uttar pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/uttarpradeshitis.pdf ·...

111
Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI, Agra (W) ITI, Amethi ITI, Chhanvey ITI, Akbarpur 2. ITI, Banda ITI, Aonla Barielly ITI, Barabanki ITI, Ibrahimbad ITI, Alapur 3. ITI, Budaun ITI, Atrauli ITI, Campierganj ITI, Kasganj ITI, Anandpur Jharki 4. ITI, Charbagh, Lucknow ITI, Aliganj, Lucknow WB (W) ITI, Chandauli ITI, Sambhal ITI, Atrauli (Hardoi) 5. ITI, Chaukaghat, Varanasi ITI, Bijnor ITI, Charkari ITI, (W) Sultanpur ITI, Barhalganj 6. ITI, Chandausi ITI, Bachcha Park, Meerut ITI, Gauriganj ITI, Bhadohi Sant Ravidas Nagar 7. ITI, Deoria ITI, Barielly (W) ITI, Gorakhpur (W) ITI, Bihar 8. ITI, Etah ITI, Civil Lines Bareilly ITI, Hathras ITI, Bilsi 9. ITI, Faizabad ITI, Chaukaghat, Varanasi WB (W) ITI, Jagdishpur ITI, Chandan Chauki 10. ITI, Fatehpur ITI, Ghatampur ITI, Javer ITI, Dadri 11. ITI, Farrukhabad ITI, Gulaoti ITI, Jhansi (W) ITI, Dhampur 12. ITI, Gonda ITI, Katra Allahbad (WW) ITI, Kadipur ITI, Fatehpur 13. ITI, Hardoi ITI, Katara ITI, Khajni ITI, Mahilla Charbagh 14. ITI, Jaunpur ITI, Kanpur WB (W) ITI, Lalganj Azamgarh ITI, Gondlamau 15. ITI, Mathura ITI, Raibareli (W) ITI, Lalitpur ITI, Hasanganj 16. ITI, Mahova ITI, Railway Colony, Gorakhpur ITI, Maharajganj ITI, Jalesar 17. ITI, Mau ITI, Simbhaoli ITI, Mankapur Gonda ITI, Kairana 18. ITI, Mainpuri ITI, Saket, Meerut WB (W) ITI, Modhonagar ITI, Kannauj 19. ITI, Orai - ITI, Mohamdabad Gohana ITI, Khekra 20. ITI, Pilibhit - ITI, Musafirkhana ITI, Koil 21. ITI, Partapgarh - ITI, Naurangia ITI, Lakhna 22. ITI, Rampur (W) - ITI, Padrauna ITI, Lisad 23. ITI, Shahjahanpur - ITI, Patti ITI, Manda 24. ITI, Sitapur - ITI, Rasra ITI, Mehdawal 25. ITI, Unnao - ITI, Saidpur ITI, Mohammadi 26. ITI, Salon ITI, Najibabad 27. ITI, Sarsawa ITI, Nawabganj 28. ITI, Seorahi ITI, Puwayan 29. ITI, Shahganj Jaunpur ITI, Tanda 30. ITI, Sirathu 31. ITI, Faridpur,

Upload: vothien

Post on 09-Mar-2018

290 views

Category:

Documents


11 download

TRANSCRIPT

Page 1: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Uttar Pradesh

S No. 2007-08 2008-09 2009-10 2010-11 2011-121. ITI, Azamgarh ITI, Agra (W) ITI, Amethi ITI, Chhanvey ITI, Akbarpur2. ITI, Banda ITI, Aonla Barielly ITI, Barabanki ITI, Ibrahimbad ITI, Alapur3. ITI, Budaun ITI, Atrauli ITI, Campierganj ITI, Kasganj ITI, Anandpur

Jharki4. ITI, Charbagh,

LucknowITI, Aliganj, LucknowWB (W)

ITI, Chandauli ITI, Sambhal ITI, Atrauli(Hardoi)

5. ITI, Chaukaghat,Varanasi

ITI, Bijnor ITI, Charkari ITI, (W) Sultanpur ITI,Barhalganj

6. ITI, Chandausi ITI, Bachcha Park,Meerut

ITI, Gauriganj ITI, BhadohiSant RavidasNagar

7. ITI, Deoria ITI, Barielly (W) ITI, Gorakhpur (W) ITI, Bihar8. ITI, Etah ITI, Civil Lines

BareillyITI, Hathras ITI, Bilsi

9. ITI, Faizabad ITI, Chaukaghat,Varanasi WB (W)

ITI, Jagdishpur ITI, ChandanChauki

10. ITI, Fatehpur ITI, Ghatampur ITI, Javer ITI, Dadri11. ITI, Farrukhabad ITI, Gulaoti ITI, Jhansi (W) ITI, Dhampur12. ITI, Gonda ITI, Katra Allahbad

(WW)ITI, Kadipur ITI, Fatehpur

13. ITI, Hardoi ITI, Katara ITI, Khajni ITI, MahillaCharbagh

14. ITI, Jaunpur ITI, Kanpur WB (W) ITI, LalganjAzamgarh

ITI,Gondlamau

15. ITI, Mathura ITI, Raibareli (W) ITI, Lalitpur ITI,Hasanganj

16. ITI, Mahova ITI, Railway Colony,Gorakhpur

ITI, Maharajganj ITI, Jalesar

17. ITI, Mau ITI, Simbhaoli ITI, MankapurGonda

ITI, Kairana

18. ITI, Mainpuri ITI, Saket, Meerut WB(W)

ITI, Modhonagar ITI, Kannauj

19. ITI, Orai - ITI, MohamdabadGohana

ITI, Khekra

20. ITI, Pilibhit - ITI, Musafirkhana ITI, Koil21. ITI, Partapgarh - ITI, Naurangia ITI, Lakhna22. ITI, Rampur (W) - ITI, Padrauna ITI, Lisad23. ITI,

