  • piScama xao~Iya Baar p`oYaNa koMd` kI

    2016 maah kI p`NaalaI p`caalana irpaoT-

    System Operation Report Of Western

    Region

    For the month of

    July -2016

    Paavar isasTma Aa^prooSana karpaorooSana ilaimaToD

    (pavariga`D kI ek pUUNa- svaaima%va vaalaI kMpnaI)

    piScama xaoi~ya Baar p`oYaNa kond `,mauumba[- Power System Operation Corporation Ltd. (A wholly owned subsidiary company of POWERGRID)

    Western Regional Load Despatch Centre,Mumbai

  • INDEX

    *HIGHLIGHTS OF WR GRID

    *SUMMARY REPORT

    HIGHLIGHTS OF THE WR GRID

    INSTALLED CAPACITY

    POWER SUPPLY POSITION

    WR DEMAND AND ENERGY CONSUMPTION

    SEASONAL VARIATION

    FREQUENCY PROFILE

    VOLTAGE PROFILE

    ADDITION OF NEW ELEMENTS

    a) GENERATING UNITS b) TRANSMISSION LINES c) LINE /BUS REACTORS AND ICTS

    SCHEDULE Vs DRAWAL

    UNIT OUTAGES

    GENERATION

    INTERREGIONAL EXCHANGE

    REVISED AUFLS SCHEME

    PROGRESS OF NEW GENERATION AND TRANSMISSION PROJECTS

    OPEN ACCESS TRANSACTIONS

    LIST OF GRID INCIDENCES AND DISTURBANCES

    * ANNEXURES

    LOAD DURATION CURVE

    FREQUENCY DURATION CURVE

    LOAD CURVE ON PEAK DEMAND DAY AND MINIMUM DEMAND DAY

    UNITWISE INSTALLED CAPACITY

    ANGULAR SEPARATION VIOLATION

    ATC/TTC VIOLATION ATC VIOLATION (CONGESTION WARNING NOTICES)

  • Highlights of WR Grid in the month of

    July -2016

    Power Supply Position:

    (i) Unrestricted Demand: The maximum unrestricted Demand was 40931 MW at 20:00 Hrs

    on 25TH July16 which was 9.94% less as compared to last year (45448 MW). Average

    peak unrestricted demand was 35715 MW which was 6.45% less than the last year

    July15 (38178MW).

    (ii) Peak Demand Met: Western Region has met peak demand of 40641 MW at 20:00hrs on

    25.07.2016. It was 9.29 % less as compared to July15 (44803 MW) & 11.71% less as

    compared to June16 (46031 MW). Average Demand Met (35705 MW) was reduced by

    6.13 % compared to last year (38037 MW). ESIL achieved so far highest demand met of

    786 MW.

    (iii) Total Energy Consumption was 26564 MUs in the month of July16 at the average of 857 MUs/day & Maximum was 915 MUs on 25.07.16. Average Energy consumption was reduced by 6.13 % w.r.t. last year (913 MUs).

    (iv) Total Energy requirement was 26572 MUs at the average of 857 MUs/day & Maximum was 915 MUs on 25.07.16. Average energy requirement reduced by 6.45% compared to last year of same month (916 MUs).

    Frequency Profile: Despite of low demand and high renewable generation, very good frequency profile achieved in the month of Juy16. System frequency was in IEGC band (49.9

    50.05 Hz) for 72.30 % of time in the month and achieved for 83.36% (so far highest) of the time

    on 19th July 2016. There was sustained period of frequency close to 50 Hz. From 19th to 24th

    July16, Frequency Variation Index(FVI) was between the range of 0.02 to 0.03. Average

    frequency deviation index was 0.28 for the month of July16.

    Maximum frequency of 50.35 Hz was observed on 2nd July at 07:59:40 hrs due to load crash of

    approx 10000 MW in NR. Minimum frequency of 49.69 Hz was observed on 7th July at

    21:42:10 hrs due to demand pick up in NR. Average frequency of the grid was 50.01 Hz.

    Voltage Profile: High voltage was observed due to monsoon period in so many nodes of 400 KV of Western Region. More than 50% of time voltage greater than 420 KV was observed

    at Mapusa, Parli, Dhule, Wardha and Raipur and highest of 85.49% of time observed at

    Raigarh.

    Element Addition in July16 into the WR Grid:

    Total 1048MW generation capacity added into the grid. No Transmission elements added in

    the month of July16.

    Hydro Generation: Hydro generation in the month of July16 was 1745 MUs at the

    average of 56 MUs/day. Hydro generation increased by 143% compared to last month (509) MUs). Max Hydro generation was 68.88 Mus on 25th July16.

  • Wind Generation: Total wind generation in the month was 2320 Mus at the average of 74.84 MUs/day in the month of July16. Wind Generation was reduced by 2.2% compared to

    last month (2373 MUs). In this month, Maharashtra has generated its so far highest wind power

    of 2556MW on 9th July 2016 at 21:00 hrs. In Western region, the maximum wind generation of

    6207 MW was observed on 9th July2016 at 14:00 hrs.

    Solar Generation: Solar Generation of 212 Mus generated in the month of July16 at the average of 6.36 MUs/day compared to 257 MUs in last month (average of 9.09 Mus/day).

    Open Access: Total 685 Nos. Intra-regional & Inter-regional short term open access transactions approved and 1146 Mus energy approved in the month July16.

  • Installed Capacity of Western Region

    Source: CEA website

    INSTALLED GENERATION CAPCITY OF THE STATES INCLUDING SHARES AS ON 31.07.2016

    (All fig. in MW)

    State O wnership Hydro Coal Gas Nuclear Total Diesel RES Total

    Gujarat State 772.00 5220.00 2321.82 0.00 8313.82 0.00 8.00 8322

    Private 0.00 8642.00 4060.00 0.00 12702.00 0.00 5292.72 17995

    Central(firm allo) 0.00 2888.62 424.27 559.32 3872.21 0.00 0.00 3872

    Total 772 16751 6806 559 24888 0 5301 30189

    Madhya Pradesh State 1703.66 4080.00 0.00 0.00 5783.66 0.00 83.96 5868Private 0.00 5389.00 0.00 0.00 5389.00 0.00 3120.07 8509

    Central(firm allo) 1520.00 2490.05 257.18 273.24 4540.47 0.00 0.00 4540

    Total 3224 11959 257 273 15713 0 3204 18917

    Chhattisgarh State 120.00 3280.00 0.00 0.00 3400.00 0.00 11.05 3411

    Private 0.00 10598.00 0.00 0.00 10598.00 0.00 438.63 11037Central(firm allo) 0.00 1574.54 0.00 47.52 1622.06 0.00 0.00 1622

    Total 120 15453 0 48 15620 0 450 16070

    Maharashtra State 2884.84 10550.00 672.00 0.00 14106.84 0.00 208.13 14315

    Private 447.00 11796.00 180.00 0.00 12423.00 0.00 6446.39 18869

    Central(firm allo) 0.00 3712.26 2623.93 690.14 7026.33 0.00 0.00 7026

    Total 3332 26058 3476 690 33556 0 6655 40211

    Goa State 0.00 0.00 0.00 0.00 0.00 0.00 0.05 0.05

    Private 0.00 0.00 48.00 0.00 48.00 0.00 0.00 48.00

    Central(firm allo) 0.00 338.60 0.00 25.80 364.40 0.00 0.00 364.40

    Total 0.00 338.60 48.00 25.80 412.40 0.00 0.05 412.45

    DD State 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Private 0.00 0.00 0.00 0.00 0.00 0.00 4.00 4.00Central(firm allo) 0.00 43.38 4.20 7.38 54.96 0.00 0.00 54.96Total 0.00 43.38 4.20 7.38 54.96 0.00 4.00 58.96

