    SECURING COAL SUPPLY

    THROUGHINDIGENOUS AND FOREIGN

    SOURCES

    T.K. Chatterjee

    E.D.(FM),NTPC

  • 8/6/2019 T K Chatterjee

    2/42

    Basic Coal Facts

    Countries Fall under distinct categories due to

    uneven distribution of coal resources

    TierI Countries: Self Sufficient or better : North

    America & Russia

    Tier- II Countries: Prime Exporter: Australia,Indonesia & Colombia

    Tier-III Countries: Facing possible shortfall from

    indigenous supply: India & ChinaTier-IV Countries: Facing possible shortfall of

    imported Coal: Japan, Korea and much of

    Europe

  • 8/6/2019 T K Chatterjee

    3/42

    World Coal ScenarioTop Ten Hard Coal Producers in the World in 2007

    PR CHINA 2549 MT

    USA 981 MT

    INDIA 452 MT

    AUSTRALIA 323 MT

    SOUTH

    AFRICA

    244 MT

    RUSSIA 241 MT

    INDONESIA 231 MT

    POLAND 90 MT

    KAZAKHSTAN 83 MT

    COLUMBIA 72 MT

    Global hard Coal

    consumption

    1990 2006 2007

    WORLD 3461 5164 5522

    Source: BP, IEA,WEC

    1990

    24%

    2006

    37%

    2007

    39%

    0%

  • 8/6/2019 T K Chatterjee

    4/42

    Coal in World Electricity Generation2006

    POLAND 93%

    S.AFRICA 93%

    AUSTRALIA 80%

    PR CHINA 78%

    ISRAEL 71%

    KAZAKHSTAN 70%INDIA 69%

    MOROCCO 69%

    CZECH

    REPUBLIC

    59%

    GREECE 58%

    USA 50%

    GERMANY 47%

    TOP COAL IMPORTERS(2007)

    JAPAN 182MT

    KOREA 88MT

    CHINESE

    TAIPEI

    69MT

    INDIA 54MT

    PR CHINA 48MT

    GERMANY 46MT

    TOP COALEXPORTERS(2007)

    AUSTRALIA 244MT

    INDONESIA 202MT

    RUSSIA 100MT

    COLUMBIA 67MT

    SOUTH AFRICA 67MT

    PR CHINA 54MT

    USA 53MT

    Source: BP,IEA,WEC

  • 8/6/2019 T K Chatterjee

    5/42

    GLOBAL PRIMARY ENERGY SUPPLY AND TOTAL

    WORLD ELECTRICITY GENERATION BY FUEL

    Source: BP,IEA,WEC

  • 8/6/2019 T K Chatterjee

    6/42

    Coal Reserves in India

    (as on 01-01-08) Billion tonnes

    Proved Indicated Inferred

    Coking 17 13 2

    Non-Coking 79 106 36

    Total 96 119 38

    Source: MOC

  • 8/6/2019 T K Chatterjee

    7/42

    RAW COALPRODUCTION IN INDIA

    5

    55

    AR

    MILLION

    TONN

    Growth of coal production is 6. % whereas demand forelectricity has been growing at an average growth rateof 7% to 8% and demand supply gap has widened overthe years.

  • 8/6/2019 T K Chatterjee

    8/42

    Existing Generating Capacity- Sept,2009

    Fuel wise break-up (MW)

    COAL 80,396 53%

    GAS 16,449 11%

    OTHERS 55,515 36%

    TOTAL 152,360 100.0%

    (All figures provisional from CEA)

    FOR NTPC : COAL BASED-24395MW

    GAS BASED 3955 MW

  • 8/6/2019 T K Chatterjee

    9/42

    COAL REQUIRMENT,AVALIABILITY DURINGXI PLAN FOR

    POWER SECTOR[ Source:CEA Presentation made on 30.09.09 in the Fuel Infrastructure Meeting under the

    Chairmanship of Member(Energy)]

    Sl.

    No.

