SPECIFICATIONS:
Room space
Verandah
Wall height
Gabble height
Pillar dimension = 8 nos.
= 2 nos.
Verandah pillar = 4 nos.
Brick wall thicknessOutside plastering
Inside plastering
Reinforced concrete pillar
Roof
Plinth height above ground
Floor
GI sheet door
CENTER LINE:
Phadi 123'- 4"
Verandah 45'-10"
13'- 8"
182'-10"
No Length Breadth Height Total
1. Layout, demarcation and cleaning, etc. Rs. 2,00
2.
Phadi C/L 1 x 123' 4" x 3' 0" x 3' 0" = 1110.00 Cft
VerandahC/L 1 x 59' 6" x 1' 6" x 2' 0" = 178.50 Cft
Extra for verandah pillar 4 x 2' 0" x 2' 0" x 2' 6" = 40.00 Cft
Steps 1 x 6' 0" x 1' 3" x 0' 4" = 2.50 Cft
1331.00 Cft
Deduction
Overlapping for Pillar 4 x 2' 0" x 1' 6" x 2' 0" = 24.00 Cft
Net volume 1307.00 Cft
37.00 Cum 78.95@ Rs. 2,9Rs.
3.
Phadi C/L 1 x 123' 4" x 3' 0" x 0' 4" = 123.33 Cft
1st footing 1 x 123' 4" x 0' 6" x 0' 10" = 51.39 Cft
2nd footing 1 x 123' 4" x 1' 0" x 0' 9" = 92.50 Cft
3rd footing 1 x 123' 4" x 1' 6" x 0' 9" = 138.75 Cft
Verandah C/L 1 x 59' 6" x 1' 6" x 0' 4" = 29.75 Cft
Verandah pillar 1 x 2' 0" x 2' 0" x 0' 4" = 1.33 Cft
Room 1 x 44' 7" x 14' 7" x 0' 9" = 487.63 Cft
Verandah floor 1 x 44' 7" x 5' 7" x 0' 9" = 186.69 Cft
1111.38 Cft
31.47 Cum 256.51@ Rs. 8,0Rs.
4.
Phadi C/L 1 x 123' 4" x 3' 0" x 0' 4" = 123.33 Cft
Verandah pillar 4 x 2' 0" x 2' 0" x 0' 4" = 5.33 Cft
Steps 1 x 6' 0" x 1' 6" x 0' 4" = 3.00 Cft
12mm cement mortar [1:6]
2ft above brick pillars
Subject to actual
Quantity of Work Volume/ Area/wt.
2'- 0"
Sand filling only
1 no.
45 ft x 15 ft
10 ft
14'10"
15" x 15" x 14'-10"
45 ft x 6 ft
Unit Rate
Excavation of foundation in hard soil dressingand levelling the bed etc. complete.
MODEL PLAN AND ESTIMATE FOR CONSTRUCTION OF A NEW PHADI ROURKELA (KL) DIVISION
15" x 15" x 10'-0"
Sl.No.
Total CostDescription of Work
[All Dimensions in ft-in]
Filling in Foundation & Plinth with sandwatered and rammed
(7 ft x 5 ft)
15" x 15" x 6'-6"
16mm cement mortar [1:6]
20mm cement mortar [1:6] over stone masonry
GCI sheet with iron trusses
Verandah GCI sheet
10"
CC [1:4:8] with 4 cm. metal in Plinth &Foundation work.
2 x (45'10"+15'10") =
1 x 45'10" =
2 x 6' 10" =
-
8/12/2019 PHADI 2014
3/13
131.67 Cft
3.73 Cum 2819.81@ Rs. 10,5Rs.
5.
Phadi C/L
1st Footing 1 x 123' 4" x 2' 6" x 0' 10" = 256.94 Cft
2nd Footing 1 x 123' 4" x 2' 0" x 0' 9" = 185.00 Cft
3rd Footing 2 x 123' 4" x 1' 6" x 0' 9" = 277.50 Cft
Plinth
Phadi C/L1 x 123' 4" x 1' 3" x 2' 0" = 308.33 CftVerandah C/L 1 x 59' 6" x 1' 6" x 1' 8" = 148.75 Cft
Verandah pillar 1st footing 4 x 2' 0" x 2' 0" x 1' 0" = 16.00 Cft
Pillar 2nd footing 4 x 1' 6" x 1' 6" x 0' 10" = 7.50 Cft
Verandah plinth 1 x 59' 6" x 1' 3" x 1' 6" = 111.56 Cft
1311.59 Cft
Deduction
Overlapping for pillar 4 x 2' 0" x 1' 6" x 1' 8" = 20.00 Cft
1291.59 Cft
Net 36.57 Cum 1854.51@ Rs. 67,8Rs.