    DNH State 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Private 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Central(firm allo) 0.00 54.22 27.10 8.46 89.78 0.00 0.00 89.78

    Total 0.00 54.22 27.10 8.46 89.78 0.00 0.00 89.78

    WR State 5480.50 23130.00 2993.82 0.00 31604.32 0.00 311.19 31915.51

    Private 447.00 36425.00 4288.00 0.00 41160.00 0.00 15003.73 56163.73

    Central(firm allo)* 1520.00 12898.01 3533.59 1840.00 19791.60 0.00 0.00 19791.60

    Unallocated 0.00 1796.35 196.91 228.14 2221.40 0.00 0.00 2221.40

    Total 7448 72453 10815 1840 92556 0 15315 108169

    idnaa Mk 31.07.2016 ka o rajyaana usaar sa Msqaaipt xamata

  • - POWER SUPPLY POSITION JULY-2016 Energy Requirement and Availability

    Constituent

    July'16 April'16 to July'16

    Requirement

    (MUs)

    Availability

    (MUs)

    Shortage

    (%)

    Requirement

    (MUs)

    Availability

    (MUs)

    Shortage

    (%)

    Gujarat 8350 8353 -0.04 36649 36642 0.02 Madhya

    Pradesh

    4340 4339 0.04 19762 19746 0.08

    Chattisgarh

    2319 2311 0.32 9470 9440 0.32

    Maharashtra

    10599 10599 0.00 48673 48625 0.10

    Goa 257 257 0.00 1120 1119 0.10 D&D

    202 202 0.00 816 816 0.00

    DNH

    516 516 0.00 2036 2034 0.09

    ESIL

    329 329 0.00 1310 1310 0.03

    Western Region

    26913 26907 0.02 119836 119731 0.09

    * Chhatisgarh energy consumption is including BSP-SAIL consumption

  • b. Peak Demand / Demand Met(MW)

    Constituent Requirement (MW) Availability (MW) Shortage(%)

    Gujarat 13062 13067 -0.04 Madhya Pradesh

    6957 6936 0.30

    Chattisgarh 3582 3543 1.09 Maharashtra 16480 16463 0.10 Goa 456 456 0.00 D&D 313 313 0.00 DNH

    745 745 0.00

    ESIL 786 786 0.00 Western Region

    40931 40641 0.71

    **Regional demand met is the simultaneous demand met and not the sum of demand met by constituent.

    c. So Far Highest Demand of WR and its Constituents So Far Highest

    Constituent

    Requirem

    ent (MW)

    Availability

    (MW)

    Shortage

    (%)

    So Far Highest Requirement Date

    and Time

    So Far Highest Availability Date and

    Time

    Gujarat 15179 15142 0.24 Max on 19.05.16 at 15:00 hrs

    Max on 19.05.16 at 15:00 hrs

    Madhya Pradesh

    11114 11114 0.00 Max on 25.12.15

    at 11:00 hrs Max on 25.12.15 at

    11:00 hrs

    Chattisgarh

    4092 4073 0.46 Max on 22.02.16

    at 19:00 hrs Max on 21.04.16 at

    01:00 hrs

    Maharashtra

    21443 21064 1.77 Max on 19.10.15

    at 12:00 hrs Max on 19.10.15 at

    12:00 hrs

    Goa 534 505 5.43 Max on 03.05.16 at 16:00 hrs

    Max on 28.04.15 at 19:00 hrs

    D&D

    324 324 0.00 Max on 11.06.16

    at 16:00 hrs Max on 11.06.16 at

    16:00 hrs

    DNH

    781 781 0.00 Max on 13.06.16

    at 18:00 hrs Max on 13.06.16 at

    18:00 hrs

    ESIL

    786 786 0.00 Max on 31.07.16

    at 20:00 hrs Max on 31.07.16 at

    20:00 hrs

    Western Region

    50379 49938 0.88 Max on 19.10.15

    at 15:00 hrs Max on 19.10.15 at

    15:00 hrs

  • . . / WR Demand-

    State Catered UNSCH

    LS+SCH

    LS

    Frequency

    Correction

    Power

    Cut

    Total Date Time Frequency

    idva dmaNa DD

    pMjaIkRt Registered 313 - - - 313 08.07.2016 10:00:00 49.93

    dadra nagar hvaolaI DNH

    pMjaIkRt Registered 745 - - - 745 04.07.2016 19:00:00 49.98

    gaaov aa GOA

    pMjaIkRt Registered 456 - - - 456 11.07.2016 11:00:00 50.02

    AsaIimat Unrestricted 456 0.00 -0.32 0.00 456 11.07.2016 11:00:00 50.02

    [esaAayaela ESIL

    pMjaIkRt Registered 786 - - - 786 31.07.2016 20:00:00 49.93

    gaujarat GUJARAT

    pMjaIkRt Registered 13067 - - - 13067 25.07.2016 16:00:00 50.01

    AsaIimat Unrestricted 13067 0 -4.57 0 13062 25.07.2016 16:00:00 50.01

    C

  • Demand Met -16 -16 -15 % Change w.r.t last month

    % Change

    w.r.t last Year

    Average 35705 40676 38037 -12.22 -6.13

    Max 40641 46031 44803 -11.71 -9.29

    Date when Max. 25-Jul-16 7-Jun-16 15-Jul-15 ~ ~

    Seasonal Variation

    Day-wise Demand Plot-

  • Daily Energy Consumption

    Energy

    Consumption

    MU/Day

    -16 -16 -15 % Change w.r.t last month

    % Change w.r.t

    last Year

    Average 857 976 913 -12.22 -6.13

    Max 915 1039 1032 -11.92 -11.34

    Date When Max. 25-Jul-16 1-Jun-16 15-Jul-15 ~ ~

  • Frequency Profile- Day-wise Frequency band- July16

    Date

    Frequency (%)

    FVI

    (i) (ii) (iii) Frequency (Hz)

    50.05

    % of time

    the

    frequency

    remained

    out of

    IEGC band

    No of hours

    during which

    frequency was

    out of range

    during the

    day[(i) x24Hrs]

