    SPECIFICATIONS:

    Room space

    Verandah

    Wall height

    Gabble height

    Pillar dimension = 8 nos.

    = 2 nos.

    Verandah pillar = 4 nos.

    Brick wall thicknessOutside plastering

    Inside plastering

    Reinforced concrete pillar

    Roof

    Plinth height above ground

    Floor

    GI sheet door

    CENTER LINE:

    Phadi 123'- 4"

    Verandah 45'-10"

    13'- 8"

    182'-10"

    No Length Breadth Height Total

    1. Layout, demarcation and cleaning, etc. Rs. 2,00

    2.

    Phadi C/L 1 x 123' 4" x 3' 0" x 3' 0" = 1110.00 Cft

    VerandahC/L 1 x 59' 6" x 1' 6" x 2' 0" = 178.50 Cft

    Extra for verandah pillar 4 x 2' 0" x 2' 0" x 2' 6" = 40.00 Cft

    Steps 1 x 6' 0" x 1' 3" x 0' 4" = 2.50 Cft

    1331.00 Cft

    Deduction

    Overlapping for Pillar 4 x 2' 0" x 1' 6" x 2' 0" = 24.00 Cft

    Net volume 1307.00 Cft

    37.00 Cum 78.95@ Rs. 2,9Rs.

    3.

    Phadi C/L 1 x 123' 4" x 3' 0" x 0' 4" = 123.33 Cft

    1st footing 1 x 123' 4" x 0' 6" x 0' 10" = 51.39 Cft

    2nd footing 1 x 123' 4" x 1' 0" x 0' 9" = 92.50 Cft

    3rd footing 1 x 123' 4" x 1' 6" x 0' 9" = 138.75 Cft

    Verandah C/L 1 x 59' 6" x 1' 6" x 0' 4" = 29.75 Cft

    Verandah pillar 1 x 2' 0" x 2' 0" x 0' 4" = 1.33 Cft

    Room 1 x 44' 7" x 14' 7" x 0' 9" = 487.63 Cft

    Verandah floor 1 x 44' 7" x 5' 7" x 0' 9" = 186.69 Cft

    1111.38 Cft

    31.47 Cum 256.51@ Rs. 8,0Rs.

    4.

    Phadi C/L 1 x 123' 4" x 3' 0" x 0' 4" = 123.33 Cft

    Verandah pillar 4 x 2' 0" x 2' 0" x 0' 4" = 5.33 Cft

    Steps 1 x 6' 0" x 1' 6" x 0' 4" = 3.00 Cft

    12mm cement mortar [1:6]

    2ft above brick pillars

    Subject to actual

    Quantity of Work Volume/ Area/wt.

    2'- 0"

    Sand filling only

    1 no.

    45 ft x 15 ft

    10 ft

    14'10"

    15" x 15" x 14'-10"

    45 ft x 6 ft

    Unit Rate

    Excavation of foundation in hard soil dressingand levelling the bed etc. complete.

    MODEL PLAN AND ESTIMATE FOR CONSTRUCTION OF A NEW PHADI ROURKELA (KL) DIVISION

    15" x 15" x 10'-0"

    Sl.No.

    Total CostDescription of Work

    [All Dimensions in ft-in]

    Filling in Foundation & Plinth with sandwatered and rammed

    (7 ft x 5 ft)

    15" x 15" x 6'-6"

    16mm cement mortar [1:6]

    20mm cement mortar [1:6] over stone masonry

    GCI sheet with iron trusses

    Verandah GCI sheet

    10"

    CC [1:4:8] with 4 cm. metal in Plinth &Foundation work.

    2 x (45'10"+15'10") =

    1 x 45'10" =

    2 x 6' 10" =

  • 8/12/2019 PHADI 2014

    3/13

    131.67 Cft

    3.73 Cum 2819.81@ Rs. 10,5Rs.

    5.