6.
Main Building 1 x 123' 4" x 1' 3" = 154.17 Sqft
14.33 Sqm 157.95@ Rs. 2,2Rs.
7.
Phadi C/L 1 x 123' 4" x 0' 10" x 10' 0" = 1027.78 Cft
Gable 2 x 15' 10" x 0' 10" x 4' 10" = 127.55 Cft
Pillar 8 x 1' 3" x 0' 5" x 10' 0" = 41.67 Cft
Gable pillar 2 x 1' 3" x 0' 5" x 14' 10" = 15.45 Cft
Parapet 4 x 9' 11" x 0' 10" x 1' 0" = 33.06 Cft
Verandah pillar 4 x 1' 3" x 1' 3" x 6' 6" = 40.63 CftVerandah sidewall 2 x 5' 7" x 0' 10" x 8' 3" = 76.77 Cft
Verandah Parapet 2 x 7' 11" x 0' 10" x 1' 0" = 13.19 Cft
Steps 2 x 6' 0" x 1' 3" x 0' 6" = 7.50 Cft
2 x 6' 0" x 0' 9" x 0' 6" = 4.50 Cft
1388.09 Cft
Deduct for Openings
Door shutters 1 x 5' 0" x 0' 10" x 7' 0" = 29.17 CftFor CC workLintel 1 x 6' 6" x 0' 10" x 0' 6" = 2.71 CftPillar 4 x 1' 3" x 1' 3" x 2' 0" = 12.50 Cft
44.38 Cft
Net 1343.71 Cft
38.04 Cum 2817.72@ Rs. 1,07,1Rs.
8.
Lintel 1 x 6' 6" x 0' 10" x 0' 6" = 2.71 Cft
CC above brick pillar to receive truss 4 x 1' 3" x 1' 3" x 2' 0" = 12.50 Cft
15.21 Cft
0.43 Cum 4237.27@ Rs. 1,8Rs.
9.
0.43 Qtl 5756.28@ Rs. 2,4Rs.
Brick work with K.B. brick in Cement mortar[1:6] mortar in super structure, includingcost, carriage, royalty etc.
RCC [1:2:4] in top portion of pillars using 12mm chips including laying, compacting,curing, etc complete.
2.5 cm Damp prof course with cc [1:2:4]using 12 mm cbg chips per sqm.
Supplying ,fitting and placing uncoated HYSDbar reinforcement complete as per drawingand technical specification.
RRHG stone masonary in CM [1:6] in Plinth &Foundation work.
-
8/12/2019 PHADI 2014
4/13
10.
Outside
Phadi C/L 1 x 123' 4" x 10' 0" = 1233.33 Sqft
Gable 1 x 123' 4" x 2' 5" = 297.85 Sqft
Extra for pillar 8 x 0' 5" x 10' 0" = 33.33 Sqft
2 x 0' 5" x 14' 10" = 12.36 Sqft
Parapet 4 x 9' 11" x 1' 0" = 39.67 Sqft
2 x 10' 11" x 0' 10" = 18.19 Sqft
4 x 17' 10" x 1' 0" = 71.33 Sqft
2 x 18' 10" x 0' 10" = 31.39 Sqft
Verandah pillar 4 x 5' 0" x 6' 6" = 130.00 Sqft
Steps 4 x 6' 0" x 0' 6" = 12.00 Sqft
4 x 6' 0" x 0' 9" = 18.00 Sqft
4 x 1' 3" x 0' 9" = 3.75 Sqft
1901.21 Sqft
Deduct for Opening
Door 1 x 5' 0" x 7' 0" = 35.00 Sqft
Net Area 1866.21 Sqft
173.44 Sqm 71.53@ Rs. 12,4Rs.
11.