    Daily

    FDI=(ii)/2

    4 Max. Min. Avg.

    1-Jul 1.90 78.17 19.93 0.03 21.83 5.24 0.22 50.17 49.82 50.01

    2-Jul 1.64 56.27 42.09 0.07 43.73 10.50 0.44 50.35 49.83 50.04

    3-Jul 2.89 58.80 38.31 0.05 41.20 9.89 0.41 50.19 49.71 50.03

    4-Jul 8.30 70.27 21.43 0.05 29.73 7.14 0.30 50.17 49.74 50.00

    5-Jul 10.25 76.66 13.09 0.04 23.34 5.60 0.23 50.22 49.76 49.99

    6-Jul 6.62 68.76 24.62 0.04 31.24 7.50 0.31 50.19 49.75 50.01

    7-Jul 17.95 72.80 9.25 0.07 27.20 6.53 0.27 50.12 49.69 49.96

    8-Jul 6.49 76.08 17.43 0.04 23.92 5.74 0.24 50.16 49.80 50.00

    9-Jul 1.38 71.25 27.37 0.03 28.75 6.90 0.29 50.21 49.83 50.02

    10-Jul 0.11 64.26 35.63 0.03 35.74 8.58 0.36 50.20 49.87 50.02

    11-Jul 0.44 70.65 28.91 0.03 29.35 7.04 0.29 50.19 49.88 50.02

    12-Jul 0.44 70.65 28.91 0.03 29.35 7.04 0.29 50.19 49.88 50.02

    13-Jul 3.34 76.68 19.98 0.03 23.32 5.60 0.23 50.19 49.69 50.00

    14-Jul 8.10 75.92 15.98 0.06 24.08 5.78 0.24 50.17 49.76 49.99

    15-Jul 7.87 73.18 18.95 0.04 26.82 6.44 0.27 50.19 49.78 49.99

    16-Jul 1.79 65.32 32.89 0.04 34.68 8.32 0.35 50.19 49.84 50.02

    17-Jul 0.22 52.56 47.22 0.05 47.44 11.39 0.47 50.21 49.87 50.05

    18-Jul 2.19 63.16 34.65 0.04 36.84 8.84 0.37 50.21 49.74 50.02

    19-Jul 1.83 83.36 14.81 0.02 16.64 3.99 0.17 50.21 49.98 50.02

    20-Jul 2.89 82.25 14.86 0.03 17.75 4.26 0.18 50.18 49.84 50.00

    21-Jul 1.62 76.09 22.29 0.02 23.91 5.74 0.24 50.14 49.86 50.01

    22-Jul 1.28 78.84 19.88 0.03 21.16 5.08 0.21 50.19 49.86 50.01

    23-Jul 4.48 82.19 13.33 0.03 17.81 4.27 0.18 50.18 49.73 49.99

    24-Jul 3.61 77.07 19.32 0.03 22.93 5.50 0.23 50.21 49.84 50.00

    25-Jul 12.51 78.29 9.20 0.05 21.71 5.21 0.22 50.14 49.72 49.97

    26-Jul 4.32 77.50 18.18 0.03 22.50 5.40 0.23 50.21 49.77 50.00

    27-Jul 1.35 76.64 22.00 0.03 23.36 5.61 0.23 50.16 49.85 50.01

    28-Jul 2.34 78.37 19.29 0.05 21.63 5.19 0.22 50.25 49.84 50.00

    29-Jul 0.17 65.53 34.29 0.03 34.47 8.27 0.34 50.17 49.89 50.03

    30-Jul 1.61 72.86 25.53 0.03 27.14 6.51 0.27 50.19 49.83 50.02

    31-Jul 0.60 70.96 28.44 0.03 29.04 6.97 0.29 50.35 49.69 50.01

    Max 17.95 83.36 47.22 0.07 47.44 11.39 0.47 50.35 (Max)

    49.69 (Min)

    50.01 (Avg) Avg 3.89 72.30 23.81 0.04 27.70 6.65 0.28

    WR monthly FDI is 0.28

  • Frequency Profile -July16

    Voltage Profile (Important Nodes) - July16

    Voltage Deviation Index (VDI) - 765 kV Substations

    S.No

    Station Name

    Voltage (in Volts) Voltage (in % of

    Time) Voltage (in

    Time) Total no. of hours out of IEGC range (HH:MM) (iii) (i+ii)

    Voltage Deviation

    Index (iii)/(Total

    No. of Hours in a

    Week)

    Max Voltage

    Min Voltage

    800 kV

    No. of hours below IEGC

    (i) 800 kV

    1 Sipat 780 726 0.00 100.00 0.00 0:01 0:00 0:01 0.00

    2 Seoni 800 727 0.00 100.00 0.00 0:01 0:00 0:01 0.00

    3 Wardha 807 760 0.00 97.97 2.03 0:00 15:04 15:04 0.02

    4 Bina 803 747 0.00 99.82 0.18 0:00 1:21 1:21 0.00

    5 Indore 798 745 0.00 100.00 0.00 0:00 0:00 0:00 0.00

    6 Sasan 785 751 0.00 100.00 0.00 0:00 0:00 0:00 0.00

    7 Satna 798 745 0.00 100.00 0.00 0:00 0:00 0:00 0.00

    8 Tamnar 804 775 0.00 98.14 1.86 0:00 13:49 13:49 0.02

    9 Kotra 806 776 0.00 92.78 7.22 0:00 53:41 53:41 0.07

    10 Vadodara 801 753 0.00 99.97 0.03 0:00 0:12 0:12 0.00

    11 Durg 801 761 0.00 99.82 0.18 0:00 1:22 1:22 0.00

    12 Gwalior 804 744 0.00 99.09 0.91 0:00 6:48 6:48 0.01

  • Voltage Deviation Index (VDI) - 400 kV Substations

    S.No

    Station Name

    Voltage (in Volts) Voltage

    (in % of Time) Voltage

    (in Time) Total no. of hours out of IEGC range (HH:MM) (iii) (i+ii)

    Voltage Deviation Index

    (iii)/(Total No. of Hours

    in a Week)

    Max Voltage

    Min Voltage

    420 kV

    No. of

    hours belo

    w IEGC

    (i) 420 kV

    1 Bhopal 424 396 0.00 99.30 0.70 0:00 5:12 5:12 0.01

    2 Khandwa 433 388 0.00 61.61 38.39 0:00 285:38 285:38 0.38

    3 Itarsi 422 394 0.00 99.81 0.19 0:00 1:24 1:24 0.00

    4 Damoh 428 401 0.00 96.27 3.73 0:00 27:47 27:47 0.04

    5 Nagda 429 402 0.00 86.46 13.54 0:00 100:44 100:44 0.14

    6 Indore 427 397 0.00 96.66 3.34 0:00 24:52 24:52 0.03

    7 Gwalior 417 383 0.00 100.00 0.00 0:00 0:00 0:00 0.00

    8 Raipur 429 400 0.00 44.64 55.36 0:00 411:54 411:54 0.55

    9 Raigarh 427 413 0.00 14.51 85.49 0:00 636:01 636:01 0.85

    10 Bhilai 425 409 0.00 72.37 27.63 0:00 205:34 205:34 0.28

    11 Wardha 429 409 0.00 47.41 52.59 0:00 391:15 391:15 0.53

    12 Dhule 435 402 0.00 45.09 54.91 0:00 408:31 408:31 0.55

    13 Parli 435 400 0.00 41.58 58.42 0:00 434:40 434:40 0.58

    14 Boisar 423 397 0.00 96.84 3.16 0:00 23:29 23:29 0.03

    15 Kalwa 431 379 0.00 70.25 29.75 0:01 221:20 221:21 0.30

    16 Karad 436 400 0.00 60.76 39.24 0:00 291:55 291:55 0.39

    17 Asoj 418 395 0.00 100.00 0.00 0:00 0:00 0:00 0.00

    18 Dehgam 432 404 0.00 84.06 15.94 0:00 118:35 118:35 0.16

    19 Kasor 423 404 0.00 99.30 0.70 0:00 5:13 5:13 0.01

    20 Jetpur 421 400 0.00 99.98 0.02 0:00 0:09 0:09 0.00

    21 Amreli 423 402 0.00 97.96 2.04 0:00 15:11 15:11 0.02

    22 Vapi 417 386 0.00 100.00 0.00 0:00 0:00 0:00 0.00

    23 Mapusa 438 385 0.00 46.44 53.56 0:00 398:28 398:28 0.54

    24 Kala 414 387 0.00 100.00 0.00 0:00 0:00 0:00 0.00

    25 Magarwada 417 387 0.00 100.00 0.00 0:00 0:00 0:00 0.00

    26 Hazira 420 376 0.01 99.92 0.06 0:05 0:29 0:34 0.00

  • Commissioning of New Elements

    a)Generating Units

    Sl. No.