    Details 2007-08# 2008-09#` 2009-10# 2010-11 2011-

    12

    a) Indigenous coal

    requirement

    340.0 377.6 401.0 434.0 488.0

    b) Requirement of importedcoal for imported coal

    based projects

    -- 0.4 3.0 10.0 19.0

    c) Total coal requirement 340.0 378.0 404.0 444.0 507.0

    d) Indigenous coal availability

    from:-

    i) CIL 278 294 313 335 360

    ii) SCCL 30 30 30 32 32

    iii) Captive mines 11 19 20 21 22

    e) Total availability of

    indigenous coal

    319 343 363 388 414

    f) Shortfall in indigenous coalavailability (a-e)

    21 34.6 38.0 46.0 74.0

  • 8/6/2019 T K Chatterjee

    10/42

    29894

    75000

    50000

    As on today 2012 2017

    INSTALLEDCAPACITYINSTALLEDCAPACITY

    MULTI PRONGED APPROACH TO

    CAPACITY ADDITION

    GREENFIELD PROJECTS

    BROWNFIELD EXPANSION

    JOINT VENTURES

    ACQUISITIONS

    DIVERSIFICATION IN RELATED

    BUSINESS AREAS

    HYDRO PROJECTS

    COAL MINING

    POWER TRADING

    OIL / GAS EXPLORATION

    LNG VALUE CHAIN

    RENEWABLE

    NUCLEAR

    MULTI-PRONGEDGROWTH

    STRATEGY

    Projects underconstruction 16,180 MW

    NTPCGROWTHSTRATEGY

    Vision 2017 and beyond..2030

  • 8/6/2019 T K Chatterjee

    11/42

    11

    NTPCs Vision By 2017

    At Present 2011-12 2016-17INSTALLED

    CAPACITY (MW)29,894 ~ 50,000 ~ 75,000

    COAL MINING

    PRODUCTIONFROM INDIGNOUSMINING

    -- 12 MTPA ~ 47 MTPA

    A 75,000 MW+ Integrated Power Company by the year 2017

    Vision 2017 and beyond..2030

  • 8/6/2019 T K Chatterjee

    12/42

    COALSUPPLYTONTPC STATIONS

    Y AR

    ILLIONTO

    NN

    S

    The graph shows an ever increasing demand for more coal as NTPC kept on

    building additional generation capacity over the years

  • 8/6/2019 T K Chatterjee

    13/42

    NTPC's Coal Requirement (Million Tes)

    0

    50

    100

    150

    200

    250

    300

    350

    In the current year,coal shortage of20 million tes is envisaged which

    NTPC plans to bridge through import

  • 8/6/2019 T K Chatterjee

    14/42

    Areas of Concern in Eastern Region-IShortfall mitigation at Farakka & Kahalgaon

    The import supplement required for Farakka &Kahalgaon is 6 million tonnes. The domestic coalavailability for Farakka & Kahalgaon is 15 milliontes on the basis of assurance of CIL.

    As blending of imported coal with domesticcoal cannot be increased beyond 15%, weneed to mandatorily tie up 6 million tons ofdomestic coal from CIL. Coal production andevacuation arrangements to be expedited at

    Chuperbhita and Hurra C.

    The import requirement would then be reduced to3 million tonnes.

  • 8/6/2019 T K Chatterjee

    15/42

    Areas of Concern in Eastern Region-I

    Railway bottle necks for Farakka and Kahalgaon

    Railways are ensuring supply of 10 rakes/day

    but Andal-Saithia and Sahibganj -Kahalgaon

    single line route is congested. Less Availability of BOBR rakes is also a

    concern.

  • 8/6/2019 T K Chatterjee

    16/42

    as ern eg on-

    Enablers for Coal sufficiency at Farakka & Kahalgaon Coal can be transported through Inland waterway no-1 i.e

    Ganga passes through Farakka, Kahalgaon and Barh whereNTPCs 03 super thermal stations are located. The receivingport for imported coal can be Haldia.

    Feasibility of receiving imported coal via IWT is being studied Availability of more Railway rakes@10 rakes a day as per their

    assurance. Augmentation of existing unloading infrastructure at Farakka to

    handle 8 railway rakes a day.

    9 to 10 rakes a day of Total coal on offer from Lalmatia to besupplied to Kahalgaon.