    Phadi C/L

    1st Footing 1 x 123' 4" x 2' 6" x 0' 10" = 256.94 Cft

    2nd Footing 1 x 123' 4" x 2' 0" x 0' 9" = 185.00 Cft

    3rd Footing 2 x 123' 4" x 1' 6" x 0' 9" = 277.50 Cft

    Plinth

    Phadi C/L1 x 123' 4" x 1' 3" x 2' 0" = 308.33 CftVerandah C/L 1 x 59' 6" x 1' 6" x 1' 8" = 148.75 Cft

    Verandah pillar 1st footing 4 x 2' 0" x 2' 0" x 1' 0" = 16.00 Cft

    Pillar 2nd footing 4 x 1' 6" x 1' 6" x 0' 10" = 7.50 Cft

    Verandah plinth 1 x 59' 6" x 1' 3" x 1' 6" = 111.56 Cft

    1311.59 Cft

    Deduction

    Overlapping for pillar 4 x 2' 0" x 1' 6" x 1' 8" = 20.00 Cft

    1291.59 Cft

    Net 36.57 Cum 1854.51@ Rs. 67,8Rs.

    6.

    Main Building 1 x 123' 4" x 1' 3" = 154.17 Sqft

    14.33 Sqm 157.95@ Rs. 2,2Rs.

    7.

    Phadi C/L 1 x 123' 4" x 0' 10" x 10' 0" = 1027.78 Cft

    Gable 2 x 15' 10" x 0' 10" x 4' 10" = 127.55 Cft

    Pillar 8 x 1' 3" x 0' 5" x 10' 0" = 41.67 Cft

    Gable pillar 2 x 1' 3" x 0' 5" x 14' 10" = 15.45 Cft

    Parapet 4 x 9' 11" x 0' 10" x 1' 0" = 33.06 Cft

    Verandah pillar 4 x 1' 3" x 1' 3" x 6' 6" = 40.63 CftVerandah sidewall 2 x 5' 7" x 0' 10" x 8' 3" = 76.77 Cft

    Verandah Parapet 2 x 7' 11" x 0' 10" x 1' 0" = 13.19 Cft

    Steps 2 x 6' 0" x 1' 3" x 0' 6" = 7.50 Cft

    2 x 6' 0" x 0' 9" x 0' 6" = 4.50 Cft

    1388.09 Cft

    Deduct for Openings

    Door shutters 1 x 5' 0" x 0' 10" x 7' 0" = 29.17 CftFor CC workLintel 1 x 6' 6" x 0' 10" x 0' 6" = 2.71 CftPillar 4 x 1' 3" x 1' 3" x 2' 0" = 12.50 Cft

    44.38 Cft

    Net 1343.71 Cft

    38.04 Cum 2817.72@ Rs. 1,07,1Rs.

    8.

    Lintel 1 x 6' 6" x 0' 10" x 0' 6" = 2.71 Cft

    CC above brick pillar to receive truss 4 x 1' 3" x 1' 3" x 2' 0" = 12.50 Cft

    15.21 Cft

    0.43 Cum 4237.27@ Rs. 1,8Rs.

    9.

    0.43 Qtl 5756.28@ Rs. 2,4Rs.

    Brick work with K.B. brick in Cement mortar[1:6] mortar in super structure, includingcost, carriage, royalty etc.

    RCC [1:2:4] in top portion of pillars using 12mm chips including laying, compacting,curing, etc complete.

    2.5 cm Damp prof course with cc [1:2:4]using 12 mm cbg chips per sqm.

    Supplying ,fitting and placing uncoated HYSDbar reinforcement complete as per drawingand technical specification.

    RRHG stone masonary in CM [1:6] in Plinth &Foundation work.

  • 8/12/2019 PHADI 2014

    4/13

    10.