    State/ISGS/IPP Station Name Capacity (MW)

    Unit Date of Synchronization

    Date of COD

    1 MAH/MSPGCL Koradi ( Thermal) 660 10 01.07.2016 -

    2 MAH/IPP- PGPL Pioneer Gas Pvt Ltd.

    ( Gas) 262 1 06.07.2016 -

    3 MAH/IPP- PGPL Pioneer Gas Pvt Ltd.

    ( Gas) 126 2 08.07.2016 -

    Total 1048 MW

    b)Transmission Lines- Nil

    c)ICTs - Nil

    d)Line Reactor- Nil

    e)Bus Reactor- Nil

    Schedule Vs Drawal of Western Region-

    Schedule and Drawal Of Constituents from Central sector July-2016

    Sl. State/U.T/ Schedule Actual Drawal Total Over (+)/Under No. System (Mus) (MUs) (-)drawal

    (MUs)

    1 Gujarat 2147 2066 -82

    2 Madhya Pradesh 3322 3284 -39

    3 Chattisgarh 3816 3852 36

    4 Maharashtra 674 721 47

    5 Goa 245 247 2

    6 D&D 197 207 9

    7 DNH 523 511 -11

    8 ESIL 307 309 2

    9 Western Region 11232 11197 -35

  • Generation Outages: Planned outages are more due to low demand in monsoon period.

    UNIT OUTAGES (in MW) IN JULY-16

    DATE PLANNED OUTAGE

    FORCED OUTAGE

    TOTAL OUTAGE-July'16

    TOTAL OUTAGE-June'16

    1-Jul-16 14953 16167 31120 31710

    2-Jul-16 15369 17432 32801 29510

    3-Jul-16 17843 18097 35940 28656

    4-Jul-16 18095 17297 35392 29348

    5-Jul-16 19055 17097 36152 30040

    6-Jul-16 19411 16797 36208 28665

    7-Jul-16 19605 17915 37520 30909

    8-Jul-16 19384 17527 36911 30064

    9-Jul-16 18991 19422 38413 30824

    10-Jul-16 18991 18427 37418 29219

    11-Jul-16 17831 18462 36293 30123

    12-Jul-16 18987 18112 37099 32305

    13-Jul-16 19799 20359 40158 31645

    14-Jul-16 20352 18259 38611 31605

    15-Jul-16 19632 19781 39413 32375

    16-Jul-16 19078 19209 38287 31421

    17-Jul-16 19078 17644 36722 32237

    18-Jul-16 19198 17814 37012 31987

    19-Jul-16 20188 18024 38212 32212

    20-Jul-16 20398 17914 38312 33414

    21-Jul-16 20398 16579 36977 31881

    22-Jul-16 20198 16314 36512 29792

    23-Jul-16 20044 17057 37101 29947

    24-Jul-16 19169 15969 35138 30552

    25-Jul-16 19267 15666 34933 31304

    26-Jul-16 18494 15494 33988 31044

    27-Jul-16 18914 14594 33508 31042

    28-Jul-16 18914 14594 33508 32202

    29-Jul-16 20090 16095 36185 33810

    30-Jul-16 19572 16413 35985 31120

    31-Jul-16 18712 15720 34432

    MAX 20398 20359 40158 33810

    AVG 19033 17298 36331 31032

  • Generation of Western Region July16

    Fuel Wise Generation(in Mus) of Western Region July 2016

    Note- RES generation is only Wind and Solar generation

  • Renewables in WR-

    Wind Generation:

    Highest Wind generation (as on 31.07.2016)

    State Gen (in MW) Date & Time

    Maharashtra 2556 9th

    July 2016 at 21:00 hrs

    Gujarat 3114 15th June 2016 at 09:00 hrs

    MP 1287 14th June 2016 at 08:00 hrs

    WR 6431 15th June 2016 at 09:00 hrs

  • Solar Generation:

    So Far Highest Solar Generation on 20.03.2016- 1643 MW at 13:00 hrs.

    WR Average Solar

    Gen 7Mus/days

  • Net load Curve when RES(wind and Solar) Generation was max-

  • WR constituent- Reservoir Level in feet(Max in the Month)-

    Madhya Pradesh

    Gujarat Maharashtra

    GandhiSagar Indira sagar

    Ukai Kadana SSP Koyna

    FRL- 1312 ft MDDL - 1250 ft

    FRL- 860 ft MDDL - 798 ft

    FRL- 345 ft MDDL - 270 ft

    FRL- 419 ft MDDL - 374 ft

    FRL- 455 ft MDDL - 363 ft

    FRL- 2158 ft MDDL - 2000 ft

    Apr'16 1289 821 298 385 384 2069

    May16 1286 813 286 379 394 2038

    Jun'16 1284 810 284 373 393 2035

    Jul'16 1289 849 321 396 389 2118

    Interregional Exchange of Western Region

    Import = (+) , Export = (-)

  • Net IR exchange Apr16 to July16-

  • REVISED AUFLS SETTING OF WR:

    DF/DT Scheme

    Progress of Ongoing Generation Projects in Western Region

    Name of the Power Projects Unit No. Capacity (MW)

    Date of Commissioning /Schedule Date

    GUJARAT

    CHHATTISGARH

    Marwa 1 500 COD on 31.03.2016

    Marwa 2 500 Synchronized on 02.03.2016

    MAHARASHTRA

    CHANDRAPUR 9 500 Commissioned on 21.03.2016.

    KORADI 10 660 Synchronized on 01.07.2016

    PARLI 8 250 Commissioned on 03.03.2016.

    MADHYA PRADESH

    Moser Baer (Hindustan Power) 2 600

    Commissioned on 07.04.2016, COD on 03.05.2016.

    Essar Power MP Limited (Mahan) 2 600 Aug2016

    CENTRAL SECTOR/IPP

    KSK 4 600 Aug 2016

    Western Region

    States

    Required

    Load relief

    (Avg.)

    Implemented

    Load relief

    (Avg.)

    Required

    Load relief

    (Avg.)

    Implement

    ed Load

    relief

    (Avg.)

    Required

    Load

    relief

    (Avg.)

    Implement

    ed Load

    relief

    (Avg.)

    Required

    Load

    relief(Avg.)

    Implemen

    ted Load

    relief

    (Avg.)

    GUJARAT 580 773 580 726 580 1117 590 1025

    MADHYA PRADESH 460 468 460 450 460 460 465 490

    CHATTISGARH 150 110 150 114 155 117 155 91

    MAHARASHTRA 805 1122 810 1215 815 1044 820 1071

    GOA 25 25 25 25 25 25 25 25

    UT: DD 10 10 15 15 15 16 15 15

    UT: DNH 30 30 30 30 35 35 35 35

    Total load relief 2060 2537 2070 2575 2085 2814 2105 2752

    Stage - I 49.2 Hz Stage - II 49.0 Hz Stage - III 48.8 Hz Stage - IV 48.6 Hz

    DF/DT Scheme in Western Region

    Stage - I 49.9/0.1 Hz/sec Stage - II 49.9/0.2 Hz/sec Stage - III 49.9/0.4 Hz/sec

    STATERequired

    Load relief

    Implemented

    Load relief

    Required

    Load relief

    Implemented

    Load relief

    Required

    Load relief

    Implemented

    Load relief

    GUJARAT 0 0 1383 1454 1529 1610

    MADHYA PRADESH 361 475 355 415 392 445

    CHATTISGARH 27 120 37 40 120 40

    MAHARASHTRA 546 370 621 1131 686 522

    **TPC 60 60 82 82 273 273

    Total load relief 994 1025 2478 3122 3000 2890

    * Gujarat additional df/dt setting at 49.9Hz & 0.3Hz/sec = 399 MW.

