DHARMA SIANTURI RESUME

PERSONAL DETAILS

Full Name: Dharma Trioko Sianturi

Place/Date of Birth: Medan, October 14, 1979

Gender: Male

Marital Status: Married

Religion: Christian

Contact Address: Lot 7219, Jalan Jaya Negara, Kg. Pandan.

Kuala Belait [KA 1189], Brunei Darussalam

Permanent

Address: Jalan Swadaya Raya No.15 Bambu Apus,

Cipayung, Jakarta.

Mobile Phone: +673 – 7149 683

E-mail address: [email protected]

[email protected]

[email protected]

ADDITIONAL INFORMATION

Specialization : Construction and Installation of Offshore Structure

Years of Experience : 11 Years

Nationality : Indonesian

Present Location : Brunei Darussalam

Page 2: RESUME Dharma Trioko Sianturi

Dharma Sianturi Resume 2 of 8

SELF DESCRIPTION & QUALIFICATION

I consider myself as a high motivated person who is able to work in a team or let alone

unsupervised. I am also a hard worker and fast learner that always eager to learn something new and

challenging because it makes me to do my best.

As a degree on mechanical engineering & project management, I have been working for more

than 10 years. Having experience on International Project, make me fluent in English, proficient

knowledge of project engineering processes & procedures, and familiar with International codes &

standards. I also used to work on a remote area, especially offshore.

For the first 7 years of my experience, I am working for EPC companies as detailed below, for

offshore projects. With those experiences, I can provide the required services expected to run a

project, especially EPC project.

Currently, I am working for Brownfield project inside BSP (onshore & offshore) plant and

BLNG (onshore) Plant. It is about upgrading the plant to fulfill the recent requirement. By having this

particular experience, I got more knowledge on Brownfield area, especially construction inside a

Plant, with different challenge compare to Greenfield project.

EDUCATIONAL BACKGROUND

2006 – 2008 Master Degree from Civil Engineering Department of Indonesia University majoring

in Project Management

1997 – 2004 Engineering Degree from Mechanical Engineering of Bandung Institute of

Technology specializes in Design and Construction

COMPUTER SOFTWARE KNOWLEDGE

OFFPIPE

STAAD Pro

Auto CAD

Microsoft project

Microsoft office word

Microsoft office excel

Microsoft office power point

Page 3: RESUME Dharma Trioko Sianturi

Dharma Sianturi Resume 3 of 8

WORKING EXPERIENCES

1) PETROKON UTAMA SENDIRIAN BERHAD [January 2013 – now]

Project 1. LPG Pump Replacement Project

2. OCP Train Rejuvenation Project

3. Electrical Distribution Upgrade Project

4. Pipeline PIG receiver modification Project

5. AMPA Slug Catcher Upgrade Project

6. Instrument Air and Nitrogen plant upgrade Project

7. SCOT Tank Blanketing Project

8. Pipeline Replacement Project – 5 (onshore)

9. Constructability Study on Job-carding

Main Business Multi discipline engineering consultancy to provide design engineering

and project management services to the oil & gas, petrochemical, and

building industries

Client Project Owner: Brunei Liquid Natural Gas (BLNG)

Project Owner: Brunei Shell Petroleum (BSP)

Position Senior Construction Engineer

Lifting Coordinator

Responsibilities Determine Construction Engineering Study work-load / man-hours

Provide input during feasibility study stage

Perform Constructability Study during Conceptual and Detail design

phase

Develop Lifting Study and Lifting Plan for Crane & Rigging selection

and approaching arrangement

Develop work method of statement to overcome any constructability

concerns

Provide Guidance for Installation Contractor to execute the project

safely

Provide input for Construction HAZID prior to construction phase

execution

Page 4: RESUME Dharma Trioko Sianturi

Dharma Sianturi Resume 4 of 8

2) PT. RAJAWALI SWIBER CAKRAWALA [July 2012 – January 2013]

3) LEIGHTON OFFSHORE PTE. LTD. [March 2012 – May 2012]

Project PIPELINE INSTALLATION AND TESTING FOR RUBY FIELD

DEVELOPMENT PROJECT

Client Project Owner: PEARL OIL (SEBUKU) LTD.

Main Contractor: PT. MEINDO ELANG INDAH

Position Project Engineer

Responsibilities Execution Phase

Producing & reviewing relevant engineering documents (such as

Pipeline Start-up procedure, Pipeline laydown procedure and Subsea

spool installation procedure along with its integrity calculation during

lifting) prior to execution.

Preparing project execution material and installation aid (such as

required slings and shackle size & capacity, chain & lever hoist, tugger

winch, etc.)

Developing method of statement (such as Pipeline Start-up, Pipeline

laydown and Subsea spool installation) for any critical installation

activities for on-deck crew reference.

Developing Lifting Study and Lift Plan for Crane and Rigging

selection/confirmation and approaching arrangement.

Develop Job Hazard Analysis related to any non-routine lifting and

develop all stake holders awareness

Carry-out briefing to all key personnel executing the installation

offshore regarding Method of Statement and JHA.

Supervising subsea pipeline installation.

Supervising sub-sea spool installation.

Supervising SSIV installation.

Project TANZANIA SPM & PIPELINES REPLACEMENT EPC PROJECT [2012]

Client TANZANIA PORT AUTHORITY

Position Field Engineer

Responsibilities Execution Phase

Page 5: RESUME Dharma Trioko Sianturi

Dharma Sianturi Resume 5 of 8

4) LEIGHTON OFFSHORE PTE. LTD. – Dubai Branch [March 2011 – Feb. 2012]

Reviewing relevant engineering documents prior to execution.

Preparing project execution material and installation aid (such as

required slings and shackle size & capacity, chain & lever hoist, tugger

winch, etc.)