    Outside

    Phadi C/L 1 x 123' 4" x 10' 0" = 1233.33 Sqft

    Gable 1 x 123' 4" x 2' 5" = 297.85 Sqft

    Extra for pillar 8 x 0' 5" x 10' 0" = 33.33 Sqft

    2 x 0' 5" x 14' 10" = 12.36 Sqft

    Parapet 4 x 9' 11" x 1' 0" = 39.67 Sqft

    2 x 10' 11" x 0' 10" = 18.19 Sqft

    4 x 17' 10" x 1' 0" = 71.33 Sqft

    2 x 18' 10" x 0' 10" = 31.39 Sqft

    Verandah pillar 4 x 5' 0" x 6' 6" = 130.00 Sqft

    Steps 4 x 6' 0" x 0' 6" = 12.00 Sqft

    4 x 6' 0" x 0' 9" = 18.00 Sqft

    4 x 1' 3" x 0' 9" = 3.75 Sqft

    1901.21 Sqft

    Deduct for Opening

    Door 1 x 5' 0" x 7' 0" = 35.00 Sqft

    Net Area 1866.21 Sqft

    173.44 Sqm 71.53@ Rs. 12,4Rs.

    11.

    Phadi C/L 1 x 123' 4" x 10' 0" = 1233.33 Sqft

    Gable 1 x 123' 4" x 2' 5" = 298.06 Sqft

    Extra for pillar 8 x 0' 5" x 10' 0" = 33.33 Sqft

    2 x 0' 5" x 14' 10" = 12.36 Sqft

    Extra for door sides 1 x 24' 0" x 0' 10" = 20.00 Sqft

    1597.08 Sqft

    Deduct for Opening

    Door 1 x 5' 0" x 7' 0" = 35.00 Sqft

    Net Area 1562.08 Sqft

    145.18 Sqm 98.74@ Rs. 14,3Rs.

    12.

    Phadi C/L 1 x 123' 4" x 2' 2-1/2" = 272.36 Sqft

    Verandah 1 x 59' 6" x 2' 9" = 163.63 Sqft

    435.99 Sqft

    40.52 Sqm 108.58@ Rs. 4,39Rs.

    13.

    Lintel 2 x 6' 6" x 0' 6" = 6.50 Sqft

    1 x 5' 0" x 0' 10" = 4.17 Sqft

    4 x 3' 4" x 2' 0" = 26.67 Sqft37.33 Sqft

    3.47 Sqm 169.79@ Rs. 58Rs.

    14.

    2 nos. Each 140.00 Kg. 280.00 Kg. 75.00@ Rs. 21,0Rs.

    15.

    Main room 6 x 14.23 m = 85.37 Rmt

    Verandah 2 x 14.23 m = 28.46 Rmt

    Verandah rafter 4 x 2.95 m = 11.78 Rmt

    12 mm thick cement plaster [1:6] over brickwork.

    16 mm thick cement plaster [1:6] overbrick masonary.

    Supply of MS Angle Purlines [50x 50 x6]including cost but excluding carriage charges.

    20 mm thick cement plaster [1:6] over

    Stone masonry.

    Rigid and smooth centering & shutering forRCC work including false works &dismentalling then after casting includingcost of malerials complete in ground floo

    Cost of MS Angle 65x 65x 6 mm truss butexcluding carriage charges.

  • 8/12/2019 PHADI 2014

    5/13

    Clint on rafter 16 x 0.20 m = 3.25 Rmt

    Clamp on purlin 16 x 0.15 m = 2.40 Rmt

    131.25 Rmt

    590.64 Kg.

    Add loss 5% 29.53 Kg.

    620.17 Cft 70.00@ Rs. 43,4Rs.

    16.

    Main phadi 6 x 14.23 m = 85.37 Rmt

    Verandah 2 x 14.23 m = 28.46 Rmt

    113.82 Rmt

    227.64 Kg. 70.00@ Rs. 15,9Rs.

    17.

    Main Room 2 x 47' 1" x 11' 10" = 1114.31 Sqft

    Ridges 1 x 47' 1" x 2' 0" = 94.17 Sqft

    Verandah 1 x 47' 1" x 7' 11" = 372.74 Sqft

    1581.22 Sqft

    Add 5% for lapping 79.06 SqftTotal 1660.28 Cft

    154.30 Sqm 66.13@ Rs. 10,2Rs.

    18. Cost of GCI Sheet [ 0.50mm thick] 154.30 Sqm 606.40 Kg. 70.00@ Rs. 42,44Rs.

    19.

    17.34 Qtl 389.51@ Rs. 6,7Rs.

    20.

    L.S 2,0Rs.

    21.

    Door 1 x 5' 0" x 7' 0" = 8000.00@ Rs. 8,0Rs.

    22.

    L.S 2,0Rs.

    23.

    L.S 4,0Rs.

    24. White washing 3 coats with shell lime.

    Item No. 10 173.44 Sqm

    Item No. 11 40.52 Sqm

    Item No. 12 145.18 Sqm

    359.13 Sqm 8.69@ Rs. 3,1Rs.

    Total 3,95,6Rs.

    4,0Rs.3,99,6Rs.

    Or Say 4,00,00Rs.

    @ Rs. 3.93 Kg

    Area outside wall

    Area outside wall

    Area inside wall

    Certified that the estimate has been prepared basing on the Schedule of Rates 2013 and the lowest prevailing market price ofcontract materials. No overhead charges are taken in to consideration in any item.

    Labour cess 1% vide resolution No.12653 Dt.15.12.2008 of Govt. in Labour and Employment Department under B&OCWWC Act, 1996

    Cost of M.S. GI shutters including framefitting, fixing and painting.

    Cost of all materials, J- hooks, HD bolt,GIwasher,Bitumen washer, etc.

    Transpoartation Charges for Iron Angles,purlin, wing ties, GCI sheet, etc.

    Grand total

    Supply of MS Flat Wind Tie [50x5] includingcost but excluding carriage charges.

    @ 4.5 Kg per mt.

    @ 2.0 Kg per mt.

    Labour for hoisting joists & trusses & purlinein position.

    Cost of Paint for Iron work in two coatincluding transportation charges & tax.

    (Rupees Four Lakh ) only.

    Labour for fixing GCI Sheet in roof includingfixing of ridges wind ties etc. completeincluding drilling holes in wind ties butexcluding cost of fitting.

  • 8/12/2019 PHADI 2014

    6/13

  • 8/12/2019 PHADI 2014

    7/13

  • 8/12/2019 PHADI 2014

    8/13

  • 8/12/2019 PHADI 2014

    9/13

    1 2 3 4 5 6 7 8 9 1

    1 Sand for filling Approx. 10 cum 136.00 40.00 0.00 176.00

    2 Sand for mortar Approx. 10 cum 136.00 40.00 0.00 176.00

    3 Metal cbg 4 cm. Approx. 20 cum 136.00 120.00 0.00 256.00

    4 Stone Approx. 10 cum 136.00 40.00 0.00 176.00

    5 Chips cbg 10 mm Approx. 20 cum 136.00 120.00 0.00 256.00 1,

    6 Chips cbg 12 mm Approx. 20 cum 136.00 120.00 0.00 256.00 1,

    7 Chips cbg 20 mm Approx. 20 cum 136.00 120.00 0.00 256.00 9

    8 Chips cbg 6 mm Approx. 20 cum 136.00 120.00 0.00 256.00

    9 K.B.Bricks Approx. 20 2000 No. 879.00 540.00 0.00 1,419.00 7,

    10 K.B.Bricks Khoa 4 cm Approx. 20 cum 136.00 120.00 0.00 256.00

    11 Cement Approx. 20 MT 147.00 112.50 0.00 259.50 5,

    12 MS Rod Approx. 20 MT 147.00 112.50 0.00 259.50 50,

    Ka

    Certified that the lead provided in the statement is correct and shortest to the best of my knowledge.

    Every extra

    kms. up to

    50 kms.

    Unit

    Cos

    mate

    [As Sched

    Rates '

    Distanceto

    becarried

    inkm

    s.

    Every extra

    kms. beyond

    50 kms.

    Total [6

    to 8]

    Cost of conveyance by Truck as per Schedule of Rates

    '2013'

    Up to 5 kms.

    LEAD STATEMENT OF MATERIALS

    NEW PHADI

    Sl. No. Name of the Materials Place

  • 8/12/2019 PHADI 2014

    10/13

    1 2 3 4 5 6

    1.

    Man/Female Mulia Each 43.00 150.00 6,450.00Rs.2% T & P,Sundries 129.00Rs.

    6,579.00Rs.

    20% extra for foundation work 1,315.80Rs.

    Rate per 100cum. 7,894.80Rs.

    Rate per 1 cum. Or Say 78.95Rs.

    2.

    I Materials

    Sand for filling Cum 100.00 42.00 4,200.00Rs.

    Add Carriage, Royalty

    Sand for filling 19,560.00Rs.

    23,760.00Rs.

    II Labour

    Female Mulia Each 12.36 150.00 1,854.00Rs.

    2% T & P,Sundries supervision charges 37.08Rs.

    1,891.08Rs.

    Cost for 100 Cum 25,651.08Rs.

    Cost for 1 Cum 256.51Rs.

    3.

    I Materials

    Metal cbg 4 cm Cum 0.96 679.00 651.84Rs.

    Sand for mortar Cum 0.48 48.00 23.04Rs.

    Cement Qtl 1.72 550.00 946.00Rs.

    Add Carriage, Royalty

    Metal cbg 4 cm 313.50Rs.

    Sand for Mortar 93.89Rs.

    Cement 172.34Rs.

    2,200.61Rs.

    II Labour

    Mason 2nd class Each 0.18 190.00 34.20Rs.

    Man/Female Mulia Each 3.90 150.00 585.00Rs.

    619.20Rs.

    Cost for 1 Cum 2,819.81Rs.

    Or Say 2,819.81Rs.

    4.

    I Materials

    Rough stone Cum 1.00 180.00 180.00Rs.

    Sand for mortar Cum 0.34 48.00 16.32Rs.

    Cement Qtl 0.82 550.00 448.31Rs.

    Add Carriage, Royalty

    Rough stone 246.56Rs.

    Sand for Mortar 66.50Rs.

    Cement 81.67Rs.

    1,039.36Rs.

    II Labour

    Mason 1st class Each 0.35 205.00 71.75Rs.

    Sl.

    No.

    Filling in foundation & plinth with sand watered and rammed per 100

    cum.

    UnitQuantity

    requiredRate

    Earth work in hard soil within 50m.initial lead and 1.5m initial lift

    including rough dressing and breaking clods to maximum 5 cm to 7 cm

    and laying in layers not exceeding 0.3m in depth. in foundation work

    per 100 cum.

    RRHG stone masonary in cement mortar [1:6] in foundation & Plinth

    per 1 cum.

    ANALYSIS OF RATES ( AS PER 2006)

    FOR NEW PHADI

    Description of Work

    Cement concrete[1:4:8] with 4 cm. metal in plinth & foundation work

    per cum.

    Amount

  • 8/12/2019 PHADI 2014

    11/13

    Mason 2nd class Each 1.41 190.00 267.90Rs.

    Mulia Each 3.17 150.00 475.50Rs.

    815.15Rs.

    Cost for 1 Cum 1,854.51Rs.

    Or Say 1,854.51Rs.

    5

    I Materials

    Chips cbg 12 mm Cum 0.023 1,016.00 23.37Rs.

    Sand for mortar Cum 0.012 48.00 0.58Rs.Cement Qtl 0.0754 550.00 41.47Rs.