    ** TPC additional df/dt setting at 49.9 Hz/0.5 Hz/sec = 931 MW

  • KSK 5 600 Aug 2016

    RKM 3 360 Aug 2016

    RKM 4 360 August 2016

    KAPS 3 700 August 2016

    KAPS 4 700 August 2016

    LARA 1 800 Sept 2016

    LARA 2 800 Sept 2016

    Status of Ongoing Transmission Projects in Western Region

    Sr. No.

    Constituents Name of Transmission line Length in Ckt

    Km

    Anticipated completion Target

    Remark

    1 GETCO 400 kV D/C Vadinar-Amreli line 239 Dec 2016

    WIP

    2 GETCO 400kV Mundra-Hadala LILO to Halvad

    89.40 Dec 2016

    Re tenderized; LOI issued on

    13.06.2016.

    3 GETCO 400 kV D/C Amreli-Kasor line 470 Mar 2017 W I P / Severe RoW

    problems

    4 GETCO 400 kV Charanka-Veloda 199 Dec 2016

    -

    5 GETCO

    400 KV Kosamba- Achhalia 140 Mar 2017

    -

    6 GETCO LILO of 400 KV Essar-Hadala

    line at Kalavad S/S 100

    Dec 2016 WIP

    7 GETCO LILO of 400 KV Kasor-Amerli line

    at Fedra 80

    Oct 2016 WIP

    8 GETCO LILO of 400 KV Mundra (Adani)-

    Zerda line at Sankhari 200

    Jan 2017 WIP

    9 GETCO

    400 KV Vadavi-Halvad 240 Dec 2016

    WIP

    10 MSETCL 400 kV Bableshwar-Kudus

    D/C (Quad) 447 Dec 2017 -

    11 MSETCL

    400 KV Jejuri - Hinjewadi -I 93 June 2017

    -

    12 MSETCL

    400 KV Jejuri - Hinjewadi -II 114 June 2017

    -

    13 MSETCL

    400 KV Koradi-II - Koradi-III 76 Sept-16

    -

    14 CSPTCL 400 kV DCDS Raipur(Raita)-Jagdalpur(DCDS)

    658 Dec- 16

    -

    15 CSPTCL 220 KV D/C Korba (E) -

    Vishrampur (2nd Ckt.) 155

    Sept-16 -

  • Sr. No.

    Constituents Name of Transmission line Length in Ckt

    Km

    Anticipated completion Target

    Remark

    16 POWERGRID 400 KV D/C Aurangabad -Boisar line (Quad)

    700 Dec- 16

    -

    17 POWERGRID 400 kV Vapi Kudus D/C Line 236 May- 17 ROW/Forest

    problem

    18 POWERGRID 765 kV Wardha Nizamabad- Hyderabad D/C

    1032 May-18 -

    19 POWERGRID 765 kV Aurangabad(PG)-Padghe(PG) D/C

    560 Mar-19

    -

    20 POWERGRID 400 KV Khandwa-Indore 360 Sept16

    21 POWERGRID 800 kV HVDC Champa-Kurukshetra Bipole

    2573 Nov-16 -

    22 STERLITE(JTCL) 400 kV Sujalpur - RAPP (IR by RTCL)

    310 Sept-16 I dl e charged from

    Sujalpur end.

    OPEN ACCESS TRANSACTION DETAILS

    WRLDC AS NODAL

    1. CATEGORISED ON THE BASIS OF 'TRANSACTION TYPE'

    No. of approvals

    -

    16 -16 -16 -16 -16

    -16

    -16

    -16

    -16

    -17

    -17

    -17

    TOTAL

    Day Ahead 119 135 94 183 531

    Contingency 326 88 105 235 754

    FCFS 188 212 295 263 958

    Advance 8 9 4 4 25

    TOTAL 641 444 498 685 0 0 0 0 0 0 0 0 2268

    Energy approved (MUs)

    -16 -16 -16 -16

    -16

    -16

    -16

    -16

    -16

    -17

    -17

    -17 TOTAL

    Day Ahead 82.43 291.66 58.89 235.07 668.04

    Contingency 86.75 84.40 163.27 200.51 534.94

    FCFS 527.82 761.65 690.20 658.65 2638.33

    Advance 310.66 86.02 140.74 51.26 588.68

    TOTAL 1007.66 1223.74 1053.1 1145.5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4429.99

    2. CATEGORISED ON THE BASIS OF INTRA/INTER REGIONAL TRANSACTIONS

    No. of approvals

    -

    16 -16 -16 -16 -16

    -16

    -16

    -16

    -16

    -17

    -17

    -17

    TOTAL

    Intra-regional

    602 426 420 610 2058

    Inter-regional

    39 18 78 75 210

    TOTAL 641 444 498 685 0 0 0 0 0 0 0 0 2268

    Energy Approved (MUs)

    -

    16 -16 -

    16 -16 -

    16

    -16

    -16

    -16

    -16

    -17

    -17

    -17 TOTAL

    Intra-regional

    878.58 1070.22 884.25 996.34 3829.39

    Inter-regional

    129.08 153.52 168.85 149.16 600.60

    TOTAL 1007.66 1223.74 1053.1

    0 1145.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4429.99

  • 0

    100

    200

    300

    400

    500

    600

    700

    800

    Day Ahead Contingency FCFS Advance

    Mu

    s

    Energy Approved in 2016-17

    -16 -16 -16 -16

  • List of Grid Disturbances and Grid incidents (GD/GI) in July-2016: Western Region

    Details of Grid Disturbance (GD) during the Month of (July 2016), in _Western_Region

    Sl

    No.

    Category of

    Grid

    Disturbance Affected

    Area

    Time and

    Date of

    occurrence

    of Grid

    Disturbance

    Time and

    Date of

    Restoration

    Duration

    Loss of

    generation /

    loss of load

    during the

    Grid

    Disturbance

    Brief details of the

    event ( pre fault

    and post fault

    system conditions)

    ( GD-I to

    GD-V) (MW)