Shahjahanpur- ITI, Patti ITI, Manda

24. ITI, Sitapur - ITI, Rasra ITI, Mehdawal25. ITI, Unnao - ITI, Saidpur ITI,

Mohammadi26. ITI, Salon ITI, Najibabad27. ITI, Sarsawa ITI,

Nawabganj28. ITI, Seorahi ITI, Puwayan29. ITI, Shahganj

JaunpurITI, Tanda

30. ITI, Sirathu31. ITI, Faridpur,

Page 2: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Bareilly32. ITI, Phoolpur,

Azamgarh

Page 3: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2007-08

Name of the ITI : ITI, Mainpuri

S. No. Particulars Details1 ITI (Name/Address) ITI, Mainpuri.

Ph No. 05672-234320E-mail [email protected] Of Establishment 1969

2 Name Of Principal Sh. P.P AtriPh No. 9319563529

3 Industry Partner (Address) M/s. Maharaja Agro Ltd. Oren mandal Agra Road,Mainpuri.

Ph No. 05672-2343204 IMC Chairman Sh. Rajendra Singh Yadav

Designation DirectorContact DetailsPh No.Fax No.E-Mail

NILNILNIL

5 Infrastructure AvailableLand Area (sq m) 109912 (OWN)

Constructed Area (sq m) Office: 720Workshop: 2350Hostel: 1216

6 Existing Trades Fitter (04), Turner (04), Machinist Vidhyut (02),Wireman (02), R/T.V (03), Motor Mech. (02),Electronics(02), RAC (01), Tractor Mech. (01), Welder(01), Cutting & Sewing Embroidery (01), StenographyHindi (01), Hair & Skin Care (01)

7 Intake Capacity/ Present Strength 3848 Intake Target after

implementation of PPP Scheme480

Upgradation of existing Trades Electrician, Fitter, Electronics.Opening of New trades NILOpening of CoE Refrigeration.

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 109.90 lakhs & 54.95 %12 Revenue (Dec 2011) 3.00 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh (Release)/2008-NIC &

29th Feb 2008

Page 4: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2007-08

Name of the ITI : ITI, Azamgarh

S. No. Particulars Details1 ITI (Name/Address) ITI, Azamgarh.

Ph No. 05462-267955E-mail NILYear Of Establishment 1962

2 Name Of Principal Sh. R.P YadavPh No. 09307494609

3 Industry Partner (Address) M/s. Laghu Udyog Samiti, AzamgarhPh No. 0522-2301957,9415513683

4 IMC Chairman Sh. Shiv Kumar RungataDesignation Partner

Contact DetailsPh No.Fax No.E-Mail

05462-291391,220716,941520776705462-291391NIL

5 Infrastructure AvailableLand Area (sq m) 60507 (OWN)

Constructed Area (sq m) Office: 730Workshop:2637Hostel: 736

6 Existing Trades Fitter (13), Turner (06), Machinist (04), Electricians(08), DMC (01), Welder (03), Sheet Metal (01),Carpenter (01), Plumber (01), Steno Hindi (01),Cutting & Sewing (01), Cutting & Sewing (Women)(01), Embroidery(W) (01)

7 Intake Capacity/ Present Strength 8538 Intake Target after

implementation of PPP SchemeNIL

Upgradation of existing Trades Fitter, Mechanic Motor Vehicle.Opening of New trades NILOpening of CoE Electrical.

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 85.47 lakhs & 42.73 %12 Revenue (Dec 2011) 2.79 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh (Release)/2008-NIC &

29th Feb 2008

Page 5: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2007-08

Name of the ITI : ITI, Gonda

S. No. Particulars Details1 ITI (Name/Address) ITI, Gonda.

Ph No. 05262-232343E-mail [email protected] Of Establishment 1958

2 Name Of Principal Sh. V.K. VishwakarmaPh No. 9415463200

3 Industry Partner (Address) M/s. Balrampur Sugar Mills Ltd., Balrampur UP.Ph No. 05262232343

4 IMC Chairman Sh. S k SinghDesignation AGM

Contact DetailsPh No.Fax No.E-Mail

05263-264671, 26468005263-232119NIL

5 Infrastructure AvailableLand Area (sq m) 19.41Acre (OWN)

Constructed Area (sq m) Office & Workshop: 4286.5554Hostel: 450.00

6 Existing Trades Fitter (05), Turner (03), Machinist (02), Electricians(04), Wireman (04), Electronics Mech. (02),Draughtsman Mech. (01), Motor Mechanics (02),Tool & Die Maker (01), Instrument Mech.(01), Welder(gas & Electric) (01), Steno Hindi (01), Cutting &Sewing (01)

7 Intake Capacity/ Present Strength 4368 Intake Target after

implementation of PPP Scheme532

Upgradation of existing Trades COPA, R.A.C.Opening of New trades NILOpening of CoE Fabrication(Fitting & Welding).