Phadi C/L 1 x 123' 4" x 10' 0" = 1233.33 Sqft
Gable 1 x 123' 4" x 2' 5" = 298.06 Sqft
Extra for pillar 8 x 0' 5" x 10' 0" = 33.33 Sqft
2 x 0' 5" x 14' 10" = 12.36 Sqft
Extra for door sides 1 x 24' 0" x 0' 10" = 20.00 Sqft
1597.08 Sqft
Deduct for Opening
Door 1 x 5' 0" x 7' 0" = 35.00 Sqft
Net Area 1562.08 Sqft
145.18 Sqm 98.74@ Rs. 14,3Rs.
12.
Phadi C/L 1 x 123' 4" x 2' 2-1/2" = 272.36 Sqft
Verandah 1 x 59' 6" x 2' 9" = 163.63 Sqft
435.99 Sqft
40.52 Sqm 108.58@ Rs. 4,39Rs.
13.
Lintel 2 x 6' 6" x 0' 6" = 6.50 Sqft
1 x 5' 0" x 0' 10" = 4.17 Sqft
4 x 3' 4" x 2' 0" = 26.67 Sqft37.33 Sqft
3.47 Sqm 169.79@ Rs. 58Rs.
14.
2 nos. Each 140.00 Kg. 280.00 Kg. 75.00@ Rs. 21,0Rs.
15.
Main room 6 x 14.23 m = 85.37 Rmt
Verandah 2 x 14.23 m = 28.46 Rmt
Verandah rafter 4 x 2.95 m = 11.78 Rmt
12 mm thick cement plaster [1:6] over brickwork.
16 mm thick cement plaster [1:6] overbrick masonary.
Supply of MS Angle Purlines [50x 50 x6]including cost but excluding carriage charges.
20 mm thick cement plaster [1:6] over
Stone masonry.
Rigid and smooth centering & shutering forRCC work including false works &dismentalling then after casting includingcost of malerials complete in ground floo
Cost of MS Angle 65x 65x 6 mm truss butexcluding carriage charges.
-
8/12/2019 PHADI 2014
5/13
Clint on rafter 16 x 0.20 m = 3.25 Rmt
Clamp on purlin 16 x 0.15 m = 2.40 Rmt
131.25 Rmt
590.64 Kg.
Add loss 5% 29.53 Kg.
620.17 Cft 70.00@ Rs. 43,4Rs.
16.
Main phadi 6 x 14.23 m = 85.37 Rmt
Verandah 2 x 14.23 m = 28.46 Rmt
113.82 Rmt
227.64 Kg. 70.00@ Rs. 15,9Rs.
17.
Main Room 2 x 47' 1" x 11' 10" = 1114.31 Sqft
Ridges 1 x 47' 1" x 2' 0" = 94.17 Sqft
Verandah 1 x 47' 1" x 7' 11" = 372.74 Sqft
1581.22 Sqft
Add 5% for lapping 79.06 SqftTotal 1660.28 Cft
154.30 Sqm 66.13@ Rs. 10,2Rs.
18. Cost of GCI Sheet [ 0.50mm thick] 154.30 Sqm 606.40 Kg. 70.00@ Rs. 42,44Rs.
19.
17.34 Qtl 389.51@ Rs. 6,7Rs.
20.
L.S 2,0Rs.
21.
Door 1 x 5' 0" x 7' 0" = 8000.00@ Rs. 8,0Rs.
22.
L.S 2,0Rs.
23.
L.S 4,0Rs.
24. White washing 3 coats with shell lime.
Item No. 10 173.44 Sqm
Item No. 11 40.52 Sqm
Item No. 12 145.18 Sqm
359.13 Sqm 8.69@ Rs. 3,1Rs.
Total 3,95,6Rs.
4,0Rs.3,99,6Rs.
Or Say 4,00,00Rs.
@ Rs. 3.93 Kg
Area outside wall
Area outside wall
Area inside wall
Certified that the estimate has been prepared basing on the Schedule of Rates 2013 and the lowest prevailing market price ofcontract materials. No overhead charges are taken in to consideration in any item.
Labour cess 1% vide resolution No.12653 Dt.15.12.2008 of Govt. in Labour and Employment Department under B&OCWWC Act, 1996
Cost of M.S. GI shutters including framefitting, fixing and painting.
Cost of all materials, J- hooks, HD bolt,GIwasher,Bitumen washer, etc.
Transpoartation Charges for Iron Angles,purlin, wing ties, GCI sheet, etc.