    1 GI-2 Kansari 12-07-16,

    01:24:00

    12-07-16,

    05:30:00 04:06

    Load Loss: NIL,

    Generation Loss: NIL

    Tripping of

    1. 400/220 kV

    ICT-I & II

    2. 220kV Kansari-

    Palampur-II

    3. 220kV Kansari-

    Jangral-I & II

    4. 220kV Kansari-

    Deodhar-II

    5. 220kV Kansari-

    Thavar-I & II

    6. 220kV Kansari-

    Tharad S/C

    due to Bus Bar

    protection operated

    at 220kV Kansari

    Bus-I

    2 GI-2 Varsana 12-07-16,

    20:29:00

    13-07-16,

    11:51:00 15:23

    Load Loss: NIL,

    Generation Loss: NIL

    Tripping of

    1. 400 kV Varsana-

    APL Mundra-I

    2. 400 kV Varsana-

    Bachua-I

    3. 400/220 kV

    ICT-III

    4. 400 kV 50

    MVAr BR

    due to 400kV Bus

    Bar Protection of

    Bus-I Operated at

    Varsana

    3 GD-1 Varsana 12-07-16,

    21:50:00

    13-07-16,

    09:10:00 11:40

    Load Loss: NIL,

    Generation Loss: NIL

    Tripping of

    1. 400 kV Varsana-

    APL Mundra-II

    2. 400 kV Varsana-

    Bachua-II

    3. 400/220 kV

    ICT-I & II

    4. 400 kV Varsana-

    Kansari-I

    due to 400kV Bus

    Bar Protection of

  • Bus-II Operated at

    Varsana

    4 GI-2 Kansari 12-07-16,

    13:21:00

    12-07-16,

    14:15:00 00:54

    Load Loss: NIL,

    Generation Loss: NIL

    Tripping of

    1. 400/220 kV

    ICT-II & III

    2. 220kV Kansari-

    Palampur-II

    3. 220kV Kansari-

    Jangral-I & II

    4. 220kV Kansari-

    Deodhar-II

    5. 220kV Kansari-

    Thavar-I & II

    6. 220kV Kansari-

    Tharad S/C

    due to Bus Bar

    protection operated

    at 220kV Kansari

    Bus-II

    5 GD-1

    Mundra

    and

    Bachua

    13-07-16,

    02:37:00

    13-07-16,

    03:11:00 00:34

    Load Loss: NIL,

    Generation Loss: 2820

    MW

    Tripping of

    1. 400 kV CGPL-

    Jetpur 1

    2. 400 kV CGPL-

    Jetpur 2

    3. 400 kV CGPL-

    Chorania S/C

    4. 400 kV CGPL-

    Mansar S/C

    5. 400 kV CGPL-

    Bacchau-1

    6. 400 kV CGPL-

    Bacchau-2

    7. 400 kV

    Bacchau-Vadavi 1

    8. 400 kV

    Bacchau-Vadavi 2

    9. 400 kV

    Bacchau-Vadinar 1

    10. 400 kV

    Bacchau-Vadinar 2

    11. 400 kV

    Bacchau-Varsana 1

    12. 220 kV

    Bacchau-Morbi

    tripped while

    charging 400 kV

    Bacchau-Varsana 1

  • 6 GI-2 Varsana 14-07-16,

    01:24:00

    14-07-16,

    06:37:00 05:13

    Load Loss: NIL,

    Generation Loss: NIL

    Tripping of

    1. 400/220 kV

    ICT-I & III

    2. 400 kV Varsana-

    Kansari-I

    due to 400kV Bus

    Bar Protection of

    Bus-I Operated at

    Varsana

    7 GI-2 Dhule 14-07-16,

    21:09:00

    14-07-16,

    23:06:00 01:57

    Load Loss: NIL,

    Generation Loss: NIL

    Tripping of

    1. 400 kV Dhule-

    Khandwa-I

    2. 400 kV Dhule-

    Bableshwar-II

    3. 400 kV Dhule-

    SSP-II

    4. 400 kV Dhule-

    Dhule(BDTCL)-II

    due to 400kV Bus-

    II Bus Bar

    Protection

    Operated at

    Dhule(MSETCL)

  • ANNEXURES

  • piScama xao~ ka carma Baar idna ko pitGaMTa Baar vak

    HOURLY DEMAND CURVES ON REGIONAL PEAK DAY 25.07.2016 AT 20:00 HRS

    40641

    33,000

    34,000

    35,000

    36,000

    37,000

    38,000

    39,000

    40,000

    41,000

    42,000

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

    MW

    Hrs

    piScama xao~ WR

    16106

    11,000

    12,000

    13,000

    14,000

    15,000

    16,000

    17,000

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

    MW

    Hrs

    maharaYT MAHARASHTRA

    12233

    10,300

    11,300

    12,300

    13,300

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

    MW

    Hrs

    gaujarat GUJARAT

    6936

    5,400

    5,900

    6,400

    6,900

    7,400

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

    MW

    Hrs

    maQya pdoSa MADHYA PRADESH

  • piScama xao~ ka carma Baar idna ko pitGaMTa Baar vak

    HOURLY DEMAND CURVES ON REGIONAL PEAK DAY 25.07.2016 AT 20:00 HRS

    3318

    2200

    2700

    3200

    3700

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

    MW

    Hrs

    Ci

  • piScama xao~ ka ny uanatma Baar idna ko pitGaMTa Baar vak HOURLY MIN.DEMAND CURVES ON REGIONAL MINIMUM DAY 13.07.2016 AT 03:00 HRS

    29879

    29000

    30500

    32000

    33500

    35000

    36500

    38000

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

    MW

    Hrs

    piScama xao~ WR

    11728

    10000

    11000

    12000

    13000

    14000

    15000

    16000

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

    MW

    Hrs

    maharaYT / MAHARASHTRA

    8610

    8000

    8500

    9000

    9500

    10000

    10500

    11000

    11500

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

    MW

    Hrs

    ga ujarat GUJARAT

    4853

    4000

    5000

    6000

    7000

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

    MW

    Hrs

    maQya pdoSa MADHYA PRADESH

  • piScama xa o~ ka ny uanatma Baar idna ko pitGaMTa Baar vak HOURLY MIN.DEMAND CURVES ON REGIONAL MINIMUM DAY 13.07.2016 AT 03:00 HRS

    2872

    2000

    2500

    3000

    3500

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

    MW

    Hrs

    Ci

  • Generating Station Details in Western Region

    CENTRAL SECTOR GENERATING STATIONS

    NTPC

    TYPE STATION INSTALLED CAPACITY EFFECTIVE CAPACITY

    UNITS

    TOTAL

    (MW) UNITS

    TOTAL

    (MW)

    Coal

    KSTPS

    3x200+3x500+1x5

    00 2600

    3x200+3x500+1x5

    00 2600

    VSTPS

    6x210+2x500+2x5

    00+3x500 4760

    6x210+2x500+2x5

    00+3x500 4760

    Sipat STPS-II 2X500+3X660 2980 2X500+3X660 2980

    Mauda 3x500 1500 3x500 1500

    NSPCL Bhilai TPP(*) 2x250 500 2x250 500

    TOTAL Coal 12340 12340

    GAS KAWAS 4x106+2x116 656.20 4x106+2x116.1 656.20

    GANDHAR 3x144.3+1x224.49 657.39 3x144.3+1x224.49 657.39

    TOTAL GAS 1314 1314

    GRAND TOTAL 13654 13654

    NPCIL

    TYPE STATION INSTALLED CAPACITY EFFECTIVE CAPACITY

    UNITS

    TOTAL

    (MW) UNITS

    TOTAL

    (MW)

    NUCLEAR TAPS 2x160+2x540 1400 2x160+2x540 1400

    KAPS 2x220 440 2x220 440

    TOTAL NUCLEAR 1840 1840

    CENTRAL SECTOR SUMMARY

    TOTAL CENTRAL

    SECTOR

    Coal 12340 12340

    GAS 1314 1313.59

    NUCLEAR 1840 1840

    GRAND TOTAL (CENTRAL SECTOR) 15494 15494

    STATE SECTOR GENERATING STATIONS

    GUJARAT

    TYPE STATION

    INSTALLED

    CAPACITY

    EFFECTIVE

    CAPACITY

    UNITS

    TOTAL

    (MW) UNITS

    TOTAL

    (MW)