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 130.31 lakhs & 65.15 %12 Revenue (Dec 2011) 0.86 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh (Release)/2008-NIC &

29th Feb 2008

Page 6: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2007-08

Name of the ITI : ITI, Etah

S. No. Particulars Details1 ITI (Name/Address) ITI, Etah Lucknow.

Ph No. 05742-233032E-mail NILYear Of Establishment 1963

2 Name Of Principal Sh. Onkar SinghPh No. 9412305200

3 Industry Partner (Address) M/s. Educom Solution Ltd, 514,Udyog Vihar, Phase IIIGurgoan, Haryana.

Ph No. 05742-233402,94123052004 IMC Chairman Sh. Sharad Talwar

Designation Factory ManagerContact DetailsPh No.Fax No.E-Mail

0522-2721950NILNIL

5 Infrastructure AvailableLand Area (sq m) 15 Acre (OWN)

Constructed Area (sq m) Office: 525Workshop: 9327.75Hostel: 8089.56

6 Existing Trades Fitter (05), Turner (06), Machinist (02), Electricians(02), Welder (01), Wireman (02), Electronic Mech.(01), Motor Mechanics (02), RAC (02), RTV (01)

7 Intake Capacity/ Present Strength 3608 Intake Target after

implementation of PPP Scheme456

Upgradation of existing Trades Electrician, Fitter, Motor Mechanic.Opening of New trades NILOpening of CoE Electrical.

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 79.58 lakhs & 39.79 %12 Revenue (Dec 2011) 2.27 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh (Release)/2008-NIC &

29th Feb 2008

Page 7: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2007-08

Name of the ITI : ITI, Shahjahanpur

S. No. Particulars Details1 ITI (Name/Address) ITI, Shahjahanpur.

Ph No. 05842-235176E-mail [email protected] Of Establishment 1963

2 Name Of Principal Sh. Sant RamPh No. 9415306282

3 Industry Partner (Address) M/s. DSCL Loni HardoiPh No. 09810212320

4 IMC Chairman Sh. P Ranga RaoDesignation GM

Contact DetailsPh No.Fax No.E-Mail

09936997007NILNIL

5 Infrastructure AvailableLand Area (sq m) 58678 (OWN)

Constructed Area (sq m) Office: 400Workshop: 1200Hostel: 1000

6 Existing Trades Fitter (04), Turner (04), Machinist (02), Electricians(04), Wireman (02), Mech. Motor Vehicle (02), RAC(02), Mech. Radio/ TV (02), Welder (Gas & Elec.) (01),Cutting & Sewing(Man) (04), Cutting & Sewing(W)(01), Embroidery(W) (01), Steno Hindi (W) (01),Painter General (02), Draughtsman (Mech.) (02)

7 Intake Capacity/ Present Strength 5208 Intake Target after

implementation of PPP Scheme616

Upgradation of existing Trades Fitter, Refrigeration, Welder.Opening of New trades NILOpening of CoE Electrical.

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 75.53 lakhs & 37.77 %12 Revenue (Dec 2011) 0.22 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh (Release)/2008-NIC &

29th Feb 2008

Page 8: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2007-08

Name of the ITI : ITI, Faizabad

S. No. Particulars Details1 ITI (Name/Address) ITI, Faizabad.

Ph No. NILE-mail [email protected],[email protected] Of Establishment 1962

2 Name Of Principal Sh. R. R. YadavPh No. 9415720895

3 Industry Partner (Address) M/s. Azans Enterprises (P) Ltd.Ph No. 05278-251749

4 IMC Chairman Sh. Akhlaque Amhed KhanDesignation Managing Director

Contact DetailsPh No.Fax No.E-Mail

9415058284, [email protected]

5 Infrastructure AvailableLand Area (sq m) 8.57Acres (OWN)

Constructed Area (sq m) Office: 1140Workshop: 2600Hostel: 1150

6 Existing Trades Fitter (04), Turner (05), Electrician (04), Machinist(02), Machinist Grinder (01), Wireman (02), mech.Motor Vehicle (02), Draftsman Civil (02), Ref. & AC(02), Mech. Electronic (01), Electronic (W) (01),Stenography (Hindi) (01) ,Stenography(English) (01),Cutting & Sewing (01), Embroidery & Needle Work(01), Welder Gas & Electric (01)

7 Intake Capacity/ Present Strength 4648 Intake Target after

implementation of PPP Scheme560

Upgradation of existing Trades Electrician, Mechanic Motor Vehicle.Opening of New trades NILOpening of CoE Fabrication (Fitting & Welding).

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 96.33 lakhs & 48.17 %12 Revenue (Dec 2011) 1.40 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh (Release)/2008-NIC &

29th Feb 2008

Page 9: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2007-08

Name of the ITI : ITI, Fatehpur

S. No. Particulars Details1 ITI (Name/Address) ITI, Fatehpur.

Ph No. 05180-224492E-mail [email protected] Of Establishment 1962

2 Name Of Principal Sh. Sanjay AryaPh No. 05180-224492,9415702469

3 Industry Partner (Address) M/s. Lakshmi Cotsyn Ltd. Fatehpur.Ph No. 0512-2401492,2402893

4 IMC Chairman Devesh GuptaDesignation Deputy MD

Contact DetailsPh No.Fax No.E-Mail

0512-2401492,2402893,[email protected]

5 Infrastructure AvailableLand Area (sq m) 7 Acre (OWN)

Constructed Area (sq m) Office: 432Workshop: 370Hostel: 1500

6 Existing Trades Fitter (03), Turner (02), Mechanist (02), Electrician(02), DMC (02), R/TV (02), Wireman (02), MotorMechanic (02), Welder (01), Moulder (01), StenoHindi (01)

7 Intake Capacity/ Present Strength 3048 Intake Target after

implementation of PPP Scheme400

Upgradation of existing Trades Fitter, Electrician.Opening of New trades NILOpening of CoE Electrical.