Grand total
Supply of MS Flat Wind Tie [50x5] includingcost but excluding carriage charges.
@ 4.5 Kg per mt.
@ 2.0 Kg per mt.
Labour for hoisting joists & trusses & purlinein position.
Cost of Paint for Iron work in two coatincluding transportation charges & tax.
(Rupees Four Lakh ) only.
Labour for fixing GCI Sheet in roof includingfixing of ridges wind ties etc. completeincluding drilling holes in wind ties butexcluding cost of fitting.
-
8/12/2019 PHADI 2014
6/13
-
8/12/2019 PHADI 2014
7/13
-
8/12/2019 PHADI 2014
8/13
-
8/12/2019 PHADI 2014
9/13
1 2 3 4 5 6 7 8 9 1
1 Sand for filling Approx. 10 cum 136.00 40.00 0.00 176.00
2 Sand for mortar Approx. 10 cum 136.00 40.00 0.00 176.00
3 Metal cbg 4 cm. Approx. 20 cum 136.00 120.00 0.00 256.00
4 Stone Approx. 10 cum 136.00 40.00 0.00 176.00
5 Chips cbg 10 mm Approx. 20 cum 136.00 120.00 0.00 256.00 1,
6 Chips cbg 12 mm Approx. 20 cum 136.00 120.00 0.00 256.00 1,
7 Chips cbg 20 mm Approx. 20 cum 136.00 120.00 0.00 256.00 9
8 Chips cbg 6 mm Approx. 20 cum 136.00 120.00 0.00 256.00
9 K.B.Bricks Approx. 20 2000 No. 879.00 540.00 0.00 1,419.00 7,
10 K.B.Bricks Khoa 4 cm Approx. 20 cum 136.00 120.00 0.00 256.00
11 Cement Approx. 20 MT 147.00 112.50 0.00 259.50 5,
12 MS Rod Approx. 20 MT 147.00 112.50 0.00 259.50 50,
Ka
Certified that the lead provided in the statement is correct and shortest to the best of my knowledge.
Every extra
kms. up to
50 kms.
Unit
Cos
mate
[As Sched
Rates '
Distanceto
becarried
inkm
s.
Every extra
kms. beyond
50 kms.
Total [6
to 8]
Cost of conveyance by Truck as per Schedule of Rates
'2013'
Up to 5 kms.
LEAD STATEMENT OF MATERIALS
NEW PHADI
Sl. No. Name of the Materials Place
-
8/12/2019 PHADI 2014
10/13
1 2 3 4 5 6
1.
Man/Female Mulia Each 43.00 150.00 6,450.00Rs.2% T & P,Sundries 129.00Rs.
6,579.00Rs.
20% extra for foundation work 1,315.80Rs.
Rate per 100cum. 7,894.80Rs.
Rate per 1 cum. Or Say 78.95Rs.
2.
I Materials
Sand for filling Cum 100.00 42.00 4,200.00Rs.
Add Carriage, Royalty
Sand for filling 19,560.00Rs.
23,760.00Rs.
II Labour
Female Mulia Each 12.36 150.00 1,854.00Rs.
2% T & P,Sundries supervision charges 37.08Rs.
1,891.08Rs.
Cost for 100 Cum 25,651.08Rs.
Cost for 1 Cum 256.51Rs.
3.
I Materials
Metal cbg 4 cm Cum 0.96 679.00 651.84Rs.
Sand for mortar Cum 0.48 48.00 23.04Rs.
Cement Qtl 1.72 550.00 946.00Rs.
Add Carriage, Royalty
Metal cbg 4 cm 313.50Rs.
Sand for Mortar 93.89Rs.
Cement 172.34Rs.
2,200.61Rs.
II Labour
Mason 2nd class Each 0.18 190.00 34.20Rs.
Man/Female Mulia Each 3.90 150.00 585.00Rs.
619.20Rs.
Cost for 1 Cum 2,819.81Rs.
Or Say 2,819.81Rs.
4.
I Materials
Rough stone Cum 1.00 180.00 180.00Rs.
Sand for mortar Cum 0.34 48.00 16.32Rs.
Cement Qtl 0.82 550.00 448.31Rs.
Add Carriage, Royalty
Rough stone 246.56Rs.
Sand for Mortar 66.50Rs.