    Add Carriage, Royalty

    Chips cbg 12 mm 7.51Rs.

    Sand for Mortar 2.35Rs.

    Cement 7.56Rs.

    82.83Rs.

    II Labour

    Mason 1st class Each 0.103 205.00 21.12Rs.

    Man/Female Mulia Each 0.36 150.00 54.00Rs.

    75.12Rs.

    Cost for 1 Sqm 157.94Rs.

    Or Say 157.95Rs.

    6.

    I Materials

    K.B. brick No. 350.00 7520.00 1,316.00Rs.

    Sand for mortar Cum 0.28 48.00 13.44Rs.

    Cement Qtl 0.67 550.00 369.60Rs.

    Add Carriage, Royalty

    K.B. brick 248.33Rs.

    Sand for mortar 54.77Rs.

    Cement 67.33Rs.

    2,069.47Rs.

    II Labour

    Mason 1st class Each 0.35 205.00 71.75Rs.

    Mason 2nd class Each 1.05 190.00 199.50Rs.

    Man/Female Mulia Each 2.96 150.00 444.00Rs.

    715.25Rs.

    Cost for 1 Cum 2,784.72Rs.

    Or Say 2,784.72Rs.

    Add for Superstructure work 33.00Rs.

    Cost for 1 Cum 2,817.72Rs.

    Or Say 2,817.72Rs.

    12.

    RCC Lintels

    Details for 7.80 sqm.

    i. 38 mm thick non sal Planks Cum 0.41 16,828.00 6,949.96Rs.

    ii. 120 mm dia sal Bullah Mt 21.00 83.00 1,743.00Rs.

    iii. Carriage of wood within 5 km Cum 0.69 73.86 50.89Rs.

    8,743.85Rs.

    Considering 10 times use of the materials 874.39Rs.

    Carpenter 2nd class Each 1.25 190.00 237.50Rs.

    Sangi mulia Each 1.25 170.00 212.50Rs.

    Cost for 7.80 Sqm 1,324.39Rs.

    Cost for 1 Sqm 169.79Rs.

    Rigid and smooth centering & shutering for RCC work including false

    works & dismentalling then after casting including cost of malerials

    complete in ground floor.

    2.5 cm Damp prof course with cc [1:2:4] using 12 mm cbg chips per

    sqm.

    Brick work with K.B. brick having crushing strength not less than 75

    Kg/sqcm in cement mortar [1:6] in plinth & foundation work per 1 cum

  • 8/12/2019 PHADI 2014

    12/13

    Or Say 169.79Rs.

    13.

    Unit - 1 MT

    I Materials

    Mt 1.05 52259.50 54,872.48Rs.

    Binding wire Kg 8.00 66.00 528.00Rs.

    Add Carriage 272.48Rs.

    55,672.95Rs.II Labour

    Mate Each 0.44 170.00 74.80Rs.

    Blacksmith (special) Each 3.00 205.00 615.00Rs.

    Man Mulia Each 8.00 150.00 1,200.00Rs.

    1,889.80Rs.

    Total [I+II] Rate per MT. 57,562.75Rs.

    Rate per 1 Qtl. 5,756.28Rs.

    Or Say 5,756.28Rs.

    14. Cement concrete [1:2:4] with 12 mm size cbg chips per one cum.

    I Materials

    Chips cbg 12 mm Cum 0.90 1016.00 914.40Rs.

    Sand for mortar Cum 0.450 48.00 21.60Rs.

    Cement Qtl 3.230 550.00 1,776.50Rs.

    Add Carriage, Royalty

    Chips cbg 12 mm 293.90Rs.

    Sand for Mortar 88.02Rs.

    Cement 323.65Rs.

    3,418.07Rs.

    II Labour

    Mason 2nd class Each 0.68 190.00 129.20Rs.

    Man/Female Mulia Each 4.60 150.00 690.00Rs.