    Augmentation of unloading arrangements at Kahalgaon-II to handle9-10 rakes a day.

    Continue Supplying imported coal at Kahalgaon and Farakka

    Early Coal Availability from Captive Block ofPakri Barwadih

    Early availability of coal from Brahmini mines

  • 8/6/2019 T K Chatterjee

    17/42

    Areas of Concern in Eastern Region-IIShortfall mitigation at Talcher Kaniha

    Expeditious development of Kaniha mines and MGR link to

    Kaniha wharf wall.

    Railways to assure supply of 7 rakes a day on sustained basis.

    Sustained supply of 35,000 TPD from Lingaraj mine by MCL.

    Augmentation of present MGR network to facilitate Additional

    number of Railway and MGR Rakes

    Improvement of Surface miner availability/reliability from 1 to 3

    numbers.

    Supply of Imported Coal to continue.

    Inland water transport route to be explored.

  • 8/6/2019 T K Chatterjee

    18/42

    Fuel Tie up Status for XI Plan

    projects Fuel has been tied up for all projects

    envisaged to come up in the 11th plan

    except Farakka-III, Mauda U#2 and

    VSTPP-IV

    Railway movement clearance has been

    obtained for all 11th plan projects except

    Vallur-II,VSTPP-IV and Muzaffarpurwhichis awaited.

  • 8/6/2019 T K Chatterjee

    19/42

    Coal Requirement for 11th plan projectsCapacity

    MW

    Long Term

    Linkage

    MT

    2011-12

    MT

    2016-2017

    MT

    Gap w.r.t

    Linkage

    (2016-17)MT

    Sipat-I 1980 10 11.04 11.04 1.036

    Barh 1980 10 3.75 11.24 1.239

    Korba III 500 2.233 2.79 2.79 0.554

    Simhadri II 1000 2.31 5.37 5.37 3.059

    NCPP Expn 980 4.62 5.01 5.01 0.394

    Bongaigon TPS 500 1.65 1.66 1.66 0.006Bongaigon TPS 250 0.97 1.06 1.41 0.437

    Mauda 1000 5 1.42 5.68 0.676

    Rihand III Unit-I 500 1.77 0.21 2.49 0.721

    Vindhyachal-IV 1000 4.62 0.22 5.22 0.600

    Barh-II 1320 0 0.94 7.49 7.49

    Farakka-III 500 0 3.63 3.63 3.631

    Nabinagar 1000 5 3.67 5.68 0.68

    Vallur -I 1000 4.62 5.37 5.37 0.34

    Vallur-II 500 2.31 0.22 2.68 0.37

    Jhajjar 1500 6.94 8.05 8.05 1.11

    Muzaffarpur Expn 500 2.31 0.74 3.55 1.24Subtotal 16010 64.353 55.15 88.36 23.583

  • 8/6/2019 T K Chatterjee

    20/42

    Coal Requirement for 12th plan projectsCapacity

    MW

    Long Term

    Linkage

    MT

    2016-2017

    MT

    Gap w.r.t

    Linkage

    (2016-17)MT

    Rihand III U=2 500 2.31 2.49 0.181

    Solapur 1320 6.09 7.49 1.403

    Kahalgaon III 500 2.31 3.58 1.27

    Darlipalli 3200 12.5 14 1.50

    Lara 4000 7 15.89 8.89

    Darlipalli II 1600 7.39 9.08 1.69

    North Karanpura 1980 10.24 11.24 1.0

    Gadarware 2640 12.19 15.40 3.21

    Marakkam 4000 18.48 16.34 -2.14

    Vindhyachal-V 500 2.31 3 0.69

    Singrauli III 500 2.31 3 0.69

    TTPS II 1320 6.09 7.91 1.82

    Kudgi 2400 11.08 13.07 1.99

    Tanda Expn 1320 0 5.99 5.99

    Jhajjar II 1000 4.62 5.08 0.46

    Meja 1320 6.09 7.32 1.23

    New Nabinagar 1980 9.14 10.98 1.84

  • 8/6/2019 T K Chatterjee

    21/42

    Projected Coal deficit (Gap) for Existing and

    projects coming up in 11th and 12th plan

    in the terminal year 2016-17NTPC Stations 2016-17

    (MT)