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 176.47 Lakhs & 88.24 %12 Revenue (Dec 2011) 0.01Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh (Release)/2008-NIC &

18th Mar 2008

Page 10: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2007-08

Name of the ITI : ITI, Unnao

S. No. Particulars Details1 ITI (Name/Address) ITI, Unnao

Ph No. 0515-2820384E-mail [email protected] Of Establishment 1978

2 Name Of Principal Mr. R.N TripathiPh No. 9415506200

3 Industry Partner (Address) M/s. Super House Ltd. Unnao.Ph No. 9415506200

4 IMC Chairman Mr. MukhtarulDesignation Chairman & M.D

Contact DetailsPh No.Fax No.E-Mail

0515-2829037,28294520515-2829190,[email protected],[email protected]

5 Infrastructure AvailableLand Area (sq m) 1512.33 (OWN)

Constructed Area (sq m) Office:125.00Workshop: 886.30Hostel: NIL

6 Existing Trades Embroidery & Needle Work (01)7 Intake Capacity/ Present Strength 168 Intake Target after

implementation of PPP Scheme112

Upgradation of existing Trades Electrician, Draughts man Civil, Turner.Opening of New trades NILOpening of CoE RAC

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 144.06 lakhs & 72.03 %12 Revenue (Dec 2011) 0.33 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh (Release)/2008-NIC &

29th Feb 2008

Page 11: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2007-08

Name of the ITI : ITI, Hardoi

S. No. Particulars Details1 ITI (Name/Address) ITI, Hardoi.

Ph No. NILE-mail [email protected] Of Establishment 1963

2 Name Of Principal Mr. Arun KumarPh No. 9415564469

3 Industry Partner (Address) M/s. Dixit Enterprises Harpalpur HardoiPh No. NIL

4 IMC Chairman Sh. Ashok Kumar SharmaDesignation DSCL, Sugar

Contact DetailsPh No.Fax No.E-Mail

993509631005852-253184Ashok Kumar [email protected]

5 Infrastructure AvailableLand Area (sq m) 76593.42 (OWN)

Constructed Area (sq m) Office: 718Workshop: 4869.64Hostel: 669.74

6 Existing Trades Fitter (03), Turner (02), Machinist (02), Electrician(02), Draught’s Man Mechanic (02), Mech. RTV (02)Wireman (02), Mech. Motor Vech. (02), Welder (Gas& Elect.) (01), Stenography Hindi (01), Cutting &Sewing (01), Embroidery (01)

7 Intake Capacity/ Present Strength 3208 Intake Target after

implementation of PPP Scheme416

Upgradation of existing Trades Fitter, Electrician, Machinist.Opening of New trades NILOpening of CoE Fabrication (Fitting & Welding).

9 Seed Money 40.0010 Proposed Expenditure 210.0011 Expenditure & %age (Dec 2011) 34.54 lakhs & 16.45 %12 Revenue (Dec 2011) 0.58 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh (Release)/2008-NIC &

29th Feb 2008

Page 12: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2007-08

Name of the ITI : ITI, Sitapur

S. No. Particulars Details1 ITI (Name/Address) ITI, Sitapur.

Ph No. 05862252733E-mail NILYear Of Establishment 1963

2 Name Of Principal Sh. Umesh TanejaPh No. 9793320130

3 Industry Partner (Address) M/s. EDUCOMP Solution Gurgoan.Ph No. 05862252733

4 IMC Chairman Sh. Deepak MehlotraDesignation Vice President

Contact DetailsPh No.Fax No.E-Mail

9999470201NILNIL

5 Infrastructure AvailableLand Area (sq m) 3000 (OWN)

Constructed Area (sq m) Office: 400Workshop:1000Hostel: Available

6 Existing Trades Electrician (02), Wireman (02), Fitter (02), Turner(02), Machinist (02), Welder (01), D/M Civil (02), RTV(02), Electronic (01), Cutting & Tailoring (01), MotorMechanic (02)

7 Intake Capacity/ Present Strength 2888 Intake Target after

implementation of PPP Scheme384

Upgradation of existing Trades Electronics, D/M Mechanic.Opening of New trades NILOpening of CoE Fabrication (Fitting & Welding).

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 147.66 lakhs & 73.83 %12 Revenue (Dec 2011) 7.25 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh (Release)/2008-NIC &

18th Mar 2008

Page 13: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2007-08

Name of the ITI : ITI, Charbagh, Lucknow

S. No. Particulars Details1 ITI (Name/Address) ITI, Charbagh, Lucknow

Ph No. NILE-mail [email protected] Of Establishment 1965

2 Name Of Principal Sh. R.K SrivastavaPh No. 9415068602

3 Industry Partner (Address) M/s. PTC Industries Ltd. Malviya Nagar, Lucknow.Ph No. 9839727211

4 IMC Chairman Mr. Vivek MalhotraDesignation AGM

Contact DetailsPh No.Fax No.E-Mail

[email protected]

5 Infrastructure AvailableLand Area (sq m) 8143.50 (OWN)

Constructed Area (sq m) Office: 527Workshop: 3322Hostel: NIL

6 Existing Trades Electrician (02), RAC (02), Draughts Man Civil (01),Draught Mech. (01), Radio TV Electronic (01), Mech.Motor Mech. (02), Electroplater (02), Diesel Mech.(02), Sheet Mech. (01), Welder Gas& Electric (01),Stenography Hindi (01), Stenography English (01),Cutting Tailoring (02), Electronic Mech. (02)

