.22- "Interest on security be paid every month

commencing from October 2004".

i. Status of compliance:-

Interest on security to consumers is being credited every month

through monthly energy bills.

ii. CMD's observation on status of compliance: –

The directive is fully complied.

iii. Target date proposed for achieving full compliance/ additional

remarks, if any:

No.

*****

Page 54: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

54

M.P. REGULATION ON TREATMENT OF INCOME

OF OTHER BUSINESS OF LICENSEE

This Annual report for the period from April 10 to March‟11 covers

status of compliance on three identified issues of "M.P. Regulation on

treatment of income of other business of license" for implementation – All

three issues are complied in full.

I. Clause No. 3 (1):- Details of other business including nature,

proposed capital investment, nature and extent of the use of

assets and facilities of the Licensed Business for the Other

Business, impact and manner of the use of assets and facilities

for the Other Business on the Licensed Business and on the

ability of the Licensee to carry out the duties and obligations

of the Licensed Business.

i. Status of compliance:-

The Discom is not engaged in any other business. Compliance of these

directions will be observed as and when business other than sub-

Transmission and distribution of power will be started by the DISCOM.

ii CMD's observation on status of compliance :–

Details of other business whenever started will be furnished to Hon‟ble

Commission.

iii. Target date proposed for achieving full compliance/ additional

remarks, if any

No

Page 55: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

-55-

II. Clause No. 4(1):- "Separate financial statements on other

business including a Profit & Loss statement, balance sheet

and a statement of source and application of funds.

i. Status of compliance:-

Separate financial statements will be prepared as per the directions

contained in Regulation and will be furnished to commission within

time frame provided in Regulation, whenever the Discom will be

engaged in other business.

ii. Target date proposed for achieving full compliance/

additional remarks, if any.

No

III. Clause No. 4(2):- Information to establish that the Other

Business duly bear an appropriate share of overhead costs and

other common costs.

i. Status of compliance:-

Required information will be submitted to Hon‟ble Commission as per

provision of Regulation.

ii CMD's observation on status of compliance :–

Agreed.

*****

Page 56: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

56

CONDITIONS OF LICENSE

This Annual report for the period from April‟ 2010 to March‟11 covers

status of compliance on 12 identified issues of MPERC conditions of

distribution license for distribution licensee-2004, out of these 11 issues are

complied fully, and one issue partially complied .

I. Directions given in Clause 7. 2 “Profit & Loss account, Balance

sheet, Cash flow statement.

i) Status of Compliance:

The profit and loss account, balance sheet and cash flow statement for

FY 09 were net ready and therefore permission was sought from

“Ministry of Company affairs” Govt. of India for extending last date of

holding of Annual General Meeting. The AGM was held on 18.01.2011,

wherein the financial statements were approved in the meeting.

Interim financial statements are not prepared by the company.

The software presently available with the company for making trial

balance does not allow half yearly closing.

The Annual financial statements for 2010-11 are under

preparation and expected to be finalized within schedule time limit.

ii) CMD's observation on status of compliance:

Annual financial statements for FY-2010-11 are expected to be finalized

within time limits.

iii) Target date proposed for achieving full compliance/additional

remarks, if any-:

Annual financial statements for 2010-11 are expected to finalize by the

end of Sept‟11. The company has implemented system integration

Project (ERP), the work is in progress and after implementation of ERP

the interim accounts shall be prepared for first six months of each

financial year.

Page 57: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

-57-

II. Directions given in Clause 9.1 "Various details about licensee's

business in formats enclosed with regulations.

i) Status of Compliance:

The required details in formats I to V for the year 10-11 are being

submitted to the Commission by CGM (Comm) timely.

ii) CMD's observation on status of compliance:

Agree.

iii) Target date proposed for achieving full compliance/ additional

remarks, if any -

No

III. Directions given in Clause 9.3 "Report on Major Incident".

i) Status of Compliance:

Compliance will be ensured as per provision of the clause.

ii) CMD's observation on status of compliance:

Compliance will be ensured as per the regulation.

iii) Target dated proposed for achieving full compliance/

additional remarks, if any –

No.

IV. Directions given in Clause 9.9, "5- year Business Plan (year

wise load growth, year wise distribution loss reduction proposal

along with specific action plan, metering plan, 5-year investment

plan, Rural electrification plan status of electrified and un-electrified

households, program for rural electrification, Human resource

planning, measures to improve consumer service, account of assets

created).

Page 58: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

58

i) Status of Compliance:-

Business plan along with all relevant information‟s has been submitted

to Hon‟ble Commission. This plan has been updated for the period

2011-12 to 2016-17. This plan is submitted to Hon‟ble Commission

after obtaining approval from BOD in next meeting.

ii) CMD's observation on status of compliance:-

The directive is complied.

iii) Target date proposed for achieving full compliance/additional remarks, if any-

No.

V. Directions given in Clause 10.2 a “Highlights of the annual

investment plan as well as permission for reallocation of funds

within approved schemes.

i). Status of compliance:-

Investment plan has also been updated along with business plan. Year wise

provisions made are as under.

FY

2010-11

FY

2011-12

FY

2012-13

FY

2013-14

FY

2014-15

FY

2015-16

FY

2016-17

Total

540.85 1799.67 1443.85 793.71 606.09 445.00 445.00 6074.17

The entire capital investment of Rs 6074.17 Crore has been planned from

various funding agency as mentioned in the table below.

Page 59: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

-59-

SN Name of

Scheme

Plan

10-11

Plan

11-12

Plan

12-13

Plan

13-14

Plan

14-15

Plan

15-16

Plan

16-17 Total

1 System

Strengthening Scheme

149.65 150.00 150.00 150.00 180.00 180.00 180.00 1139.65

2 New

Agriculture pump

connection

5.00 15.00 15.00 15.00 15.00 15.00 15.00 95.00

3 Feeder

Separation 199.74 1035.41 531.53 165 195 195 195 2516.68

4 R-APDARP 62.62 250.00 300.00 157.00 161.09 0.00 0.00 930.71

5 ADB-II 90.00 250.00 250.00 220.99 0.00 0.00 0.00 708.38

6 RGGVY 100.00 195.34 262.32 150.72 0.00 0.00 0.00 708.38

7 HUDCO 68.49 68.92 0.00 0.00 0.00 0.00 0.00 137.41

8 DFID 20.00 0.00 0.00 0.00 0.00 0.00 0.00 20.00

9 HVDS for

agriculture Pump

0.00 0.00 100.00 100.00 100.00 100.00 100.00 500.00

10 Distribution infrastructure

For urban

slums/ Illegal colonies

0.00 0.00 0.00 0.00 50.00 50.00 50.00 150.00

11 Other 0.00 0.00 0.00 0.00 100.00 100.00 100.00 300.00

TOTAL 540.85 1799.67 1443.85 793.71 606.09 445.00 445.00 6074.17

Page 60: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

60

ii). CMD's observation on status of compliance:-

Investment plan has been updated and Honorable Commission will be

appraised the status after obtaining approval from BOD.

iii). Target date proposed for achieving full compliance/additional

remarks, if any.

No

VI. Directions given in Clause 11.2 "Transfer of operational

control of assets over Rs. 100 lakh.

i). Status of compliance:-

No any operational control of assets has been transferred to any

agency during the period under report.

ii). CMD's observation on status of compliance:-

Prior Intimation with all relevant facts will be given to Hon'ble

Commission of its intention to transfer operational control over any

asset whose value exceeds Rs. 100 Lakh.

ii) Target date proposed for achieving full compliance/additional

remarks, if any-

No

VII. Directions given in Clause 17 "Power Purchase Agreement

(including analysis of economic, technical, system and

environmental aspects of commercially viable alternatives).

i. Status of Compliance:

The Govt. of M.P. has approved formation of a trading Company and

CENTRAL DISCOM is intimating its requirement to this trading

Company each day. Bulk supply agreement with M.P. Power Trading

Co. Ltd. has been executed alongwith the other two Discoms.

Page 61: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

-61-

ii. CMD's observation on status of compliance:

Compliance of the regulation is being ensured.

iii. Target date proposed for achieving full compliance/additional

remarks, if any-

No.

VIII. Directions given in Clause 20.2 “Distribution Code Review.”

i. Status of compliance:-

Review of Distribution Code is being done as per directive of the code.

Recommendations of panel about proposed amendments to the code

alongwith proceedings is being submitted to Hon‟ble Commission on

turn as per amended provision of code.

ii. CMD's observation on status of compliance:-

Necessary compliance will be done by Central Discom as per the

directives of Commission.

iii. Target date proposed for achieving full compliance/addition

remarks, if any-

No

IX. Directions given in Clause 20.5 "Compilation of existing codes

and practices relating to construction of the Licensee's Distribution

System and its Distribution facilities".

i. Status of Compliance:-

At present the same code and practices relating to construction which

were in practice in MPSEB, is being followed in the company, a copy of

code already submitted to Hon‟ble Commission.

Page 62: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

62

ii. CMD's observation on status of compliance:-

Company's own code and practices relating to construction will be

prepared when felt necessary or code being finalized by CEA will be

opted by the Company.

iii. Target date proposed for achieving full compliance/additional

remark, if any:-

No.

X. Directions given in Clause 21.3 "Report on the performance of

the Licensee's Distribution System".

i. Status of compliance:-

Reports on “Electricity Supply code, “Guidelines for Redressal of

Consumer Grievances” and “Distribution Performance Standards” are

submitted regularly to Hon‟ble Commission.

ii. CMD's observation on status of compliance:-

Compliance has been made by the Discom.

iii. Target date proposed for achieving full compliance/ additional

remark, if any:-

No

XI. Directions given in Clause 23.3 (a) "Annual forecast of the

demand for power within the Area of Supply for 5 years".

i. Status of compliance:-

Annual forecast of demand has been prepared. A copy of the same is

attached herewith as Annexure B & C.

ii. CMD's observation on status of compliance:-

Complied.

Page 63: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

-63-

iii. Target date proposed for achieving full compliance/additional

remark, if any:-

No

XII. Directions given in Clause24.2 "Standards of Performance

Compliance Report".

i. Status of compliance:-

Report is being submitted every quarter, covering performance on

various performance standards set in the regulation.

ii. CMD's observation on status of compliance:-

Complied.

iii. Target date proposed for achieving full compliance/additional

remark, if any:-

Not applicable as already complied.

*****

Page 64: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

64

MIS FORMATS

Page 65: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

65

S. No. PARTICULARS UNITS CZ DISCOM

1 2 3 6

1 Total Input LAKH 113302.04

2 Total Sales LAKH 77251.65

3 Total Demand Rs Cr 3676.13

4 Total Collections Rs Cr 3357.91

5 Total actual collection efficiency % 91

6 Absolute (AT&C) efficiency achieved % 61

7 No. of consumers (HT+LT) NO 2573255

8 Total Connected/Contracted Load MW 4343.55

9 Distribution losses % 31.82

10 Average Tariff Rs/Unit 4.70

11 Total arrear Rs Cr 2180.93

MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY LTD. BHOPAL

ANNUAL REPORT ON OVERALL MIS PERFORMANCE FORMAT:D-1

Page 66: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

66

INSTALLATION OF METERS TO DIFFERENT CATEGORIES OF UNMETERD LT CONNECTIONS

S. No

Name of Region

Category

Year Ending March’11

No of LT consumers at the end of year

No. of meters installed during

the year

No of LT consumers without meters at the

end of the year

%age of LT consumers

without meters at the end of year

1 2 3 4 5 6 7

1

BHOPAL

REGION

DOMESTIC 879223 5735 96057 10.85

BPL/ SLP 408966 16170 256107 60.24

AGRICULTURE 176240 5386 108439 59.70

OTHERS 170521 0 0 0

TOTAL 1634950 27291 460603 27.70

2

GWALIOR

REGION

DOMESTIC 545734 805 25572 4.68

BPL/SLP 145002 141 70951 48.93

AGRICULTURE 140522 78 124687 88.73

OTHERS 102295 0 0 0.0

TOTAL 933553 1024 221210 23.69

3 TOTAL

DOMESTIC 1424957 6540 121629 85.35

BPL/SLP 553968 16311 327058 59.03

AGRICULTURE 316762 5464 233126 73.60

OTHERS 272816 0 0 0

TOTAL 2568503 28315 681813 26.54

Page 67: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

67

MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY LTD. BHOPAL

STOPPED/DEFECTIVE METERS (LT)

YEAR REPORT 2010-11

Format D-3

Name of Region

Area Stopped Defective

Meter as on 01.04.10

Fresh S/D Meters added

S/D Meters

replaced

during the

Year

Balance S/D

Meter at the

end of the

year

Total Metered

Consumers at

the end of the

year

% age of S/D Meters

at the end of year

1 2 3 4 5 6 7 8

BHOPAL

REGION

Urban 16945 25886 22886 19945 681194 2.93

Rural 17570 33997 20422 24419 493153 4.95

Total 34515 59883 43308 44364 1174347 3.77

GWALIOR

REGION

Urban 16383 40279 32361 24301 455796 5.33

Rural 1819 12337 4576 9580 256959 3.73

Total 18202 52616 36937 33881 710237 4.77

Discom

Urban 33328 66165 55247 44246 1136990 3.89

Rural 19389 46334 24998 33999 750112 4.53

Total 52717 112499 80245 78245 1887102 4.14

Page 68: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

68

MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY LTD. BHOPAL REPLACEMENT OF

STOPPED/DEFECTIVE METERS (HT)

YEARLY ENDING MARCH’11 Format D-4

Region

Total

Meters

Installed

Stopped/Defective

Meter as on

01.04.10

Fresh S/ D

Meters added Total S/D Meters

S/D Meters replaced

during the year

Balance S/D

Meters at the end

of year

ME Meters Me Meter ME Meter ME Meter ME Meter

1 2 3 4 5 6 7 8 9 10 11 12

Bhopal 905 1 3 57 16 58 19 57 10 1 9

Gwalior 411 1 1 19 3 20 3 20 3 0 0

Discom 1316 2 4 79 19 78 22 77 13 1 9

Above mentioned figures are taken from field.

MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY LTD. BHOPAL

Page 69: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

69

ANNUAL REPORT ON OVERALL MIS PERFORMANCE FORMAT: D-5

DETAILS OF IRREGULARITIES DETECTED Under Section135 Year ending March’11

Name of

region

Connection

Checked

Irregularities

detected

Cases filed in

Court

Cases

Compounded

Cases decided

by Court

1 2

3 4 5 6

Bhopal 66502 16373 9985 10056 8974

Gwalior 38507 10739 4061 3646 3574

Total CZ 105009 27112 14046 13702 12548

Page 70: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

70

FORMAT: D - 6(1)

MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY LTD. BHOPAL ANNUAL REPORT ON OVERALL MIS PERFORMANCE DETAILS OF DISTRIBUTION TRANSFORMER FAILURE

Year Ending March’11

NAME OF

REGION

No. of X'mer

installed

X'mer failed

during the Year.

X'mer replaced during

the Year. % age of X’mer failed

1 2 3 4 5

Detail of Distribution Transformer failure

Bhopal 44397 7011 6705 15.79

Gwalior 50114 4988 4416 9.95

Total CZ 94511 11999 11121 12.69

Details of Power Transformer failure

1 2 3 4 5

Bhopal 709 8 8 1.13

Gwalior 547 38 37 6.94

Total CZ 1256 46 45 3.66

Page 71: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

71

Supply Code Formats.

(Bhopal Region)

Page 72: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

72

MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY LTD. BHOPAL

RELEASE OF NEW CONNECTIONS WITH METER ONLY Period April'2010 to March’2011

NAME OF REGION : BHOPAL (BR)

FORMAT ESC 6

S.NO. CATEOGRY

TOTAL NO. OF NEW CONNECTIONS

RELEASED DURING THE YEAR

NO. OF NEW CONNECTIONS

RELEASED WITHOUT METER

TOTAL NO. OF EXISTING METERED CONNECTIONS

AT THE END OF YEAR

TOTAL NO. OF EXISTING UNMETERED CONNECTIONS AT THE

END OF YEAR

1 DL&F 133506 38824 783166 96057

2 Non Domestic 4759 0 117404 0

3 Water Works 146 0 3608 0

4 I.P 871 0 14160 0

5 Agriculture 5259 2586 68205 108439

6 St.Light 8 0 1346 0

7 S.L.P. 101670 41990 152859 256107

8 Others 0 0 33599 0

TOTAL 2,46,219 83400 1174347 460603

Page 73: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

73

MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY LMD. BHOPAL

DETAILS OF VARIOUS TYPE OF METERS INSTALLED IN AREA OF LICENSEE

(As on 31.03.2011) FORMAT ESC 7

NAME OF REGION : BHOPAL (BR)

S.NO. TYPE OF METERS NO. OF METERS INSTALLED AS AT THE END OF YEAR

1 SINGLE PHASE ELECTRO MECHANICAL 267320

2 SINGLE PHASE- ELECTRONIC 724136

3 THREE PHASE ELECTRO MECHANICAL 21509

4 THREE PHASE ELECTRONIC 158356

5 THREE PHASE WHOLE CURRENT METER 1942

6 THREE PHASE LTCT 1084

7 TOTAL LT METERED CONSUMERS 1174347

8 HT METER- ELECTRO MECHANICAL 0

9 HT METER- ELECTRONIC 905

TOTAL 11,75,252

Page 74: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

74

MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY LMD. BHOPAL

TESTING OF METERS ON CONSUMER'S REQUEST ON DEPOSITION OF CONTEST FEE Period April'10 to March’11

BHOPAL REGION

FORMAT ESC 9

S. NO.

CATEGORY

NO. OF CONSUMERS WHO APPLIED FOR TESTING

THEIR METERS

NO. OF CONSUMERS

WHOSE METERS TESTED WITHIN 30

DAYS APPLICATIONS

NO. OF CONSUMERS WHOSE METERS COULD NOT BE TESTED WITHIN

30 DAYS OF APPLICATION

NO. OF METERS FOUND WITHIN PERMISSIBLE LIMITS OF ACCURACY

AGAINST COL.4

NO.OF METERS FOUND BEYOND PERMISSIBLE LIMITS OF ACCURACY

AGAINST COL.4

1 2 3 4 5 7 8

1 DOMESTIC 4514 4357 157 3240 1117

2 COMMERCIAL 416 414 2 320 94

3 I.P. 16 16 0 8 8

4 WATER WORKS

0 0 0 0 0

REGION TOTAL 4946 4787 159 3568 1219

Page 75: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

75

MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY LMD. BHOPAL

Disconnection after issue of PFL notice

Format ESC 11

Name of Region- Bhopal

Period April'10 to March’11

S. no.

NAME OF CIRCLE No. of consumers where meter

readings not done during two

consecutive reading cycles

No. of consumers to whom 2nd PFL

notices issued

No. of consumers where readings could

not be done after issue of 2nd PFL

notice

No. of consumers to whom 24 hours

notice issued under Sec 163 (3) of E-Act 2003 against col. 4

No. of connections disconnected against col. 5

1 2 3 4 5 6 7

1 CITYCIRCLE BHOPAL 3249 1650 741 0 0

2 O&M BHOPAL 430 269 230 107 107

3 VIDISHA 114 72 47 0 0

4 SEHORE 325 0 0 0 0

5 RAJGARH 8 0 0 0 0

6 HOSHNAGABAD 71 71 13 0 0

7 BETUL 966 350 81 7 7

REGION TOTAL 5162 2412 1112 114 114

Page 76: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

76

MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY LMD. BHOPAL Redressal of disputed / erroneous bills- bill related complaints

Format ESC 12

Name of region: BHOPAL

Period April'2010 to Mar’11

Circle

No. of complaints

pending at the beginning of

half year

No. of complaints

received during the half year

Total of col. 3 & 4

No. of complaints resolved during the half year out

of col. 5

No. of complaints resolved within 7 days of receipt of application out of

col. 5

No. of complaints pending at the end

of half year

2 3 4 5 6 7 8

CITY BHOPAL 0 13691 13691 13691 13467 0

O&M BHOPAL 0 1685 1685 1685 1670 0

VIDISHA 0 1407 1407 1407 1290 0

SEHORE 0 1437 1437 1437 1337 0

RAJGARH 0 586 586 586 566 0

HOSHNAGABAD 0 2335 2335 2335 2335 0

BETUL 0 933 933 933 909 0

TOTAL 0 22074 22074 22074 21574 0

Page 77: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

77

MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY LMD. BHOPAL

Connected consumers having arrears for more than 3 month & details of permanently disconnected consumers

Bhopal Region

YEAR April'2010 to March’11

Format ESC 13

Sl.No. Name of circle

No.of connected consumers who are in arrears of more than

three months

Amount of arrears against Col. 3 (Rs,in Lacs)

Reasons for Non-

disconnection of consumers

of Col. 3

No.of connections permanently disconnected

Amount of arrears against Col. 6 (Rs.

in Lakhs)

1 2 3 4 5 6 7

1 CITY BHOPAL 35212 1091.91

Being Govt.

offices/ Water

Works/ Street

Light / VIPs /

etc.

11361 839.23

2 O&M BHOPAL 43566 8361.69 31708 2068.22

3 VIDISHA 2636 62.55 14530 1093.14

4 SEHORE 44999 1639.00 8367 417.66

5 RAJGARH 39663 2853.62 21175 990.59

6 HOSHANGABAD 49870 2280.95 36237 1898.21

7 BETUL 17375 436.47 13636 314.93

TOTAL

231321 16726.19 137014 7621.98

Page 78: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

78

Supply Code Formats

(Gwalior Region)

Page 79: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

79

MP MADHYA KSHETRA VIDYUT VITARAN CO. LTD, GWALIOR REGION RELEASE OF NEW CONNECTIONS WITH METERS ONLY

Formate ESC(6)

NAME OF CIRCLE CATEGORY TOTAL NO.OF NEW

CONNECTIONS RELEASED

DURING PERIOD UNDER REPORT

NO.OF NEW CONNECTIONS

RELEASED WITHOUT METER

TOTAL NO. OF EXISTING METERED

CONNECTIONS.

TOTAL NO. OF EXISTING UN-

METERED CONNECTIONS.

TO

TA

L R

EG

ION

DL & F 42403 0 519637 25572

Non-Domestic 2434 0 83443 0

Water works 351 0 3442 0

IP 289 0 13778 0

Agriculture 12262 11158 15835 124687

St. Light 4 0 730 0

S.L.P. 64322 43238 74051 70951

Others 0 0 1428 0

TOTAL 122065 54396 712344 221210

Page 80: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

80

FORMAT ESC-7 MP MADHYA KSHETRA VIDYUT VITARAN CO. LTD, GWALIOR REGION

DETAILS OF VARIOUS TYPES OF METERS INSTALLED OF LICENSEE (As on 31-03-2011)

S.No. TYPES OF METERS NO.OF METERS INSTALLED AS AT

THE END OF YEAR

1 SINGLE PHASE ELECTRO MECHANICAL

180587

2 SINGLE PHASE- ELECTRONIC

475237

3 THREE PHASE ELECTRO MECHANICAL

6149

4 THREE PHASE ELECTRONIC

47874

5 THREE PHASE WHOLE CURRENT METER

875

6 THREE PHASE LTCT

1622

7 HT METER- ELECTRO MECHANICAL

0

8 HT METER- ELECTRONIC

411

TOTAL

712755

GWALIOR REGION

Page 81: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

81

MP MADHYA KSHETRA VIDYUT VITARAN CO. LTD, GWALIOR REGION FORMAT ESC-9

METERS ON CONSUMER'S REQUEST ON DEPOSITION OF CONTEST FEE GWALIOR REGION TESTING OF APRIL '10 March’11

S.NO.

NAME OF CIRCLE

NO.OF CONSUMERS WHO APPLIED FOR TESTING OF THEIR

METERS

NO.OF CONSUMERS

WHOSE METERS TESTED WITHIN

30 DAYS OF APPLICATION

NO.OF CONSUMERS

WHOSE METERS COULD NOT BE

TESTED WITHIN 30 DAYS OF

APPLICATION

REASONS FOR DELAY IN TESTING

NO.OF METERS FOUND WITHIN PERMISSIBLE LIMITS OF ACCURACY

AGAINST COL.4

NO.OF METERS FOUND BEYOND PERMISSIBLE LIMITS OF

ACCURACY AGAINST COL.4

1 2 3 4 5 6 7 8

1 CITY GWALIOR

1095 1095 0 0 530 565

2 (O&M) GWALIOR

675 675 0 0 341 334

3 MORENA 613 613 0 0 457 156

4 BHIND 485 485 0 0 168 317

5 GUNA 847 847 0 0 447 400

6 SHIVPURI 651 651 0 0 300 351

TOTAL 4366 4366 0 0 2243 2123

Page 82: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

82

MP MADHYA KSHETRA VIDYUT VITARAN CO. LTD, GWALIOR REGION

ESC-11

DISCONNECTION AFTER ISSUE OF PFL NOTICE

APRIL '10 MAR’11 GWALIOR REGION

S.N Circle

No.of consumers where meter readings not done during two consecutive

reading cycles

No.of consumers to whom 2nd PFL notices

issued

No.of consumers where readings could not be done after issue of 2nd

PFL notice

No.of consumers to whom 24 Hrs.

notice issued under Sec.163(3)

of E. Act. 2003 against col.4

No.of connections disconnected against col.5

1 2 3 4 5 6 7

1 Gwalior City 2003 489 49 0 0

2 Gwalior O&M

0 0 0 0 0

3 Morena 95 40 0 0 0

4 Bhind 10 04 0 0 0

5 Guna 420 226 9 0 0

6 Shivpuri 590 414 0 0 0

Total Region 3118 1178 58 0 0

Page 83: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

83

MP MADHYA KSHETRA VIDYUT VITARAN CO. LTD, GWALIOR REGION

ESC-12 REDRESSAL OF DISPUTED / ERRORNEOUS BILLS - BILL RELATED COMPLAINTS

APRIL '10 March’11

S.No. Circle No.of complaints pending at the

beginning of Hly.

No.of complaints received during the

Hly. Total of col.3 & 4

No.of complaints resolved during the

Hly. out of col.5

No.of complaints resolved within 7 days of receipt of application out of

col.5

No.of complaints

pending at the end of Hly.

1 2 3 4 5 6 7 8

1 Gwalior City 5 16279 16284 16284 16279 0

2 Gwalior O&M 0 2119 2119 2119 1386 0

3 Morena 0 690 690 690 690 0

4 Bhind 0 670 670 670 670 0

5 Guna 0 4748 4748 4748 4748 0

6 Shivpuri 0 6488 6488 6488 6488 0

Total Region 5 30994 30999 30999 30994 0

Page 84: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

84

MP MADHYA KSHETRA VIDYUT VITARAN CO. LTD, GWALIOR REGION

CONNECTED CONSUMERS HAVING ARREARS FOR MORE THAN 3 MONTHS & DETAILS OF PERMANENTLY DISCONNECTED CONSUMERS

APRIL '10 MAR’11

ESC-13

S.No. Circle

No.of connected consumers who are in arrears of more than three

months

Amount of arrears against col.3 (Rs. In

Lacs)

Reasons for non disconnection of

consumers of col.3

No.of connections permently

disconnected

Amount of arrears against col.6 (Rs.in

lacs)

1 2 3 4 5 6 7

1 Gwalior City 30257 6922.37

Connection related to public interest such as water works etc

and other Govt. connections & some disputed connections are not disconnected

.meanwhile some disconnections are in

progress

20783 2379.07

2 Gwalior O&M 26247 6276.95 16568 1260.52

3 Morena 14899 18817.38 25041 7152.58

4 Bhind 25381 12846.29 12225 2647.49

5 Guna 8878 2195.29 26331 2325.39

6 Shivpuri 30746 7681.54 15069 1097.38

Total Region 136408 54739.82

116017 16862.43

Page 85: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

85

Formats I to V:

Conditions of license.

Page 86: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

86

Format-1

SHORT TITLE DESCRIPTION OF THE PROPOSED UNDERTAKING

NAME OF THE COMPANY - Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company Limited

REGISTERED ADDRESS - Nishtha Parisar, Govindpura, Bhopal, Madhya Pradesh 462023

DATE OF INCORPORATION - 31st May, 2002

DATE OF REGISTRATION - 31st May, 2002

DATE OF COMMENCEMENT - 16th July, 2002 OF BUSINESS

SHARE CAPITAL - Authorized Share Capital - Rs.2500,00,00,000/-

- Issued Capital - Rs. 1234,53,01,000/-

NUMBER OF SUBSCRIBER - 9- GoMP Nominees

Page 87: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

87

NAME OF THE CMD - Shri Sanjay Kumar Shukla

NAME OF ALL DIRECTORS 1 Shri Sanjay Kumar Shukla, Chairman & Managing Director

2 Mohd. Suleman

3. Shri Manoj Shrivastav

4 Shri Nitesh Vyas

5 Shri A.C. Chakrabortti

6 Shri M.K. Dube

7., Shri N.S. Saxena

8. Shri Vinod Kumar Singh

Company Secretary 1. Miss Surya Kawalkar

2. Mrs. Sharill A . Dubey

Page 88: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

88

SECRETARY

Proposed Organization Structure (

Distribution

Proposed functions (Please Tick)