Cement 81.67Rs.
1,039.36Rs.
II Labour
Mason 1st class Each 0.35 205.00 71.75Rs.
Sl.
No.
Filling in foundation & plinth with sand watered and rammed per 100
cum.
UnitQuantity
requiredRate
Earth work in hard soil within 50m.initial lead and 1.5m initial lift
including rough dressing and breaking clods to maximum 5 cm to 7 cm
and laying in layers not exceeding 0.3m in depth. in foundation work
per 100 cum.
RRHG stone masonary in cement mortar [1:6] in foundation & Plinth
per 1 cum.
ANALYSIS OF RATES ( AS PER 2006)
FOR NEW PHADI
Description of Work
Cement concrete[1:4:8] with 4 cm. metal in plinth & foundation work
per cum.
Amount
-
8/12/2019 PHADI 2014
11/13
Mason 2nd class Each 1.41 190.00 267.90Rs.
Mulia Each 3.17 150.00 475.50Rs.
815.15Rs.
Cost for 1 Cum 1,854.51Rs.
Or Say 1,854.51Rs.
5
I Materials
Chips cbg 12 mm Cum 0.023 1,016.00 23.37Rs.
Sand for mortar Cum 0.012 48.00 0.58Rs.Cement Qtl 0.0754 550.00 41.47Rs.
Add Carriage, Royalty
Chips cbg 12 mm 7.51Rs.
Sand for Mortar 2.35Rs.
Cement 7.56Rs.
82.83Rs.
II Labour
Mason 1st class Each 0.103 205.00 21.12Rs.
Man/Female Mulia Each 0.36 150.00 54.00Rs.
75.12Rs.
Cost for 1 Sqm 157.94Rs.
Or Say 157.95Rs.
6.
I Materials
K.B. brick No. 350.00 7520.00 1,316.00Rs.
Sand for mortar Cum 0.28 48.00 13.44Rs.
Cement Qtl 0.67 550.00 369.60Rs.
Add Carriage, Royalty
K.B. brick 248.33Rs.
Sand for mortar 54.77Rs.
Cement 67.33Rs.
2,069.47Rs.
II Labour
Mason 1st class Each 0.35 205.00 71.75Rs.
Mason 2nd class Each 1.05 190.00 199.50Rs.
Man/Female Mulia Each 2.96 150.00 444.00Rs.
715.25Rs.
Cost for 1 Cum 2,784.72Rs.
Or Say 2,784.72Rs.
Add for Superstructure work 33.00Rs.
Cost for 1 Cum 2,817.72Rs.
Or Say 2,817.72Rs.
12.
RCC Lintels
Details for 7.80 sqm.
i. 38 mm thick non sal Planks Cum 0.41 16,828.00 6,949.96Rs.
ii. 120 mm dia sal Bullah Mt 21.00 83.00 1,743.00Rs.
iii. Carriage of wood within 5 km Cum 0.69 73.86 50.89Rs.
8,743.85Rs.
Considering 10 times use of the materials 874.39Rs.
Carpenter 2nd class Each 1.25 190.00 237.50Rs.
Sangi mulia Each 1.25 170.00 212.50Rs.
Cost for 7.80 Sqm 1,324.39Rs.
Cost for 1 Sqm 169.79Rs.
Rigid and smooth centering & shutering for RCC work including false
works & dismentalling then after casting including cost of malerials
complete in ground floor.
2.5 cm Damp prof course with cc [1:2:4] using 12 mm cbg chips per
sqm.
Brick work with K.B. brick having crushing strength not less than 75
Kg/sqcm in cement mortar [1:6] in plinth & foundation work per 1 cum
-
8/12/2019 PHADI 2014
12/13
Or Say 169.79Rs.
13.
Unit - 1 MT
I Materials
Mt 1.05 52259.50 54,872.48Rs.
Binding wire Kg 8.00 66.00 528.00Rs.
Add Carriage 272.48Rs.
55,672.95Rs.II Labour
Mate Each 0.44 170.00 74.80Rs.
Blacksmith (special) Each 3.00 205.00 615.00Rs.
Man Mulia Each 8.00 150.00 1,200.00Rs.
1,889.80Rs.
Total [I+II] Rate per MT. 57,562.75Rs.
Rate per 1 Qtl. 5,756.28Rs.