7 Intake Capacity/ Present Strength 3368 Intake Target after

implementation of PPP Scheme432

Upgradation of existing Trades RAC.Opening of New trades NILOpening of CoE RAC

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 91.39 Lakhs & 45.69 %12 Revenue (Dec 2011) 0.02 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh (Release)/2008-NIC &

29th Feb 2008

Page 14: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2007-08

Name of the ITI : ITI, Chaukaghat

S. No. Particulars Details1 ITI (Name/Address) ITI, Chaukaghat, Varanasi.

Ph No. 0542-2206371E-mail NILYear Of Establishment 1928

2 Name Of Principal Sh. S.B. SinghPh No. 0542-2206371,9450182863

3 Industry Partner (Address) M/s. Hindustan Coca Cola Raja Talab Varanasi.Ph No. 9919792173

4 IMC Chairman Sh. R.K SrivastavaDesignation Vice President H.R

Contact DetailsPh No.Fax No.E-Mail

9415231645NILNIL

5 Infrastructure AvailableLand Area (sq m) 28329 (OWN)

Constructed Area (sq m) Office: 295Workshop: 2160Hostel: 530

6 Existing Trades Fitter (01), Tuner (01), wireman (01), Electronics (01),Electroplater (01), Welder (01), Steno Hindi (01)

7 Intake Capacity/ Present Strength 1088 Intake Target after

implementation of PPP Scheme204

Upgradation of existing Trades Electronics, Fitter, Wireman, Turner.Opening of New trades NILOpening of CoE Fabrication (Fitting & Welding).

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 44.49 lakhs & 22.24 %12 Revenue (Dec 2011) 2.50 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh (Release)/2008-NIC &

29th Feb 2008

Page 15: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2007-08

Name of the ITI : ITI, Mau

S. No. Particulars Details1 ITI (Name/Address) ITI, Mau.

Ph No. NILE-mail [email protected] Of Establishment 1991

2 Name Of Principal Sri. Mohd. NasimuddinPh No. 9450766841

3 Industry Partner (Address) M/s. Mahavir Industrial Enterprise Narabi Bandh,Mau.

Ph No. NIL4 IMC Chairman Sri. Siddharth Tharad

Designation PartnerContact DetailsPh No.Fax No.E-Mail

9415219883NILNIL

5 Infrastructure AvailableLand Area (sq m) 8310 (OWN)

Constructed Area (sq m) Office: 45.36Workshop: 2271.6Hostel: NIL

6 Existing Trades Weaving Of Woollen Fabric (01)7 Intake Capacity/ Present Strength 168 Intake Target after

implementation of PPP Scheme112

Upgradation of existing Trades Wireman, Electrical, Electronics..Opening of New trades NILOpening of CoE Electrical.

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 167.30 lakhs & 83.65 %12 Revenue (Dec 2011) 0.0013 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh (Release)/2008-NIC &

29th Feb 2008

Page 16: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2007-08

Name of the ITI : ITI, Chandausi

S. No. Particulars Details1 ITI (Name/Address) ITI, Chandausi.

Ph No. NILE-mail [email protected] Of Establishment 1969

2 Name Of Principal Sh. Radhe KrishanPh No. 9412305463

3 Industry Partner (Address) M/s. EDUCOMP Solution Ltd. Maa Apartment, Flat No102,2c/32-33, Vikas Nagar-2 Lucknow.

Ph No. 94123054534 IMC Chairman Sh. Sharad Talwar

Designation Area ManagerContact DetailsPh No.Fax No.E-Mail

[email protected]

5 Infrastructure AvailableLand Area (sq m) 44757.67 (OWN)

Constructed Area (sq m) Office:416.94Workshop:Hostel:

6 Existing Trades Fitter (02), Turner (03), Machinist (02), Electrician(02), R/ TV (01), Wireman (02), Motor Mechanic (02),Steno Hindi (01)

7 Intake Capacity/ Present Strength 2208 Intake Target after

implementation of PPP Scheme316

Upgradation of existing Trades Electrician, Turner, Motor Mechanic.Opening of New trades NILOpening of CoE Electrical.

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 143.59 lakhs & 71.08 %12 Revenue (Dec 2011) 3.72 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh (Release)/2008-NIC &

29th Feb 2008

Page 17: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2007-08

Name of the ITI : ITI, Budaun

S. No. Particulars Details1 ITI (Name/Address) ITI, Budaun.

Ph No. NILE-mail NILYear Of Establishment 1977

2 Name Of Principal Sh. Saghirul HasanPh No. 09412376148

3 Industry Partner (Address) M/s. Param Engineers Pvt. Ltd. Bareilly.Ph No. 09837038937

4 IMC Chairman Mr. Suresh Chandra SundraniDesignation GM

Contact DetailsPh No.Fax No.E-Mail

09837038937NILNIL

5 Infrastructure AvailableLand Area (sq m) 39793.5 (OWN)

Constructed Area (sq m) Office: 600Workshop: 1600Hostel: NIL

6 Existing Trades Fitter (02)7 Intake Capacity/ Present Strength 328 Intake Target after

implementation of PPP Scheme128

Upgradation of existing Trades Electrician, Welder, Fitter.Opening of New trades NIL.Opening of CoE Electrical

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 79.69 lakhs & 38.84 %12 Revenue (Dec 2011) 0.44 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh (Release)/2008-NIC &