    Existing stations 12.11

    Projects in the 11th plan 23.583

    Projects in the 12th plan 31.714

    Total 67.407

    The Deficit coal requirement is planned to be met through captive mining of

    coal blocks allotted to NTPC and import Substitution

  • 8/6/2019 T K Chatterjee

    22/42

    Reasons for Coal shortage

  • 8/6/2019 T K Chatterjee

    23/42

    Coal availability scenario for NTPC

    Out of expected coal based capacity

    addition of about 30,000 MW by 2016-17,about 19, 000 MW will be on linkage mode

    and balance 11,000 MW on integrated

    mode.

    The total coal shortage for power sector is

    expected to be about 87 million tes by

    2016-17

    FUTURE SCENARIO

  • 8/6/2019 T K Chatterjee

    24/42

    Reasons for coal shortage

    The long term linkage for NTPC stations

    correspond to 85-90% PLF level whereas the

    generation target is at 92% PLF.

    Growth in the coal sector not commensurate

    with nations requirement of +8% GDP

    growth.

  • 8/6/2019 T K Chatterjee

    25/42

    Slow clearance of projects. In some cases linked

    mines are yet to be developed even though the

    power projects have been implemented onschedule. This is resulting into under utilization of

    installed capacity.

    Ad hoc coal supply arrangements incurring

    additional expenditure.

    Further burdening of already burdened Rlytransportation network.

    Reasons for coal shortage

  • 8/6/2019 T K Chatterjee

    26/42

  • 8/6/2019 T K Chatterjee

    27/42

    Reasons for coal shortage

    Coal reserves are generally localized.

    Transportation of coal is an issue.

    Judicious rationalization of coal supply not

    done due to various political and other

    reasons.

    Logistic Constraints

  • 8/6/2019 T K Chatterjee

    28/42

    Long term Measures to mitigate coal shortage

    Backward integration into coal mining.

    Resorting to integrated power project

    with captive coal source concept.

    NTPC is contemplating acquiring assets

    abroad as a measure of long term fuel

    security and to beat the current volatility

    in the coal prices in the international

    market.

  • 8/6/2019 T K Chatterjee

    29/42

    Strategies for

    Coal Sourcing

  • 8/6/2019 T K Chatterjee

    30/42

    COAL

    SECURITY

    IMMEDIATEMEDIUMTERM

    LONGTERM

    IMPORT

    E-AUCTION

    DEVELOP CAPTIVE

    MINING BLOCKS

    ON FASTTRACK

    MODE

    MININGOF POTENTIALCOAL BLOCKSTHRU

    JV ROUTE

    WITH CIL

    INLAND

    WATER TRANSPORT

    DEDICATEDFREIGHT CORRIDOR

    SETTINGUPCOALWASHERIES

    ACQUISIONOF COAL

    BLOCKSABROAD

    PARTICIPATE INPORT

    DEVELOPMENT

    FUELSUPPLYAGREEMENT

    Bi-Lateral

    Arrangement over

    And above ACQ

  • 8/6/2019 T K Chatterjee

    31/42

    Fuel Supply Agreement

    As per NCDP, power utilities to besupplied 100% of the normative coalrequirement with FSA. (Normative

    requirement not frozen so far). NTPC has already signed a Model Fuel

    supply agreement with Coal India Limited

    for 90% coal requirement for existingstations of NTPC. The process of signingof FSAs for individual stations is inprogress.

  • 8/6/2019 T K Chatterjee

    32/42

    IMPORT(FIG INMillion Tonnes)

    .

    2005-06 2006-07 2007-08 2008-09

    3.1 2.3 2.7 5.4

    NTPC is partially mitigating its domestic coal shortage for existing stations by

    importing coal through third parties and the percentage of import coal is

    Increasing every year. In the current Financial yearNTPC planned to import 12.5

    Million Tonnes

  • 8/6/2019 T K Chatterjee

    33/42

  • 8/6/2019 T K Chatterjee

    34/42

    Coal security-Augmentation of

    unloading

    NTPC has already started Augmentation

    of unloading infrastructure like Wagon

    Tipplers at pithead stations for absorbingmore IR rakes.

    This would enable the stations to absorbmore coal through railway system.

    ap ve n ng oc s

  • 8/6/2019 T K Chatterjee

    35/42

    ap ve n ng oc s

    Backward IntegrationCoal Mining

    Projects

    Basket source

    for

    Command area Mine

    CapMT

    MOC Schl.

    forProd.

    Est.

    Minelife

    Pakri Barwadih

    (critical)

    Shortfall of

    Lara and

    Darlipalli

    CCL-N

    Karanpura area

    15 2009-10 38

    Chatti-Bariatu Barh-II-1600

    MW/TandaExpn-1320MW

    CCL-N

    Karanpura area

    7 2010-11 25

    Kerandari do 6 2011-12 30

    Dulanga Darlipalli-3200

    MW

    MCL-Ib Valley 7 2011-12 30

    Talaipalli Lara-4000MW SECL-Mand

    Raigarh

    15 2011-12 30

    Brahmini (Incl

    Chichro

    Patsimal)

    (critical)

    Farakka &

    Kahalgaon

    ECL 20 - 25

    Chatti BariatuSouth

    Darlipalli-3200 CCL-NKaranpura area

    Production from Captive mines

    not likely to commence in the

    near future

  • 8/6/2019 T K Chatterjee

    36/42

    ACQUISITIONOF COAL BLOCKSABROAD

    1. Participate in acquisition of coal blocks inprospective countries like Indonesia,Mozambique, Australia.

    2. Leverage government support for tie up with

    interested host country for expeditiousacquisition and development of mines anddevelopment of transportation logistics at the

    exporting country.

    This could be a long term Fuel securitymeasure and shall also help to partiallyoffset the volatility of coal prices in the

    international market.

  • 8/6/2019 T K Chatterjee

    37/42

    DEDICATED RAILWAY FREIGHT

    CORRIDOR

    Has potential to meet long term Requirement.

  • 8/6/2019 T K Chatterjee

    38/42

    Mitigating Coal Shortage The Way Forward

    Stepping up domestic coal production by allotting blocksto central and state public sector units and for captivemines to notified end users

    Coal Import needs creation of necessary infrastructure.Will also put pressure on domestic coal industry to beefficient. NTPC has imported about 5.43 Mt of coal in2008-09 and is targeting to import more than 12.5 Mtof imported coal during 2009-10.

    Amendment in Coal Mines Act to facilitate (a) private

    participation in coal mining for purposes other than thosespecified and (b) offering of future coal blocks topotential entrepreneurs.

    Technology for economic exploitation of coal lying at

    greater depths

  • 8/6/2019 T K Chatterjee

    39/42

    MAJOR CONSTRAINTS IN IMPORT

    Two major constraints in the import of coal

    apart from Supply constraints in the

    international coal market are:

    1. Port infrastructure

    2. Railway infrastructure

    .

  • 8/6/2019 T K Chatterjee

    40/42

    AREASOF CONCERN As per indications, the port development

    projects/plans would fall short of required capacity

    addition to handle thermal coal imports of 100+MMTPA.

    These projects are not mapped and positionedagainst Geographical demand centres. Most portdevelopment projects are along the east coast of Indiaand very few on the west coast

    No visible plan of Indian Railways in place to cater tothe excess cargo to be handled by these portsexcept the dedicated freight corridor which in all

    likelihood would not come before 2017.Plans to expand the railway network to connect theseports to inland destinations do not also seem to be inplace.

    Source: CII

  • 8/6/2019 T K Chatterjee

    41/42

    Fuel Security: Thinking beyond

    For a utility as large as NTPC, it is imperativethat we align ourselves completely with the

    fuel business in line with the Vision of

    becoming a fully integrated company by

    2017.

    Take fuel as a business.

    Enter partial/ full Coal value chain.

    Formation of a new subsidiary to handle fuel

    business with complete autonomy to source

    fuel.