    HYDRO

    UKAI 4x75 300 4x75 300

    UKAI (LBCH) 2x2.5 5 2x2.5 5

    KADANA 4x60 240 4x60 240

    MADHUBAN DAM 2*1.5+2.6 5.6 2*1.5+2.6 5.6

    KARJAN DAM 3 3 3 3

    PANAM CANAL 2x1 2 2x1 2

    SARDAR SAROVAR 16% of 1450 1450 16% of 1450 232

    TOTAL HYDRO 2005.6 779

    Coal A.E.Co.(Torrent

    Power) 1x60+2x121+120 422 1x60+2x110+120 422

  • DHUVARAN 2x140+1*376 656 2x140+1*376 656

    UKAI

    2x120+2x200+1x2

    10+ 1x500 1350

    2x120+2x200+1x2

    10+ 1x500 1350

    GANDHI NAGAR 2x120+3x210 870 2x120+3x210 870

    WANAKBORI 7x210 1470 7x210 1470

    SIKKA 2x120+1x250 490 2x120+1*250 490

    KUTCH LIGNITE 2x70+2x75 290 2x70+2x75 290

    SURAT LIGNITE 4x125 500 4x125 500

    AKRIMOTA 2x125 250 2x125 250

    *CGPL

    **3x830 +1x830+

    1x830 4150

    **3x830 +1x830+

    1x830 4150

    *Mundra(APL) **4*330

    +3*660+2*660 4620

    **4*330

    +3*660+2*660 4620

    Essar Vadinar 2x600 1200 2x600 1200

    TOTAL Coal 16268 16268

    GAS

    DHUVARAN 1x218.62 218.62 1x218.62 218.62

    TORRENT

    POWER*** 2X32.5+35.0(ST) 100 2X32.5+35(ST) 100

    UTRAN-I 3x30+1x45 144 3x33+1x45 144

    UTRAN-II

    1X229+1X146(ST

    ) 375

    1X229+1X146(ST

    ) 375

    GIPCL I 3x32+49(ST) 145 3x32+49 145

    GIPCL II 111+54(ST) 165 111+54 165

    ESSAR** 3x110+1x185 (ST) 300

    3x110+1x185

    (ST) 300

    GPEC 3x138+1x241(ST) 655 3x138+1x241(ST) 655

    DGEN 3x400 1200 3x400 1200

    Pipavav CCPP- GPCL

    & GSPC joint venture 2x351.43 702.86 2x351.43 702.86

    Hazira CPP Extn 1x351 351 1x351 351

    UNO, Sugen 1x382.5 382.5 1x382.5 382.5

    GSEG HAZIRA 2x52+1x52.1 (ST) 156.1 2x52+1x52.1 (ST) 156.1

    SUGEN 3X382.5 1147.5 3X382.5 1147.5

    TOTAL GAS 6043 5943

    Diesel 17.48 17.48

    WIND+SOLAR+Others 5230 5230

    TOTAL GUJARAT

    HYDRO 2005.6 779

    COAL 16268 16268

    GAS 6042.58 5942.58

    GRAND TOTAL (GUJARAT) 29564 28237

    MADHYA PRADESH

    TYPE STATION INSTALLED CAPACITY EFFECTIVE CAPACITY

    UNITS

    TOTAL

    (MW) UNITS

    TOTAL

    (MW)

    HYDRO

    GANDHI NAGAR 5x23 (50%) 115 5x23 (50%) 57.5

    R P SAGAR 4x43 (50%) 172 4x43 (50%) 86

    J SAGAR 3x33 (50%) 99 3x33 (50%) 49.5

    PENCH SHARE 2x80 (66.67%) 160 2x80 (66.67%) 106.672

    BANASAGAR TONS 3x105 315 3x105 315

    BARGI 2x45 90 2x45 90

    BANASAGAR 2x15+3x20+2x10 110 2x15+3x20+2x10 110

    BIRSINGHPUR 1x20 20 1x20 20

    RAJGHAT 3x15(50%) 45 3X15(50%) 22.5

    INDIRA SAGAR 8x125 1000 8x125 1000

    MADHIKHEDA HEP 3X20 60 3X20 60

    MINI & MICRO

    HYDRO 5.46 5.46 5.46 5.46

    Omkareswar Hydro 8x65 520 8x65 520

  • NVDA (BARGI

    LBC+ISP LBC) 2x5+3x5 25 2x5+3x5 25

    RIHAND 6x50(15%) 300 6x50(15%) 45

    MATATILA 3x10(15%) 30 3x10(15%) 10

    TOTAL HYDRO 3066 2523

    Coal

    AMARKANTAK 2X120+1X210 450 2X120+1X210 450

    SATPURA-II 1x200+1x210 410 1x200+1x210 410

    SATPURA-III & IV 2x210+2x250 920 2x210+2x250 920

    S GANDHI TPS I & II 4x210 840 4x210 840

    S GANDHI TPS III 1x500 500 1x500 500

    Jaypee Bina 2x250 (70%) 500 2x250 (70%) 500

    *SASAN (Unit 1-6) **6x660 (37.5%) 3960 **6x660 3960

    Jayprakash

    Nigrie(IPP) 2x660 (37.5%) 1320 2x660 (37.5%) 1320

    SSTP(Shri Singhaji

    Thermal Power

    Station)

    2x600 1200 2x600 1200

    BLA POWER 1x45(35%) 45 1x45(35%) 45

    Jhabua Power (

    Avanta) 1x600 600 1x600 600

    M B Power 2x600 (35%) 1200 2x600 (35%) 1200

    TOTAL THERMAL 11945 11945

    Diesel 0 0

    RES 3043 3043

    TOTAL MADHYA

    PRADESH

    HYDRO 3066 2523

    THERMAL 11945 11945

    GRAND TOTAL (MADHYA PRADESH) 18054 17511

    CHHATISGARH

    TYPE STATION INSTALLED CAPACITY EFFECTIVE CAPACITY

    UNITS

    TOTAL

    (MW) UNITS

    TOTAL

    (MW)

    HYDRO

    HASDEO BANGO 3x40 120 3x40 120

    Gangrel 4x2.5 10 4x2.5 10

    Korba West Mini

    Micro Hydel 2X.85 1.7 2X.85 1.7

    Sikasar 2x3.5 7 2x3.5 7

    TOTAL HYDRO 138.7 138.7

    Coal

    KORBA (E) 4x50+2x120 440 4X50+2X120 440

    KORBA (W) 4x210+1x500 1340 4x210+1x500 1340

    KORBA (E) ext-I 2x250 500 2x250 500

    Korba West Power

    Corp. Ltd. (IPP) 1x600 600 1x600 600

    JINDAL Stage I, IPP 4x250 1000 4x250 1000

    JINDAL(JSPL

    TPP)unit3 1x135

    135 1x135

    135

    LANCO-Amarkantak 2x300 600 2x300 600

    SVPL TPP 1x63 63 1x63 63

    Spectrum Coal Private

    Ltd. 1x50

    50 1x50

    50

    ESSAR Mahan 1x600 600 1x600 600

    GMR-Chhatisgarh

    Energy Ltd 2x685 1370 2x685 1370

    ACBIL,IPP 2x135+2*30 330 2x135+2*30 330

    KSK

    Mahanadi,IPP(Unit 1

    and Unit 4) 2x600 1200 2x600 1200

    Vandana Vidyut,IPP 1x135 135 1x135 135

    DB Power,IPP 2x600 1200 2x600 1200

    JPL Stage II,IPP 4x600 2400 4x600 2400

    Balco 4x300 1200 4x300 1200

  • RKM Powergrn ltd 2x360 720 2x360 720

    Marwa TPS 1x500+1x500 1000 1x500+1x500 1000

    Maruti Clean Coal

    Power Ltd 1x300 300 1x300 300

    TRN Energy 1x300 300 1x300 300

    TOTAL THERMAL 15483 15483

    CHHATTISGARH

    TOTAL

    HYDRO 138.7 138.7

    THERMAL 15483 15483

    Diesel 0 0

    RES+Wind 425 425

    GRAND TOTAL (CHHATISGARH) 16047 16047

    MAHARASHTRA

    TYPE

    STATION

    INSTALLED CAPACITY EFFECTIVE CAPACITY

    UNITS

    TOTAL

    (MW) UNITS

    TOTAL

    (MW)