Developing method of statement (such as Pipeline Start-up, Pipeline

laydown and Subsea spool installation) for any critical installation

activities for on-deck crew reference.

Developing Lifting Study and Lift Plan for Crane and Rigging

selection/confirmation and approaching arrangement.

Develop Job Hazard Analysis related to any non-routine lifting and

develop all stake holders awareness

Carry-out briefing to all key personnel executing the installation

offshore regarding Method of Statement and JHA.

Supervising subsea pipeline installation.

Supervising Beach-Pull operation.

Supervising sub-sea spool installation.

Supervising SPM (Single Point Mooring) Buoy & PLEM (Pipeline End

Manifold) installation.

Project IRAQ CRUDE OIL EXPORT EXPANSION PROJECT PHASE-1 [2011-

2012]

Client SOUTH OIL COMPANY

Position Field Engineer

Responsibilities Execution Phase

Reviewing relevant engineering documents prior to execution

documents preparation.

Preparing project execution material and installation aid.

Assisting Offshore Installation Manager (in coordination) on the job

site.

Developing method of statement (such as Pipeline Start-up, Pipeline

laydown and Subsea spool installation) for any critical installation

activities for on-deck crew reference.

Developing Lifting Study and Lift Plan for Crane and Rigging

Page 6: RESUME Dharma Trioko Sianturi

Dharma Sianturi Resume 6 of 8

5) SIGUR ROS SDN BHD [July 2009 – March 2011]

selection/confirmation and approaching arrangement.

Develop Job Hazard Analysis related to any non-routine lifting and

develop all stake holders awareness

Carry-out briefing to all key personnel executing the installation

offshore regarding Method of Statement and JHA.

Supervising subsea pipeline installation.

Supervising Beach-Pull operation.

Supervising Mid-Point (above water) tie-in.

Supervising sub-sea spool installation.

Supervising SPM & PLEM installation.

Directly in-charge for cable riser (J-Tube) installation.

Project TURKMENISTAN BLOCK 1 GAS DEVELOPMENT PROJECT,

INSTALLATION & PRE-COMMISSIONING OF OFFSHORE PIPELINE

SYSTEMS PACKAGE [2009 - 2011]

Client Project Owner: PETRONAS CARIGALI (TURKMENISTAN) SENDIRIAN

BERHAD

Main Contractor: JV MMHE - TECHNIP

Position Field/Pipeline Engineer

Responsibilities Execution Phase

Producing & reviewing relevant engineering documents (such as

Pipeline Start-up procedure, Pipeline laydown procedure and Subsea

spool installation procedure along with its integrity calculation during

lifting) prior to execution.

Preparing project execution material and installation aid (such as

required slings and shackle size & capacity, chain & lever hoist, tugger

winch, etc.)

Developing method of statement (such as Pipeline Start-up, Pipeline

laydown and Subsea spool installation) for any critical installation

activities for on-deck crew reference.

Developing Lifting Study and Lift Plan for Crane and Rigging

selection/confirmation and approaching arrangement.

Develop Job Hazard Analysis related to any non-routine lifting and

Page 7: RESUME Dharma Trioko Sianturi

Dharma Sianturi Resume 7 of 8

6) PT SEATECH BERJAYA [January 2009 – June 2009]

develop all stake holders awareness

Carry-out briefing to all key personnel executing the installation

offshore regarding Method of Statement and JHA.

Assisting Project Manager (in coordination) on the job site.

Supervising SPM and PLEM installation.

Preparing and supervising subsea spool installation.

Designing and Supervising Flexmat anchor block fabrication.

Supervising Flexmat Anchor block installation.

Project KAMBUNA OFFSHORE TOPSIDE, RISER, AND PIPELINE

INSTALLATION [2009]

Client Project Owner: ASIA PETROLEUM DEVELOPMENT (GLAGAH

KAMBUNA) LIMITED

Main Contractor: PT. TIMAS SUPLINDO

Position Field/Diving Engineer

Responsibilities Execution Phase

Producing & reviewing relevant engineering documents (Subsea spool

installation procedure along with its integrity calculation during lifting)

prior to execution.

Preparing project execution material and installation aid (such as

required slings and shackle size & capacity, chain & lever hoist, tugger

winch, etc.)

Developing method of statement (Subsea spool installation) for any

critical installation activities for on-deck crew reference.

Preparing project execution material and installation aid.

Assisting Project Manager (in coordination) on the job site.

Supervising subsea spool installation.

Supervising riser installation.

Supervising concrete mattress installation.

Page 8: RESUME Dharma Trioko Sianturi

Dharma Sianturi Resume 8 of 8

7) PT MERLASAKTI ABADI [May 2005 - December 2008]

Project OFFSHORE EPCI SERVICES FOR WEST MADURA AND POLENG

FIELDS [2007 – 2008]

Client KODECO

Position Field Engineer

Responsibilities Bidding Phase

Coordinating preparation of pre-bid proposal.

Coordinating preparation of tender documents.

Attending elucidation (bid clarification) meeting with client.

Attending site visit.

Attending bid opening (administrative & technical proposal, and

commercial proposal).

Execution Phase

Producing & reviewing relevant engineering documents (such as

Pipeline Start-up procedure, Pipeline laydown procedure and Subsea

spool installation procedure along with its integrity calculation during

lifting) prior to execution.

Preparing project execution material and installation aid (such as

required slings and shackle size & capacity, chain & lever hoist, tugger

winch, etc.)

Developing method of statement (such as Pipeline Start-up, Pipeline

laydown and Subsea spool installation) for any critical installation

activities for on-deck crew reference.

Assisting Project Manager (in coordination) on the job site.

Supervising Jacket and Platform Installation.

Supervising pipeline installation.

Supervising subsea spool installation.