suresh bim hvac portfolio
TRANSCRIPT
PROJECT PORTFOLIO
SURESH BABU GB.E (MECHANICAL)
REVIT MEP, HVAC [email protected]
Contact. No: +91-8050575673
PROJECT OVERVIEW
Building type: Office Building
Location: Bangalore.
Building Load:350 TR
Area: 217900 Square ft.
Floors: Ground floor + 6Floors.
Design occupancy: 3010 Peoples.
Building operating schedule: 12x5.
Air distribution system: VAV single duct.
TYPICAL FLOOR PLAN
TYPICAL FLOOR 2D VIEW TYPICAL FLOOR 3D VIEW
Created walls, columns in the model. Placed windows, doors and curtain walls. Created Spaces, Zones, & color fill legend.
3D VIEW OF BUILDING
HEAT LOAD REPORT
DUCT PRESSURE DROP ANALYSIS
Static Pressure for critical path is 28.5 Pa Based on pressure drop in Critical path
AHU fan is selected
2D VIEW 3D View
3D View
PHE & PRESSURE DROP ANALYSIS
FIRE PROTECTION SYSTEM
SPRINKLER
2D IEW3D VIEW
ELECTRICAL CABLE ROUTING
3D VIEW2D VIEW
False Ceiling levelLighting FixtureSupply Diffuser
SECTIONAL VIEWS
3D Sectional View
CO-ORDINATION OF ALL FLOORS
3D VIEW OF MEP OF ALL 7 FLOORS
CLASH DETECTION REPORT
CLASH DETECTION & SOLUTION
Clash in between cable tray & domestic hot water pipe.
Clash solved by moving domestic hot water pipe
2D VIEW 3D VIEW
CLASH
CLASH DETECTION & SOLUTION
Clash in between duct & cable tray.
Clash solved by moving cable tray.
Clash in between duct & column.
Clash solved by moving duct.
ANNOTATION
DUCT PRESSURE LOSS REPORT
BILL OF QUANTITITES
DRAFTING SHEET ORIENTATION