    HYDRO

    KOYNA I & II

    4x(65+5)+4x(75+5

    ) 600

    4x(65+5)+4x(75+

    5) 600

    KOYNA III 4x80 320 4x80 320

    KOYNA DPH 2x20 40 2X18 36

    KOYNA IV 4x250 1000 4x250 1000

    KHOPOLI 3x24 72 3x24 72

    BHIVPURI 3x24+2x1.5 75 3x24+2x1.5 75

    BHIRA 6x25 150 6x25 150

    BHIRA PSS 1x150 150 1x150 150

    VAITHARNA 1x60 60 1x60 60

    TILLARI 1x66 66 1x66 66

    BHIRA T/R 2x40 80 2x40 80

    GOM HYDRO 38 38

    DADSON 1x44 44 1x44 44

    GHATGHAR 2x125 250 2x125 250

    TOTAL HYDRO 2945 2941

    CHANDRAPUR 4x210+3x500 2340 4x210+3x500 2340

    Coal

    CHANDRAPUR

    Extension 1x500+1x500 1000 1x500+1x500 1000

    TROMBAY 2x500+1X250 1250 2x500+1X250 1250

    KORADI 1x200+2x210 620 1x200+2x210 620

    KORADI 3x660 1980 3x660 1980

    NASIK 3x210 630 3x210 630

    KHAPERKHEDA 4x210+1x500 1340 4x210 +1x500 1340

    PARLI

    2x0+3x210+2x250

    +1x250 1380

    2x0+3x210+2x250

    +1x250 1380

    BHUSAWAL 2x210+ 2x500 1420 2x210+ 2x500 1420

    REL DAHANU 2x250 500 2x250 500

    PARAS 2x250 500 2x250 500

    JSW Ratnagiri(Jaigad) 4x300 1200 4x300 1200

    Mihan TPP(Abhijit) 4x61.5 246 4x62.5 246

    Wardha Warora Power

    Co Ltd. 4x135 540 4x135 540

    Vidharbha Industry,

    Butibori 2x300 600 2x300 600

    APML,Tiroda-Ph-

    I(400 kV) 3x660 1980 3x660 1980

    APML,Tiroda-Ph-II(

    765 kV) 2x660 1320 2x660 1320

    IEPL (Ideal Energy

    Power Ltd, Belapur) 1x270 270 1x270 270

    IBL (India Bulls

    Limited, Amravati)

    Ratan India

    5x270 1350 5x270 1350

  • EMCO 2x300 600 2x300 600

    Indrajeet 1x77 77 1x77 77

    Indorama 1x49 49 1x49 49

    Finolex, Ratnagiri 1x43 43 1x43 43

    JSW Boisar, Vashi

    Circle 1x37.6 37.6 1x37.6 37.6

    Uttam Galwa 1x60 60 1x60 60

    Gupta Energy ltd 2x60 120 2x60 120

    Topworth Urja 1x30 30 1x30 30

    Ultratech Cement ltd. 1x46 46 1x46 46

    Vayunandana Power

    ltd 1x10 10 1x10 10

    Dhariwal-I& II (STU) 1x300 300 1x300 300

    ISMT Ltd 40 40 40 40

    Suryalakshmi Cotton

    & Mills Ltd 25 25 25 25

    Grace Industries Ltd 33 33 33 33

    Prithvi Ferro Alloys

    Pvt. Ltd 18 18 18 18

    RCF, , Pen circle 30 30 30 30

    BILT Power, Baramati

    circle 5 5 5 5

    Reliance Patalganga 20 20 20 20

    Sunflag , Bhandara

    Circle 15 15 15 15

    BILT

    Power,Chandrapur

    circle

    10 10 10 10

    Gopani Chandrapur

    circle 12 12 12 12

    ONGC, Vashi circle 59.6 59.6 59.6 59.6

    IG Petro, Vashi circle 4.2 4.2 4.2 4.2

    Technocraft Industries,

    Kalyan Circle 5 5 5 5

    Ratan India Pvt

    Ltd.(Sinner) 1x270+1x270 540 1x270+1x270 540

    RPL URJA

    YEOTMAL 10 10

    Siddhabali Ispat,

    Chandrapur Circle 20 20

    TOTAL COAL 22685.4 22685.4

    GAS

    TROMBAY-7A & 7B 120+60 180 120+60 180

    URAN (G) 4x108 432 4x108 432

    URAN-DPH 2x120 240 2x120 240

    RATNAGIRI PHASE -

    I 2x205+1x230 640 2x205+1x230 640

    RATNAGIRI PHASE

    -II 2x213 + 237.54 663.54 2x213 + 237.54 663.54

    RATNAGIRI PHASE-

    III 2x213 + 237.55 663.54 2x213 + 237.55 663.54

    Pioneer Gas Pvt Ltd 1x126 + 1x262 388 1x126 + 1x262 388

    TOTAL GAS 3207 3207

    Diesel Diesel 0 0

    WIND+RES WIND+RES 6613 6613

    MAHARASHTRA

    HYDRO 2945 2941

    COAL 22685.4 22685.4

    GAS 3207.08 3207.08

    WIND+RES 6613 6613

    GRAND TOTAL

    (MAHARASHTRA) 35450 35446

  • GOA

    TYPE STATION INSTALLED CAPACITY EFFECTIVE CAPACITY

    UNITS

    TOTAL

    (MW) UNITS

    TOTAL

    (MW)

    Diesel 0 0

    RES 30 30

    GAS

    RELIANCE,

    SALGAONKAR 1x39.82+1x8.2 48.02 1x39.82+1x8.2 48.02

    GRAND TOTAL (GOA) 78 78

    Angular separation violation report for July16-

    Sr. No.

    Wide Angle pair Angular

    limit %

    violation max (degrees)

    min (degrees

    )

    1 Korba-Kalwa 65 0.00% 50.72 39.12

    2 Raipur-Kalwa 60 0.00% 43.67 33.39

    3 Korba-Raipur 30 0.00% 7.22 5.65

    4 Kalwa-Solapur 30 0.00% 18.08 10.42

    5 Raipur-Solapur 50 0.00% 32.86 21.37

    6 VSTPS-Asoj 50 0.00% 46.87 33.41

    7 Jabalpur-Asoj 40 0.00% 29.42 19.47

    8 CGPL-Dehgam 40 0.00% 25.29 17.61

    9 Boisar-Kalwa 30 0.00% 4.20 2.25

    10 VSTPS-Bina(MP) 40 0.00% 21.53 17.08

    11 Jabalpur-Bina(MP) 30 0.00% 5.72 3.72

    Sr. No.

    Adjacent Angle pair Angular

    limit %

    violation max (degrees)

    min (degrees

    )

    1 Jabalpur-Itarsi 30 0.00% 8.13 5.82

    2 Raipur-Bhadrawati 30 0.00% 13.09 6.27

    3 VSTPS-KSTPS 30 0.00% 11.86 5.99

    4 VSTPS-Jabalpur 30 0.00% 17.55 13.56

    5 VSTPS-Satna 30 0.00% 9.24 7.96 *(Note: The figures shown above are indicative only and are calculated based on data acquired from remote locations in

    Western Region over existing communication links.)

  • ATC/TTC Violation July16

  • ATC Violation in WR-July16

    Congestion Warning Notices in July16: