Download - RESUME Dharma Trioko Sianturi
Dharma Sianturi Resume 1 of 8
DHARMA SIANTURI RESUME
PERSONAL DETAILS
Full Name: Dharma Trioko Sianturi
Place/Date of Birth: Medan, October 14, 1979
Gender: Male
Marital Status: Married
Religion: Christian
Contact Address: Lot 7219, Jalan Jaya Negara, Kg. Pandan.
Kuala Belait [KA 1189], Brunei Darussalam
Permanent
Address: Jalan Swadaya Raya No.15 Bambu Apus,
Cipayung, Jakarta.
Mobile Phone: +673 – 7149 683
E-mail address: [email protected]
ADDITIONAL INFORMATION
Specialization : Construction and Installation of Offshore Structure
Years of Experience : 11 Years
Nationality : Indonesian
Present Location : Brunei Darussalam
Dharma Sianturi Resume 2 of 8
SELF DESCRIPTION & QUALIFICATION
I consider myself as a high motivated person who is able to work in a team or let alone
unsupervised. I am also a hard worker and fast learner that always eager to learn something new and
challenging because it makes me to do my best.
As a degree on mechanical engineering & project management, I have been working for more
than 10 years. Having experience on International Project, make me fluent in English, proficient
knowledge of project engineering processes & procedures, and familiar with International codes &
standards. I also used to work on a remote area, especially offshore.
For the first 7 years of my experience, I am working for EPC companies as detailed below, for
offshore projects. With those experiences, I can provide the required services expected to run a
project, especially EPC project.
Currently, I am working for Brownfield project inside BSP (onshore & offshore) plant and
BLNG (onshore) Plant. It is about upgrading the plant to fulfill the recent requirement. By having this
particular experience, I got more knowledge on Brownfield area, especially construction inside a
Plant, with different challenge compare to Greenfield project.
EDUCATIONAL BACKGROUND
2006 – 2008 Master Degree from Civil Engineering Department of Indonesia University majoring
in Project Management
1997 – 2004 Engineering Degree from Mechanical Engineering of Bandung Institute of
Technology specializes in Design and Construction
COMPUTER SOFTWARE KNOWLEDGE
OFFPIPE
STAAD Pro
Auto CAD
Microsoft project
Microsoft office word
Microsoft office excel
Microsoft office power point
Dharma Sianturi Resume 3 of 8
WORKING EXPERIENCES
1) PETROKON UTAMA SENDIRIAN BERHAD [January 2013 – now]
Project 1. LPG Pump Replacement Project
2. OCP Train Rejuvenation Project
3. Electrical Distribution Upgrade Project
4. Pipeline PIG receiver modification Project
5. AMPA Slug Catcher Upgrade Project
6. Instrument Air and Nitrogen plant upgrade Project
7. SCOT Tank Blanketing Project
8. Pipeline Replacement Project – 5 (onshore)
9. Constructability Study on Job-carding
Main Business Multi discipline engineering consultancy to provide design engineering
and project management services to the oil & gas, petrochemical, and
building industries
Client Project Owner: Brunei Liquid Natural Gas (BLNG)
Project Owner: Brunei Shell Petroleum (BSP)
Position Senior Construction Engineer
Lifting Coordinator
Responsibilities Determine Construction Engineering Study work-load / man-hours
Provide input during feasibility study stage
Perform Constructability Study during Conceptual and Detail design
phase
Develop Lifting Study and Lifting Plan for Crane & Rigging selection
and approaching arrangement
Develop work method of statement to overcome any constructability
concerns
Provide Guidance for Installation Contractor to execute the project
safely
Provide input for Construction HAZID prior to construction phase
execution
Dharma Sianturi Resume 4 of 8
2) PT. RAJAWALI SWIBER CAKRAWALA [July 2012 – January 2013]
3) LEIGHTON OFFSHORE PTE. LTD. [March 2012 – May 2012]
Project PIPELINE INSTALLATION AND TESTING FOR RUBY FIELD
DEVELOPMENT PROJECT
Client Project Owner: PEARL OIL (SEBUKU) LTD.
Main Contractor: PT. MEINDO ELANG INDAH
Position Project Engineer
Responsibilities Execution Phase
Producing & reviewing relevant engineering documents (such as
Pipeline Start-up procedure, Pipeline laydown procedure and Subsea
spool installation procedure along with its integrity calculation during
lifting) prior to execution.
Preparing project execution material and installation aid (such as
required slings and shackle size & capacity, chain & lever hoist, tugger
winch, etc.)
Developing method of statement (such as Pipeline Start-up, Pipeline
laydown and Subsea spool installation) for any critical installation
activities for on-deck crew reference.
Developing Lifting Study and Lift Plan for Crane and Rigging
selection/confirmation and approaching arrangement.
Develop Job Hazard Analysis related to any non-routine lifting and
develop all stake holders awareness
Carry-out briefing to all key personnel executing the installation
offshore regarding Method of Statement and JHA.
Supervising subsea pipeline installation.
Supervising sub-sea spool installation.
Supervising SSIV installation.
Project TANZANIA SPM & PIPELINES REPLACEMENT EPC PROJECT [2012]
Client TANZANIA PORT AUTHORITY
Position Field Engineer
Responsibilities Execution Phase
Dharma Sianturi Resume 5 of 8
4) LEIGHTON OFFSHORE PTE. LTD. – Dubai Branch [March 2011 – Feb. 2012]
Reviewing relevant engineering documents prior to execution.
Preparing project execution material and installation aid (such as
required slings and shackle size & capacity, chain & lever hoist, tugger
winch, etc.)
Developing method of statement (such as Pipeline Start-up, Pipeline
laydown and Subsea spool installation) for any critical installation
activities for on-deck crew reference.
Developing Lifting Study and Lift Plan for Crane and Rigging
selection/confirmation and approaching arrangement.
Develop Job Hazard Analysis related to any non-routine lifting and
develop all stake holders awareness
Carry-out briefing to all key personnel executing the installation
offshore regarding Method of Statement and JHA.
Supervising subsea pipeline installation.
Supervising Beach-Pull operation.
Supervising sub-sea spool installation.
Supervising SPM (Single Point Mooring) Buoy & PLEM (Pipeline End
Manifold) installation.
Project IRAQ CRUDE OIL EXPORT EXPANSION PROJECT PHASE-1 [2011-
2012]
Client SOUTH OIL COMPANY
Position Field Engineer
Responsibilities Execution Phase
Reviewing relevant engineering documents prior to execution
documents preparation.
Preparing project execution material and installation aid.
Assisting Offshore Installation Manager (in coordination) on the job
site.
Developing method of statement (such as Pipeline Start-up, Pipeline
laydown and Subsea spool installation) for any critical installation
activities for on-deck crew reference.
Developing Lifting Study and Lift Plan for Crane and Rigging
Dharma Sianturi Resume 6 of 8
5) SIGUR ROS SDN BHD [July 2009 – March 2011]
selection/confirmation and approaching arrangement.
Develop Job Hazard Analysis related to any non-routine lifting and
develop all stake holders awareness
Carry-out briefing to all key personnel executing the installation
offshore regarding Method of Statement and JHA.
Supervising subsea pipeline installation.
Supervising Beach-Pull operation.
Supervising Mid-Point (above water) tie-in.
Supervising sub-sea spool installation.
Supervising SPM & PLEM installation.
Directly in-charge for cable riser (J-Tube) installation.
Project TURKMENISTAN BLOCK 1 GAS DEVELOPMENT PROJECT,
INSTALLATION & PRE-COMMISSIONING OF OFFSHORE PIPELINE
SYSTEMS PACKAGE [2009 - 2011]
Client Project Owner: PETRONAS CARIGALI (TURKMENISTAN) SENDIRIAN
BERHAD
Main Contractor: JV MMHE - TECHNIP
Position Field/Pipeline Engineer
Responsibilities Execution Phase
Producing & reviewing relevant engineering documents (such as
Pipeline Start-up procedure, Pipeline laydown procedure and Subsea
spool installation procedure along with its integrity calculation during
lifting) prior to execution.
Preparing project execution material and installation aid (such as
required slings and shackle size & capacity, chain & lever hoist, tugger
winch, etc.)
Developing method of statement (such as Pipeline Start-up, Pipeline
laydown and Subsea spool installation) for any critical installation
activities for on-deck crew reference.
Developing Lifting Study and Lift Plan for Crane and Rigging
selection/confirmation and approaching arrangement.
Develop Job Hazard Analysis related to any non-routine lifting and
Dharma Sianturi Resume 7 of 8
6) PT SEATECH BERJAYA [January 2009 – June 2009]
develop all stake holders awareness
Carry-out briefing to all key personnel executing the installation
offshore regarding Method of Statement and JHA.
Assisting Project Manager (in coordination) on the job site.
Supervising SPM and PLEM installation.
Preparing and supervising subsea spool installation.
Designing and Supervising Flexmat anchor block fabrication.
Supervising Flexmat Anchor block installation.
Project KAMBUNA OFFSHORE TOPSIDE, RISER, AND PIPELINE
INSTALLATION [2009]
Client Project Owner: ASIA PETROLEUM DEVELOPMENT (GLAGAH
KAMBUNA) LIMITED
Main Contractor: PT. TIMAS SUPLINDO
Position Field/Diving Engineer
Responsibilities Execution Phase
Producing & reviewing relevant engineering documents (Subsea spool
installation procedure along with its integrity calculation during lifting)
prior to execution.
Preparing project execution material and installation aid (such as
required slings and shackle size & capacity, chain & lever hoist, tugger
winch, etc.)
Developing method of statement (Subsea spool installation) for any
critical installation activities for on-deck crew reference.
Preparing project execution material and installation aid.
Assisting Project Manager (in coordination) on the job site.
Supervising subsea spool installation.
Supervising riser installation.
Supervising concrete mattress installation.
Dharma Sianturi Resume 8 of 8
7) PT MERLASAKTI ABADI [May 2005 - December 2008]
Project OFFSHORE EPCI SERVICES FOR WEST MADURA AND POLENG
FIELDS [2007 – 2008]
Client KODECO
Position Field Engineer
Responsibilities Bidding Phase
Coordinating preparation of pre-bid proposal.
Coordinating preparation of tender documents.
Attending elucidation (bid clarification) meeting with client.
Attending site visit.
Attending bid opening (administrative & technical proposal, and
commercial proposal).
Execution Phase
Producing & reviewing relevant engineering documents (such as
Pipeline Start-up procedure, Pipeline laydown procedure and Subsea
spool installation procedure along with its integrity calculation during
lifting) prior to execution.
Preparing project execution material and installation aid (such as
required slings and shackle size & capacity, chain & lever hoist, tugger
winch, etc.)
Developing method of statement (such as Pipeline Start-up, Pipeline
laydown and Subsea spool installation) for any critical installation
activities for on-deck crew reference.
Assisting Project Manager (in coordination) on the job site.
Supervising Jacket and Platform Installation.
Supervising pipeline installation.
Supervising subsea spool installation.