29th Feb 2008

Page 18: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2007-08

Name of the ITI : ITI, Farrukhabad

S. No. Particulars Details1 ITI (Name/Address) ITI, Farrukhabad.

Ph No. 05692-222057E-mail NILYear Of Establishment 1963

2 Name Of Principal Sh. K M SinghPh No. 9415289578

3 Industry Partner (Address) M/s. Vidhya Ply & Board Pvt. Ltd. GandhigangShahjahanpur.

Ph No. 05692-2220574 IMC Chairman Mr. Ashok Aggarwal

Designation ChairmanContact DetailsPh No.Fax No.E-Mail

05842-240322,[email protected]

5 Infrastructure AvailableLand Area (sq m) 473.39 (OWN)

Constructed Area (sq m) Office: 278.81Workshop: 2338.01Hostel: 836.43

6 Existing Trades Fitter (04), Turner (06), Machinist Grinder (02),Machinist (04), Electrician (04), Draught’s ManMechanic (02) & Civil (02), Wireman (02), Mech.Motor Vech. (02), Stenography Hindi (01), Cutting &Sewing (01), R/AC Mach. (01), General Electronic(02), Mech. Tractors (01), Mech. Diesel (01)

7 Intake Capacity/ Present Strength 5128 Intake Target after

implementation of PPP Scheme608

Upgradation of existing Trades Welder, Mech. Agriculture Machinery.Opening of New trades NILOpening of CoE Electrical

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 106.21 lakhs & 53.01 %12 Revenue (Dec 2011) 0.0013 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh (Release)/2008-NIC &

29th Feb 2008

Page 19: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2007-08

Name of the ITI : ITI, Orai

S. No. Particulars Details1 ITI (Name/Address) ITI, Orai Jalaun UP.

Ph No. 05162-210331E-mail [email protected] Of Establishment 1964

2 Name Of Principal Sh. Ashish DubeyPh No. 05162-210331,9918298215

3 Industry Partner (Address) M/s. Ramshree Foods Pvt. Ltd., Phase I IndustriesArea Orai.

Ph No. 9415032141, 93362741364 IMC Chairman Sh. Pratap Nigotia

Designation MDContact DetailsPh No.Fax No.E-Mail

9415032141, 9336274136NILNIL

5 Infrastructure AvailableLand Area (sq m) 1991.36 (OWN)

Constructed Area (sq m) Office: 1231Workshop: 1945Hostel: 867

6 Existing Trades Fitter (02), Turner (03), Mechanist (02), Electrician(02), Mech. R/TV (02), Wireman (02), mech. MotorVehicle (02), Painter General (01), Welder (01), Mech.Tractor (01), Mech. Diesel (01), Plumber (01)

7 Intake Capacity/ Present Strength 2408 Intake Target after

implementation of PPP Scheme336

Upgradation of existing Trades Electrician, Fitter.Opening of New trades NILOpening of CoE Electrical.

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 198.02 lakhs & 99.01 %12 Revenue (Dec 2011) 0.24 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh (Release)/2008-NIC &

29th Feb 2008

Page 20: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2007-08

Name of the ITI : ITI, Deoria

S. No. Particulars Details1 ITI (Name/Address) ITI, Deoria.

Ph No. NILE-mail [email protected] Of Establishment 1963

2 Name Of Principal Sh. A K MadhurPh No. 9415357900

3 Industry Partner (Address) M/s. Chemical & Allied Products.Ph No. 9415213403

4 IMC Chairman Sh. J P JaiswalDesignation MD

Contact DetailsPh No.Fax No.E-Mail

9454333980NILNIL

5 Infrastructure AvailableLand Area (sq m) 68811 (OWN)

Constructed Area (sq m) Office755:Workshop: 2200Hostel: 630

6 Existing Trades Fitter (09), Turner (06), Machinist (06), Electrician(06), Wireman (04), Machinist Grinder (02), Machinist(04), DM Mech. (02), DM Civil (01), R/AC (01), MotorMechanic (01), Electronic Radio & T.V (01), Moulder(01), Welder (02), Sheet Metal (01), Diesel Mech.(01), Steno Hindi (01)

7 Intake Capacity/ Present Strength 6648 Intake Target after

implementation of PPP Scheme760

Upgradation of existing Trades Fitter, Turner, Machinist.Opening of New trades NILOpening of CoE Automobile.

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 54.12 lakhs & 27.06 %12 Revenue (Dec 2011) 2.60 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh (Release)/2008-NIC &

29th Feb 2008

Page 21: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2007-08

Name of the ITI : ITI, Banda

S. No. Particulars Details1 ITI (Name/Address) ITI, Banda.

Ph No. 05192-2855382E-mail NILYear Of Establishment 1970

2 Name Of Principal Sh. P.K. ShakyawarPh No. 05192-285382,9235737806

3 Industry Partner (Address) M/s. Ram Shree Foods Pvt. Ltd., Industrial Area KalpiRoad Orai.

Ph No. 94150321414 IMC Chairman Sri Pradeep Kumar Negotiya

Designation NILContact DetailsPh No.Fax No.E-Mail

9415032141NILNIL

5 Infrastructure AvailableLand Area (sq m) 13.3 Acre (OWN)

Constructed Area (sq m) Office: 1120Workshop: 3800Hostel: 1142

6 Existing Trades Fitter (03), Mechanist (0), Electrician (02), Wireman(02), R/AC (02), Moulder (01), Welder (01), SheetMetal (01), Steno Hindi (W) (01), DM Civil (02),Mech. Motor Vehicle (02), Steno Hindi(M) (01),Cutting & Tailoring (01), Embodying & Needle Work(01), Mech. R&TV (02), Carpenter (01)

7 Intake Capacity/ Present Strength 3488 Intake Target after

implementation of PPP Scheme444

Upgradation of existing Trades Electrician, Electronics.Opening of New trades NILOpening of CoE Fabrication (Fitting & Welding).