Distribution

Transmission

Trading

Any other (please describe)

Licence Applied for (Please Tick)

Retail Supply License

Distribution License

Bulk Supply License

Transmission License

Proposed functions (Please Tick)

Bulk Supply

System Operator/Load Dispatch

Transmission

Sub-Transmission

Distribution

Retail Supply

Any other (please describe)

Page 89: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

89

INTERFACE POINTS BETWEEN TRANSCO AND DISCOM ( CENTRAL ZONE ) Format-II

Sr. No. LOCATION NAME OF FEEDERS VOLTAGE

LEVEL

NO. OF METERING

POINTS

DETAILS OF METERS DETAILS OF CT DETAILS OF PT

TYPE CLASS OF

ACCURACY RATIO

CLASS OF ACCURACY

RATIO CLASS OF

ACCURACY

1 132KV BHOPAL(CH.) 63MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 1600/1 0.5 33KV/110 V 0.5

2 132KV BHOPAL(CH.) 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 400/1 0.5 33KV/110 V 0.5

3 132KV BHOPAL(CH.) 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

4 132KV BHOPAL(CH.) 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 400/1 0.5 33KV/110 V 0.5

5 132KV MACT BHOPAL 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 1 33KV/110 V 0.5

6 132KV MACT BHOPAL 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

7 132KV MACT BHOPAL 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 400/1 0.5 33KV/110 V 0.5

8 132KV LALGHATI BPL 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

9 132KV LALGHATI BPL 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

10 132KV KURAWAR 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

11 132KV KURAWAR 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

12 132KV VIDISHA 63MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 1600/1 0.5 33KV/110 V 0.5

13 132KV VIDISHA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 1 33KV/110 V 0.5

14 132KV SEHORE 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 1 33KV/110 V 0.5

15 132KV SEHORE 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

16 132KV MANDIDEEP 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

17 132KV MANDIDEEP 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

18 132KV RAISEN 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 400/1 1 33KV/110 V 0.5

Page 90: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

90

19 132KV RAISEN 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 400/1 1 33KV/110 V 0.5

20 132KV RAISEN 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

21 132KV BERASIA 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 400/1 1 33KV/110 V 0.5

22 132KV BERASIA 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 400/1 0.5 33KV/110 V 0.5

23 132KV BERASIA 16MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 400/1 0.5 33KV/110 V 0.5

24 132KV ASHTA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 1

25 132KV ASHTA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 1 33KV/110 V 1

26 132KV SARANGPUR 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 400/1 1 33KV/110 V 0.5

27 132KV SARANGPUR 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 400/1 1 33KV/110 V 0.5

28 132KV SARANGPUR 12.5MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 400/1 1 33KV/110 V 0.5

29 132KV BEORA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 1 33KV/110 V 0.5

30 132KV BEORA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 1 33KV/110 V 0.5

31 132KV KHILCHIPUR 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 400/1 1 33KV/110 V 0.5

32 132KV KHILCHIPUR 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 400/1 1 33KV/110 V 0.5

33 132KV SIRONJ 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 400/1 0.5 33KV/110 V 0.5

34 132KV SIRONJ 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 400/1 0.5 33KV/110 V 0.5

35 132KV GANJBASODA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

36 132KV PACHORE 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

37 132KV JEERAPUR 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.2 33KV/110 V 0.5

38 132KVNASURALLAHGANJ 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

39 132KV AYODHYANAGAR 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

40 132KV GAIRATGANJ 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

Page 91: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

91

41 220KV ITARSI 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

42 220KV ITARSI 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 400/1 1 33KV/110 V 0.5

43 220KV SARNI 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 400/1 1 33KV/110 V 0.5

44 220KV SARNI 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 400/1 1 33KV/110 V 0.5

45 132KV HARDA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

46 132KV HARDA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

47 132KV BETUL 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 1 33KV/110 V 0.5

48 132KV BETUL 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 1 33KV/110 V 0.5

49 132KV HOSANGABAD 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 1 33KV/110 V 0.5

50 132KV HOSANGABAD 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 400/1 1 33KV/110 V 0.5

51 132KV HOSANGABAD 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 400/1 1 33KV/110 V 0.5

52 132KV PIPARIA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.2 33KV/110 V 0.5

53 132KV PIPARIA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 1 33KV/110 V 0.5

54 132KV MULTAI 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 400/1 0.5 33KV/110 V 0.5

55 132KV MULTAI 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 1 33KV/110 V 0.5

56 132KV BARELI 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 400/1 1 33KV/110 V 0.5

57 132KV BARELI 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

58 132KV SEONI MALWA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 1

59 132KV GUDGAON 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 1

60 220KV GWALIOR 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 1 33KV/110 V 0.5

61 220KV GWALIOR 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 1 33KV/110 V 0.5

62 220KV GWALIOR 63MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 1200/1 1 33KV/110 V 0.5

Page 92: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

92

63 220KV MALANPUR 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

64 220KV MALANPUR 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 400/1 0.2 33KV/110 V 0.2

65 132KV MEHGAON 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 400/1 0.2 33KV/110 V 0.2

66 132KV MEHGAON 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 400/1 0.2 33KV/110 V 0.2

67 132KV MEHGAON 12.5MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 400/1 0.2 33KV/110 V 0.2

68 132KV BHIND 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

69 132KV BHIND 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

70 132KV SEONDHA 12.5MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 400/1 1 33KV/110 V 0.5

71 132KV SEONDHA 12.5MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 400/1 0.2 33KV/110 V 0.2

72 132KV SEONDHA 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 400/1 0.2 33KV/110 V 0.2

73 132KV DATIA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

74 132KV DATIA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

75 132KV DABRA 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 400/1 0.5 33KV/110 V 0.5

76 132KV DABRA 12.5MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 400/1 0.2 33KV/110 V 0.2

77 132KV DABRA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

78 132KV MOTIJHEEL 63MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 1200/1 0.5 33KV/110 V 0.5

79 132KV MOTIJHEEL 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

80 132KV MOTIJHEEL 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

81 132KV BANMORE 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 400/1 0.5 33KV/110 V 0.5

82 132KV BANMORE 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

83 132KV TIGRA ROAD 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

84 132KV JORA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

Page 93: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

93

85 132KV AMBAH 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 400/1 0.2 33KV/110 V 0.2

86 132KV AMBAH 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

87 132KV MORAR 63MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 1200/1 0.5 33KV/110 V 0.5

88 132KV SABALGARH 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

89 132KV SABALGARH 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 400/1 0.2 33KV/110 V 0.2

90 132KV MORENA 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 400/1 0.2 33KV/110 V 0.2

91 132KV MORENA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

92 220KV GUNA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

93 220KV GUNA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

94 220KV GUNA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

95 132KV ASHOKNAGAR 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

96 132KV ASHOKNAGAR 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

97 132KV PICHHORE 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 400/1 0.2 33KV/110 V 0.2

98 132KV PICHHORE 12.5MVA 132/66/33KV TRANSFORME 33KV 1 STATIC 0.2 200/1 1 33KV/110 V 0.5

99 132KV PICHHORE 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 400/1 0.2 33KV/110 V 0.2

100 132KV PICHHORE 5MVA 66/33KV TRANSFORMER 33KV 1 STATIC 0.2 100/1 1 33KV/110 V 0.5

101 132KV PICHHORE 5MVA 66/33KV TRANSFORMER 33KV 1 STATIC 0.2 100/1 1 33KV/110 V 0.5

102 132KV SHIVPURI 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.6 33KV/110 V 0.5

103 132KV SHIVPURI 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

104 220KV SHIVPURI 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

105 132KV RAGHOGARH 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 400/1 1 33KV/110 V 0.5

106 132KV RAGHOGARH 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 1 33KV/110 V 0.5

Page 94: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

94

107 132KV KARERA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 1.5

108 132KV SHIVPURKALA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

109 132KV SHIVPURKALA 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 400/1 0.2 33KV/110 V 0.2

110 132KV SHIVPURKALA 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 400/1 0.2 33KV/110 V 0.2

111 132KV LAHAR 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

112 132KV RON 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

113 132KV BHONRA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

114 132KV ARON 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

115 132KV PORSA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110 V 0.5

TOTAL 115

Page 95: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

95

Format-II(a)

Sr.No Power Procurement from(Name of Agency)

Proposed Commercial Agreement (Please Tick)

Power Purchase Agreement Bulk Supply Agreement

Pertains to MPPTCL Jabalpur Nil Nil

Format-II(b)

Attach Draft Commercial Arrangements

Sr.No. Mode of Payment Please tick

As per Cash Flow Mechanism MPSEB is holding all the cash receive by the Discoms & therefore payments are being done by MPSEB itself for the power procured by MPTRADCO on behalf of Discoms.

Page 96: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

96

MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY LMD. BHOPAL

FORMAT-III

DESCRIPTION OF THE PROPOSED AREA

S.NO. PARAMETER UNIT DATA SOURCE

1 Area Sq km 96069 Census data 1991

2 Gross Cropped Area Sq km NA Census data 2011 not received

3 Gross Irrigated area Sq km NA -do-

4 Forest area Sq km NA -do-

5 Population No 18420208 Census data 2011 not received

6 Scheduled Caste/Scheduled Tribe Population No 5153655 Census data 2001

7 Total Population BPL No NA Census data 2011 not received

8 SC/ST Population Below Poverty Line(BPL) No NA Census data 2011 not received

9 Total number of Households No 3146990 Census data 2001

10 No.of Rural Households No 2153893 Census data 2001

11 No.of urban Households No 993097 Census data 2001

12 No.of Households electrified No 1983699 R-15

13 No.of Rural Households electrified No 1044475 R-15

14 No.of Urban Households electrified No 939224 R-15

15 Percentage of Households electrified % 63.03%

16 No.of Districts No 16 MP Govt.Diary. 2010-11

17 No.of Commissioneries No 4 MP Govt.Diary. 2010-11

18 No.of Tehsils No 110 MP Govt.Diary. 2010-11

19 No.of Villages No 15744 Company Data

20 No.of villages electrified ( As per old definition) No 15509 Company Data

21 No of villages electrified ( As per new definition) No 6603 Company Data

Page 97: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

97

MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY LMD. BHOPAL

FORMAT-IV

INFORMATION ABOUT DISTRIBUTION LICENSEE(INCLUDING DEEMED LICENSEE)- MARCH-11 (2010-11)

Category No.of

Consumers Contracted/

Connected load Energy billed

Working Meters

Defective Meters

Consumers Without Meters

Arrears as on

31.3.2011 NO. KW MU NO NO No Rs in lacs

LT

Domestic 1656641 1538966 1753.68 1535012 104636 121629 87093.2

Single point conn. 327058 61787 139.80 0 0 327058 684.57

Non-Domestic 204685 395104 478.55 193350 11335 0 11620.49

Public Water Works/STLT 7388 47001 144.68 6709 679 0 3022.6

Industrial 28043 234808 192.57 26883 1160 0 6257.8

Agricultural & other Agri. 342612 1284022 2539.74 88983 5044 258079 79246.83

Street Lights 2076 18296 78.30 1912 164 0 533.8

Total LT 2568503 3579984 5327.32 1852849 123018 706766 188459.29

HT Railyway Traction 16 265950 704.35 16 0 0 13902.39

Coal Mines 4 10872 33.80 3 1 0 0

Mini Steel Plants 14 32243 133.43 14 0 0 44.53

Cement Factories 0 0 0 0 0 0 1.12

HT Irrigation 30 4468 2.87 30 0 0 118.74

HT Water Works 55 19239 76.95 55 0 0 467.84

Other HT Consumers 1191 400680 1357.78 1183 8 0 16767.83

RE Co Society 4 9612 46.05 4 0 0 644.32

Border Villages 2 180 141.37 2 0 0 459.85

Total HT 1316 743244 2496.6 1307 9 0 31996.62

Grand Total 2569819 4323228 7823.92 1854156 123027 706766 220455.91

Note:- The above datas are taken from the provisional R-15 for the year 2010-11, available on website of MPPTCL, Jabalpur

Page 98: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

98

MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY LMD. BHOPAL

FORMAT-V

INFORMATION ABOUT DISTRIBUTION LICENSEE (INCLUDING DEEMED LICENSEE) (MARCH-2011)

S.N Parameter Unit Data

1 No.of Region No 2

2 No.of Circles No 14

3 No.of Divisions No 49

4 No.of Sub-Divisions No 117

5 No.of Distribution Centres No 299

6 No.of Fuse off call centres No 768

7 Length of 33 KV line ckm 11220.50

8 Length of 11 KV line ckm 64535.01

9 Length of LT Line ckm 101657.75

10 Total No.of 33 KV feeders No 407

11 Total No.of 11 KV feeders No 2580

12 Total No.of 33 KV feeders metered No 407

13 Total No.of 11 KV feeders metered No 2330

14 Total No.of LT feeders metered No 1707

15 Total No.of Transformers with rating of :

Rating No a) 750 KVA/630 KVA 0

b) 630 KVA No 6

c) 500 KVA No 39

d) 400 KVA/400 KVA No 3

e) 315 KVA No 1182

f) 300 KVA

0

g) 250 KVA No 9

h) 200 KVA No 8326

i) 160 kVA No 4

j) 150 KVA No 2

k) 100 KVA No 22281

l) 75 KVA

0

Page 99: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

99

m) 63 KVA No 31616

n) 50 KVA

0

o) 25 KVA No 30655

p) 16 KVA No 385

q) 10 KVA No 3

16 Total number of power transformers No 1256

17 Total number of Distribution transformers No 94511

18 Total number of Distribution transformers metered on either primary or secondary side No 7529

Total Transformation capacity

MVA 5300.00

a) Power Transformer MVA 5298.95

b) Distribution Transformer MVA 7057.67

19 Energy Input MU 11330.20

20 Energy billed MU 7725.16

21 Energy Lost MU 3605.04

22 Amount billed Rs. Lakhs 367613

23 Amount collected Rs Lakhs 335791

24 Percentage Collected % 91%

25 Total Arrears Rs Lakhs 220455.91

a) Arrears<90 days Rs Lakhs 76016.78

b) Arrears between 90-180 days Rs Lakhs 57818.24

c) Arrears > 180 days Rs Lakhs 86620.89

26 No.of HT consumers with Arrears above 10 lakh Rs Lakhs 74

27 No.of LT consumers with Arrears above Rs.50,000/- Rs Lakhs 71429

28 Total Number of technical employees No 1704

a) Total number of non-technical employees No 2146

b) Total number of employees No 11273

Page 100: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

100

Status of Providing Metering

At All Incoming and Outgoing Feeders of 11KV

And Above For Energy Accounting

Page 101: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

101

MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY LMD. BHOPAL

As on 31.03.2011

STATUS OF 33/11 KV METERING INSTALLED FOR ENERGY AUDIT AT THE END OF MAR.'2011 - CENTRAL DISCOM Annexure-A

S. No.

Name of Circle

Status of 33/11KV Sub-

station Details of 33 KV feeder Details of 11 KV feeder

Total No. of

S/s

Total No. of Power X/mer

33 KV feeder Metering Installed

Metering to be provided

Meter/ME found stop/ defective

11 KV feeder Metering Installed

Metering to be provided

Meter/ME found stop/ defective

Total No. of 33KV feeder

No. of Metering

Point Meter M.E. Meter M.E. Meter M.E.