    819.20Rs.

    Cost for 1 Cum 4,237.27Rs.

    Or Say 4,237.27Rs.

    15. 12 mm thick cement plaster [1:6] over brick work per sqm.

    I Materials

    Sand for mortar Cum 0.015 48.00 0.72Rs.

    Cement Qtl 0.0358 550.00 19.69Rs.

    Add Carriage, Royalty

    Sand for mortar 2.93Rs.

    Cement 3.59Rs.

    26.93Rs.

    II Labour

    Mason 2nd class Each 0.14 190.00 26.60Rs.

    Man/Female Mulia Each 0.12 150.00 18.00Rs.

    44.60Rs.

    Total [I+II] 71.53Rs.71.53Rs.

    16. 16 mm thick cement plaster [1:6] over brick work per sqm.

    I Materials

    Sand for mortar Cum 0.018 48.00 0.86Rs.

    Cement Qtl 0.043 550.00 23.65Rs.

    Add Carriage, Royalty

    Sand for mortar 3.52Rs.

    Cement 4.31Rs.

    32.34Rs.

    II Labour

    Mason 2nd class Each 0.16 190.00 30.40Rs.

    Supplying ,fitting and placing uncoated HYSD bar reinforcement

    complete as per drawing and technical specification.

    HYSD bars including 5 percent overlaps and wastage

  • 8/12/2019 PHADI 2014

    13/13

    Man/Female Mulia Each 0.24 150.00 36.00Rs.

    66.40Rs.

    Total [I+II] 98.74Rs.

    98.74Rs.

    17.

    I Materials

    Sand for mortar Cum 0.021 48.00 1.01Rs.

    Cement Qtl 0.057 550.00 31.35Rs.

    Add Carriage, RoyaltySand for mortar 4.11Rs.

    Cement 5.71Rs.

    42.18Rs.

    II Labour

    Mason 2nd class Each 0.16 190.00 30.40Rs.

    Man/Female Mulia Each 0.24 150.00 36.00Rs.

    66.40Rs.

    Total [I+II] 108.58Rs.

    108.58Rs.

    18.

    Data for 9.3 sqm.

    Labour

    Carpenter (Special) Each 0.50 205.00 102.50Rs.

    Fitter(Secial) Each 1.00 205.00 205.00Rs.

    Man Mulia Each 2.00 150.00 300.00Rs.

    2 % sundries and T&P etc. 7.47Rs.

    Total 614.97Rs.

    Rate per 1 Sqm 66.13Rs.

    19.

    Data for 0.508 Qntl.

    Labour

    Sangi Mulia for conveying joist from outside to the

    buildings. Each 0.25 170.00 42.50Rs.

    Sangi Mulia for lifting joists up to top of the walls

    with ropes, etc. Each 0.75 170.00 127.50Rs.

    Man Mulia for placing joists in position Each 0.17 150.00 25.50Rs.

    2% Scaffolding ropes, Sundries, T&P etc. 2.37Rs.

    Total 197.87Rs.

    Rate per 1 Qntl. 389.51Rs.

    20. White washing 3 coats with shell lime per 1 Sqm

    Data for 93 Sqm.

    Material

    Shell lime unslaked Kg 23.32 16.00 373.12Rs.

    LabourPainter (2nd class) Each 1.50 190.00 285.00Rs.

    Man Mulia Each 1.00 150.00 150.00Rs.

    808.12Rs.

    Rate per 1 Sqm. 8.69Rs.

    Submitted by

    Range Officer

    Kalunga(KL) Range

    20 mm thick cement plaster [1:6] over stone masonary per sqm.

    Hoisting joists and trusses and placing in position (labour only) Per 1

    Qntl.

    Labour for fixing G.C.I. Sheet in roof drilling hole in wind ties including

    fixing of ridges valleys wind ties etc. excluding cost of fitting per 1

    Sqm.