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 63.02 lakhs & 31.15 %12 Revenue (Dec 2011) 1.48 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh (Release)/2008-NIC &

29th Feb 2008

Page 22: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2007-08

Name of the ITI, Mathura

S. No. Particulars Details1 ITI (Name/Address) ITI, Mathura Vrindavan Road Mathura.

Ph No. 0565-24426368E-mail [email protected] Of Establishment 1965

2 Name Of Principal Sh. Dharamveer SinghPh No. 9837413878, 9628374367

3 Industry Partner (Address) M/s. Giriraj Foils Pvt. Ltd.Ph No. NIL

4 IMC Chairman Sh. Lalit AroraDesignation President

Contact DetailsPh No.Fax No.E-Mail

[email protected]

5 Infrastructure AvailableLand Area (sq m) 35000 (OWN)

Constructed Area (sq m) Office750:Workshop: 1100Hostel: 400

6 Existing Trades Fitter (06), Turner (04), Mechanist (02), Electrician(03), Wireman (02), Draftsman Mech. (01),Instrument Mech. (01), Machinist (01), DM Mech.(01), Electronic Mech. (02), Welder (01), Foundryman (01), Cutting & Sewing (01), Steno Hindi (01),Mech. Diesel (01)

7 Intake Capacity/ Present Strength 4208 Intake Target after

implementation of PPP Scheme516

Upgradation of existing Trades Fitter, Turner, Electrician, RAC.Opening of New trades NILOpening of CoE Production & Manufacturing.

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 188.28 Lakhs & 94.14 %12 Revenue (Dec 2011) 6.22 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh (Release)/2008-NIC &

29th Feb 2008

Page 23: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2007-08

Name of the ITI : ITI, Pilibhit

S. No. Particulars Details1 ITI (Name/Address) ITI, Pilibhit.

Ph No. 05882-255917E-mail [email protected] Of Establishment 1962

2 Name Of Principal Sh. M. C. SharmaPh No. 9412535694

3 Industry Partner (Address) M/s. L.H. Sugar Factories Ltd., Pilibhit.Ph No. 9259094016

4 IMC Chairman Sh. G P GoyalDesignation G.M.

Contact DetailsPh No.Fax No.E-Mail

05882-255518, [email protected]

5 Infrastructure AvailableLand Area (sq m) 8.80 Acre (OWN)

Constructed Area (sq m) Office:843Workshop : 3481Hostel: 153

6 Existing Trades Fitter (06), Turner (04), Mechanist (02), Electrician(04), Wireman (02), R/TV (02), Motor Mech. (02),Welder (01), Cutting & Tailoring (01), Steno Hindi(01), Embroidery (01)

7 Intake Capacity/ Present Strength 3928 Intake Target after

implementation of PPP Scheme488

Upgradation of existing Trades Electrician, Fitter.Opening of New trades NILOpening of CoE Production & Manufacturing.

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 180.54 lakhs & 90.27 %12 Revenue (Dec 2011) 2.92 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh (Release)/2008-NIC &

29th Feb 2008

Page 24: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2007-08

Name of the ITI : ITI, Rampur (W)

S. No. Particulars Details1 ITI (Name/Address) ITI, Rampur (W)

Ph No. 0595-2324732E-mail [email protected] Of Establishment 1965

2 Name Of Principal Sh. Manjul MayankPh No. 9548846437

3 Industry Partner (Address) M/s. Xerox India Ltd. Rampur.Ph No. 9839579874

4 IMC Chairman Mr. Alok SexsenaDesignation Senior Manager

Contact DetailsPh No.Fax No.E-Mail

9719263650NILNIL

5 Infrastructure AvailableLand Area (sq m) 1147 (OWN)

Constructed Area (sq m) Office: 61.56Workshop: 662.50Hostel: NIL

6 Existing Trades Cutting & Sewing (02), Embroidery& Needles Works(01), Steno Hindi (01)

7 Intake Capacity/ Present Strength 648 Intake Target after

implementation of PPP Scheme224

Upgradation of existing Trades Cutting & Swing, Embroidery & Needle Work, Hair &Skin Care, Steno Hindi.

Opening of New trades COPA, Dress Making, Fashion Technology, SecretarialPractice.

Opening of CoE Apparel9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 191.57 lakhs & 95.79 %12 Revenue (Dec 2011) 0.28 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh (Release)/2008-NIC &

25th Mar 2008

Page 25: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2007-08

Name of the ITI : ITI, Jaunpur

S. No. Particulars Details1 ITI (Name/Address) ITI, Jaunpur.

Ph No. 05452-252220E-mail NILYear Of Establishment 1962

2 Name Of Principal Sh. Ashok KumarPh No. 9450626506

3 Industry Partner (Address) M/s. Kapoor Engg. Works, Industrial Area, Jadishpur,Jaunpur.

Ph No. 94511579624 IMC Chairman Sh. Tribhuwan Singh

Designation General ManagerContact DetailsPh No.Fax No.E-Mail

NILNILNIL

5 Infrastructure AvailableLand Area (sq m) 450 (OWN)

Constructed Area (sq m) Office: 450Workshop: 3170Hostel: 835

6 Existing Trades Fitter (07), Machinist (02), Turner (06), Electrician(08), Wireman (02), Electronics Mech. (02), MotorMech. (02), Welder (02), Cutting & Tailoring (01),Embroidery (01), Steno( G+F) (01)

7 Intake Capacity/ Present Strength 5128 Intake Target after

implementation of PPP Scheme608

Upgradation of existing Trades Electrician, Fitter.Opening of New trades NILOpening of CoE Production & Manufacturing.