Total No. of 11KV feeder

No. of Metering

Point Meter M.E. Meter M.E. Meter M.E.

1 CITY BHOPAL 56 110 40 189 179 179 10 10 0 7 205 231 231 231 0 0 1 1

2 O&M BHOPAL 110 166 54 169 155 150 14 19 12 33 321 356 290 288 66 68 58 93

3 VIDISHA 42 63 16 60 52 52 8 8 4 9 155 168 147 147 21 21 18 32

4 RAJGARH 64 97 34 89 88 88 1 1 13 19 236 250 197 197 53 53 34 82

5 SEHORE 53 77 20 74 71 71 3 3 9 10 155 168 143 148 25 20 13 14

6 BETUL 41 74 21 89 89 89 0 0 2 2 155 189 179 179 10 10 3 5

7 HOSHANGABAD 66 122 38 113 98 98 15 15 8 29 246 257 203 203 54 54 6 80

BHOPAL REGION 432 709 223 783 732 727 51 56 48 109 1473 1619 1390 1393 219 226 133 307

8 CITY GWALIOR 32 74 30 51 51 51 0 0 0 2 131 131 131 131 0 0 0 2

9 O&M GWALIOR 73 113 21 95 89 89 6 6 0 3 229 246 191 191 55 55 2 47

10 MORENA 35 66 29 45 43 43 2 2 1 5 118 120 109 99 11 21 13 17

11 BHIND 35 59 17 35 28 28 4 7 8 19 119 105 90 93 15 12 37 50

12 SHIVPURI 70 119 31 87 77 77 10 10 7 10 224 224 106 106 118 118 0 32

13 GUNA 80 126 44 112 102 102 10 10 1 6 292 292 229 229 63 63 13 96

GWALIOR REGION

325 547 172 425 390 390 32 35 17 45 1113 1118 856 849 262 269 65 244

CENTRAL DISCOM

757 1256 395 1208 1122 1117 83 91 65 154 2596 2737 2246 2242 481 495 198 551

Page 102: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

102

Projection of Category Wise Sales

Page 103: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

103

MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY LMD. BHOPAL

PROJECTION OF CATEGORY-WISE SALES Annexure-B

S.No. Sales in MU Actuals Estimates

2008-09 2009-10 2010-11 2011-2012 2012-2013 2013-2014 2014-2015

1 2 3 4 5 6 7 8 9

LT

LV-1 DOMESTIC 1598.51 1599.45 1893.48 2643 2988 3319 3700

LV-2 NON-DOMESTIC 409.57 409.92 478.54 526 607 712 849

LV-3 P.W.W. & STREET LIGHT 162.08 180.71 222.98 224 250 279 311

LV-4 INDUSTRIAL 169.27 182.69 192.57 213 230 249 268

LV-5 AGRICULTURE 2219.27 2319.62 2539.74 2851 3162 3507 3890

HT

HV-1 RAILWAY TRACTION 666.53 677.63 704.35 713 731 750 769

HV-2 COAL MINES 33.47 32.59 33.80 34 35 36 37

HV-3 INDUSTRIAL & NON – INDUS. 1234.92 1325.68 1536.01 1551 1678 1815 1964

HV-4 SEASONAL 1.56 1.05 1.24 1.05 1.05 1.05 1.05

HV-5 IRR.& WATER WORKS 76.22 77.34 79.82 79 80 81 82

HV-6 BULK RESIDENCIAL 130.78 125.65 141.37 147 154 160 168

HV-7 BULK SUPPLY TO EXM. 0 0 0 0 0 0 0

TOTAL 6705.02 6850.53 7725.16 8982.05 9916.05 10909.05 12039.05

INPUT (MU) 10978.64 10563.06 11330.20 12651 13400 14354 15435

DISTRIBUTION LOSS 38.93 35.15 31.82 29 26 24 22

Note 1. The figures for the year 2008-09 have been taken from the yearly R-15 available on the website.

2. The figures of input have been taken from Energy Audit section.

3. The figures are rounded off to the nearest integers.

4. The loss level trajectory from the year 2009-10 to 2012-13 have been taken as per affidavit submitted

by GoMP Energy department to MPERC.

5. The loss levels for FY14 & FY15 are assumptions.

Page 104: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

104

Projection of Monthly

Unrestricted and Restricted

Maximum Demand in

MW for Next Five Years.

Page 105: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

105

MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY LMD. BHOPAL Month wise projection of total demand in M.W. (Restricted & Un-Restricted)

Sl.No. Month Max.Demand in MW (Rest.) Max.Demand in MW (Un-Rest.)

10-11 11-12 12-13 13-14 14-15 10-11 11-12 12-13 13-14 14-15

1 April 2003 1976 2101 2447 2643 2120 2200 2470 2670 2880

2 May 1919 1762 1870 2223 2401 1920 2272 2240 2420 2620

3 June 1772 1724 1847 2253 2433 1840 2033 2150 2320 2510

4 July 1888 2099 2439 2705 2922 2170 2340 2530 2740 2950

5 August 1542 1651 1972 2203 2380 1770 1920 2070 2230 2410

6 September 1799 1930 2295 2531 2735 2070 2230 2410 2610 2810

7 October 2057 2225 2452 2600 2807 2370 2550 2760 2980 3220

8 November 2408 2506 2660 2890 3039 2770 2990 3230 3490 3770

9 December 2219 2291 2417 2635 2863 2550 2760 2980 3210 3470

10 January 2312 2408 2618 2840 2984 2660 2870 3100 3350 3620

11 February 2533 2002 2196 2285 2597 2843 2460 2660 2870 3100

12 March 2546 1929 1994 2171 2360 2629 2240 2410 2610 2820

Page 106: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

106

Failure of DTR

During Year Ending March‟11

Page 107: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

107

Madhya Kshetra Vidyut Vitran Company Limited Distribution Transformer Failure

URBAN

Annexure-D

Year-2010-11

S.N.

Circle

No of Transformers installed at

the beginning of

quarter

No of Transformers

servicing predominantly

agricultural consumers

Defective Trans. Start of Year

Trans. Failed

during the Year

2010-11 (No)

Trans. Replaced/repaired during

the Year 2010-11 (No)

Defective Trans. at end of the Year

Percentage of

transformers replaced

within 2 days

No. % of total No.