Or Say 5,756.28Rs.
14. Cement concrete [1:2:4] with 12 mm size cbg chips per one cum.
I Materials
Chips cbg 12 mm Cum 0.90 1016.00 914.40Rs.
Sand for mortar Cum 0.450 48.00 21.60Rs.
Cement Qtl 3.230 550.00 1,776.50Rs.
Add Carriage, Royalty
Chips cbg 12 mm 293.90Rs.
Sand for Mortar 88.02Rs.
Cement 323.65Rs.
3,418.07Rs.
II Labour
Mason 2nd class Each 0.68 190.00 129.20Rs.
Man/Female Mulia Each 4.60 150.00 690.00Rs.
819.20Rs.
Cost for 1 Cum 4,237.27Rs.
Or Say 4,237.27Rs.
15. 12 mm thick cement plaster [1:6] over brick work per sqm.
I Materials
Sand for mortar Cum 0.015 48.00 0.72Rs.
Cement Qtl 0.0358 550.00 19.69Rs.
Add Carriage, Royalty
Sand for mortar 2.93Rs.
Cement 3.59Rs.
26.93Rs.
II Labour
Mason 2nd class Each 0.14 190.00 26.60Rs.
Man/Female Mulia Each 0.12 150.00 18.00Rs.
44.60Rs.
Total [I+II] 71.53Rs.71.53Rs.
16. 16 mm thick cement plaster [1:6] over brick work per sqm.
I Materials
Sand for mortar Cum 0.018 48.00 0.86Rs.
Cement Qtl 0.043 550.00 23.65Rs.
Add Carriage, Royalty
Sand for mortar 3.52Rs.
Cement 4.31Rs.
32.34Rs.
II Labour
Mason 2nd class Each 0.16 190.00 30.40Rs.
Supplying ,fitting and placing uncoated HYSD bar reinforcement
complete as per drawing and technical specification.
HYSD bars including 5 percent overlaps and wastage
-
8/12/2019 PHADI 2014
13/13
Man/Female Mulia Each 0.24 150.00 36.00Rs.
66.40Rs.
Total [I+II] 98.74Rs.
98.74Rs.
17.
I Materials
Sand for mortar Cum 0.021 48.00 1.01Rs.
Cement Qtl 0.057 550.00 31.35Rs.
Add Carriage, RoyaltySand for mortar 4.11Rs.
Cement 5.71Rs.
42.18Rs.
II Labour
Mason 2nd class Each 0.16 190.00 30.40Rs.
Man/Female Mulia Each 0.24 150.00 36.00Rs.
66.40Rs.
Total [I+II] 108.58Rs.
108.58Rs.
18.
Data for 9.3 sqm.
Labour
Carpenter (Special) Each 0.50 205.00 102.50Rs.
Fitter(Secial) Each 1.00 205.00 205.00Rs.
Man Mulia Each 2.00 150.00 300.00Rs.
2 % sundries and T&P etc. 7.47Rs.
Total 614.97Rs.
Rate per 1 Sqm 66.13Rs.
19.
Data for 0.508 Qntl.
Labour
Sangi Mulia for conveying joist from outside to the
buildings. Each 0.25 170.00 42.50Rs.
Sangi Mulia for lifting joists up to top of the walls
with ropes, etc. Each 0.75 170.00 127.50Rs.
Man Mulia for placing joists in position Each 0.17 150.00 25.50Rs.
2% Scaffolding ropes, Sundries, T&P etc. 2.37Rs.
Total 197.87Rs.
Rate per 1 Qntl. 389.51Rs.
20. White washing 3 coats with shell lime per 1 Sqm
Data for 93 Sqm.
Material
Shell lime unslaked Kg 23.32 16.00 373.12Rs.
LabourPainter (2nd class) Each 1.50 190.00 285.00Rs.
Man Mulia Each 1.00 150.00 150.00Rs.
808.12Rs.
Rate per 1 Sqm. 8.69Rs.
Submitted by
Range Officer
Kalunga(KL) Range
20 mm thick cement plaster [1:6] over stone masonary per sqm.
Hoisting joists and trusses and placing in position (labour only) Per 1
Qntl.
Labour for fixing G.C.I. Sheet in roof drilling hole in wind ties including
fixing of ridges valleys wind ties etc. excluding cost of fitting per 1
Sqm.