(5+7-8=9)

% of total

1 2 3 4 5 6 7 8 9 10 11

1 BPL City 5753 37 2 0 52 41 0 0 78.85

2 BPL(O&M) 998 1012 0 0.20 80 73 4 0.40 89.02

3 Vidisha 506 56 0 0 6 27 0 0 100.00

4 Sehore 280 2 0 0 28 20 0 0 100.00

5 Rajgarh 430 48 0 0 50 43 0 0 100.00

6 Hos'bad 842 13 0 0 51 52 0 0 101.96

7 Betul 506 49 0 0 25 32 0 0 100.00

Total Bpl Region 9315 1217 2 0.20 292 288 4 0.40 97.96%

8 Gwalior

City 4086 0 171 4.19% 381 367 185 4.53% 66.94%

9 Gwalior (O&M)

720 201 55 7.64% 153 155 53 7.36% 74.52%

10 Guna 594 39 0 0.00% 64 58 6 1.01% 90.63%

11 Shivpuri 1235 162 187 15.14% 307 222 272 22.02% 44.94%

12 Morena 1227 85 22 1.79% 370 338 54 4.40% 86.22%

13 Bhind 1518 173 29 1.91% 477 475 31 2.04% 93.87%

Total Gwl. Region

9380 660 464 4.95% 1752 1615 601 6.41% 72.88%

Total CZ 18695 1877 466 2.49% 2044 1903 605 3.23% 75.81%

Page 108: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

108

Madhya Kshetra Vidyut Vitran Company Limited

Annexure-D

Distribution Transformer Failure

RURAL Yearly 01.04.10 to 31.03.11

S.N.

Circle

No of Transformers installed at

the beginning of

quarter

No of Transformers

servicing predominantly

agricultural consumers

Defective Trans. Start of Year Trans.

Failed during the Year 2010-

11 (No)

Trans. Replaced/repaired during

the Year 2010-11 (No)

Defective Trans. at end of the Year

Percentage of transformers

replaced within 2 days

No. % of total No.

(5+7-8=9)

% of total

1 BPL City 0 0 0 0 0 0 0 0 0

2 BPL (O&M) 8519 8080 50 0.62 1923 1909 14 0.16 96.76

3 Vidisha 3642 3162 38 1.10 858 8/10 48 1.32 90.40

4 Sehore 8464 4014 104 2.21 927 888 39 0.80 86.13

5 Rajgarh 6854 5086 212 3.30 807 616 191 2.79 60.45

6 Hos'bad 6682 5441 42 0.65 1372 1362 10 0.15 96.32

7 Betul 4521 998 84 2.04 832 832 0 0 90.83

Total Bpl Region 35082 26781 530 1.51 6719 6417 302 0.86 88.52

8 Gwl. City 0 0 0 0.00 0 0 0 0.00 0.00

9 Gwalior (O&M)

5524 3497 371 6.72 831 798 404 7.31% 66.39

10 Guna 9344 8124 270 2.89 741 693 318 3.40% 68.55

11 Shivpuri 9286 9286 988 10.64 824 786 1026 11.05% 43.38

12 Morena 7189 5751 330 4.59 505 519 316 4.40% 62.16

13 Bhind 5782 5284 249 4.31 335 337 247 4.27% 57.91

Total Gwl. Region 37125 31942 2208 5.95 3236 3133 2311 6.22% 57.55

Total CZ 72207 58723 2738 3.79 9955 9550 2613 3.62% 61.01

Page 109: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

109

Failure of Power Transformers

During Year Ending March‟11

Page 110: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

110

M.P.MADHYA KSHETRA VIDYUT VITARAN CO.LTD.,BHOPAL

REPORT OF FAILURE /REPLACEMENT OF POWER TRANSFORMER DURING THE YEAR 2010-11 Annexure-E

X'mer in Service No. of Xmer failed 2010-11 % Fail. 2010-11

1 Bhopal City 110 0 0

2 Bhopal (O&M) 166 5 3.01

3 Vidisha 63 0 0

4 Sehore 77 1 1.29

5 Rajgarh 97 2 2.06

6 Hos'bad 122 0 0

7 Betul 74 0 0

Total Bpl Region 709 8 1.13

8 Gwalior City 74 5 6.76

9 Gwalior (O&M) 113 6 5.31

10 Guna 126 1 0.79

11 Shivpuri 119 11 9.24

12 Morena 66 6 9.09

13 Bhind 59 9 15.25

Total Gwl. Region 547 38 6.95

Total CZ 1256 46 3.66

Page 111: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

111

Reliability Index for DHQs

For year ending March‟11

Page 112: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

112

Annexure-F

MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY LTD. BHOPAL.

REPORT OF OUTAGES OF 11 KV FEEDERS

Month -March'2011

FINANCIAL YEAR- 2010-11

Utility - MPMKVVCL BHOPAL

S.No.

Town Type of

Town

No. of feeder on last day of

the month

Total No. of

Outages of

feeders during

the month

Total Duration

of Outages

of of feeders

during the month (in Minutes)

Cumulative No. of

Outages w.e.f. 1st

April till the last day of the month

Cumalative Duration of

Outages w.e.f. 1st

April till the last day of the month

(in Minutes)

Monthly Average No. of

Outages of

feeders (Col.

5/Col.4)

Monthly Average Duration

of Outages

of feeders(in Minutes)

(Col. 6/Col.4)

Monthly Feeder

Reliability index (%)

Cumulative Average No. of

Outages of Feeders

(Col 7/Col.4)

Cumulative Average

Duration of Outages of

feeders (in Minutes) (Col.8/Col.4)

Cumulative Feeder

Reliability index**(%)

1 2 3 4 5 6 7 8 9 10 11 12 13 14

1 Bhopal SC 213 2283 34250.40 14943 495007.80 10.72 160.00 99.64 70.15 2323.98 99.56

2 Raisen DH 3 11 927.00 141 6870.60 3.67 309.00 99.31 47.00 2290.20 99.56

3 Vidisha DH 16 47 1017.60 542 13500.00 2.94 63.60 99.86 33.88 843.75 99.84

4 Sehore DH 11 55 1234.20 637 16634.40 5.00 112.20 99.75 57.91 1512.22 99.71

5 Rajgarh DH 2 4 190.80 64 1782.00 2.00 95.40 99.79 32.00 891.00 99.83

6 Hoshanbad DH 9 33 3364.20 476 37392.00 3.67 373.80 99.16 52.89 4154.67 99.21

7 Harda DH 5 46 1143.00 384 11961.00 9.20 228.60 99.49 76.80 2392.20 99.54

8 Betul DH 8 62 1344.00 1237 36168.60 7.75 168.00 99.62 154.63 4521.08 99.14

9 Gwalior DH 121 966 49080 10534 549300 7.98 405.60 99.09 87.05 4539.66 99.13

10 Morena DH 15 124 6720 2334 102900 8.26 448.00 99.37 155.60 6860.00 98.69

11 Bhind DH 11 95 4200 545 43560 8.63 381.81 99.14 49.54 3960.00 99.24

12 Sheopur DH 6 26 2400 246 17238 4.33 400.00 99.10 41.00 2873 99.45

13 Datia DH 11 37 7440 701 86763 3.36 676.36 98.48 63.72 7887.54 98.49

14 Shivpuri DH 15 48 4980 659 65604 3.20 332.00 99.26 43.93 4373.60 99.16

15 Guna DH 13 94 3900 1729 60761 7.23 300.00 99.33 133.00 4669.30 99.11

16 Ashoknagar DH 3 112 1320 996 10776 37.33 440.00 99.01 332.00 3592.00 99.31

Page 113: MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY … Folders... · -1- madhya pradesh madhya kshetra vidyut vitaran company ltd. bhopal annual regulatory compliance report for

113


Top Related