9 Seed Money 0.0010 Proposed Expenditure 250.0011 Expenditure & %age (Dec 2011) 61.70 lakhs & 24.68 %12 Revenue (Dec 2011) 0.0013 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh (Release)/2008-NIC &

25th Mar 2008

Page 26: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2007-08

Name of the ITI : ITI, Mahoba

S. No. Particulars Details1 ITI (Name/Address) ITI, Mahoba, Police Line Mahoba.

Ph No. 05281-254765E-mail [email protected] Of Establishment 1977

2 Name Of Principal Sh. RamprakeshPh No. 05281-254765

3 Industry Partner (Address) M/s. Betva Steel IndustriesPh No. 05281-254765

4 IMC Chairman Mr. Satish UttamDesignation Prop.

Contact DetailsPh No.Fax No.E-Mail

[email protected]

5 Infrastructure AvailableLand Area (sq m) 25000 (OWN)

Constructed Area (sq m) Office: 543Workshop: 452Hostel: NIL

6 Existing Trades Wireman (01)7 Intake Capacity/ Present Strength 168 Intake Target after

implementation of PPP Scheme112

Upgradation of existing Trades NILOpening of New trades NILOpening of CoE Fabrication.

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 159.10 lakhs & 79.55 %12 Revenue (Dec 2011) 3.01 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh (Release)/2008-NIC &

25th Mar 2008

Page 27: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2007-08

Name of the ITI : ITI, Partapgarh

S. No. Particulars Details1 ITI (Name/Address) ITI, Partapgarh.

Ph No. 05342-220429E-mail NILYear Of Establishment 1962

2 Name Of Principal Sh. Vijay Kant VermaPh No. 05342-220429

3 Industry Partner (Address) M/s. Maya Industries Ltd. Pratapgarh.Ph No. 9839579874

4 IMC Chairman Sh. Pavan Kumar AgarwalDesignation NIL

Contact DetailsPh No.Fax No.E-Mail

NILNILNIL

5 Infrastructure AvailableLand Area (sq m) 4900 (OWN)

Constructed Area (sq m) Office: 430.50Workshop: 1872Hostel: NIL

6 Existing Trades Fitter (04), Turner (03), Machinist (02), Electrician(02), Wireman (02), Welder (02)

7 Intake Capacity/ Present Strength 2208 Intake Target after

implementation of PPP Scheme316

Upgradation of existing Trades Electrical.Opening of New trades NILOpening of CoE Fabrication.

9 Seed Money 25.0010 Proposed Expenditure 225.0011 Expenditure & %age (Dec 2011) 75.53 lakhs & 33.57 %12 Revenue (Dec 2011) 0.42 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh (Release)/2008-NIC &

25th Mar 2008

Page 28: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2008-09

Name of the ITI: ITI, Ghatampur

S. No. Particulars Details1 ITI (Name/Address) G.I.T.I. Ghatampur.

Ph No. NILE-mail [email protected] Of Establishment 1983

2 Name Of Principal Sh. Mukesh KumarPh No. 9628371976

3 Industry Partner (Address) M/S. Automobile Industries, Ghatampur, KanpurNagar, Uttar Pradesh.

Ph No. 094150932144 IMC Chairman Sh. Ravindra Awasthi

Designation DirectorContact DetailsPh No.Fax No.E-Mail

9415536056NILNIL

5 Infrastructure AvailableLand Area (sq m) 3000 (OWN)

Constructed Area (sq m) Office:400Workshop:1000Hostel: NIL

6 Existing Trades Cutting & Tailoring (01), Steno Hindi (01)7 Intake Capacity/ Present Strength 328 Intake Target after

implementation of PPP Scheme128

Upgradation of existing Trades NILOpening of New trades NILOpening of CoE Auto Mobile(Fitting & Welding).

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 157.63 lakhs & 78.82 %12 Revenue (Dec 2011) 0.33 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh (Release)/2008-NIC &

24th Dec 2008

Page 29: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2008-09

Name of the ITI: ITI, Bijnor

S. No. Particulars Details1 ITI (Name/Address) G.I.T.I. Bijnor.

Ph No. 01342-252047E-mail [email protected] Of Establishment 1964

2 Name Of Principal Sh. Susheel KumarPh No. 09837329224

3 Industry Partner (Address) M/s. Hindustan Coca Cola.Ph No. 09899998967

4 IMC Chairman Mr. A. K. JainDesignation Manager

Contact DetailsPh No.Fax No.E-Mail

9897029977NILNIL

5 Infrastructure AvailableLand Area (sq m) 100440 (OWN)

Constructed Area (sq m) Office:306Workshop:3074Hostel:1236

6 Existing Trades Fitter (06), Turner (02), Machinist (02), Electrician(03), Mech. RAC (02), Mech. RTV (02), Wireman (02),Welder (02), Mech. Tractor (02), Steno Hindi(Boys)(01), Steno Hindi(Girls) (01)

7 Intake Capacity/ Present Strength 3848 Intake Target after

implementation of PPP Scheme480

Upgradation of existing Trades Turner, Machinist, Mech. RAC.Opening of New trades NILOpening of CoE Electrical.

9 Seed Money 40.0010 Proposed Expenditure 210.0011 Expenditure & %age (Dec 2011) 74.62 Lakhs & 35.53 %12 Revenue (Dec 2011) 0.0013 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh (Release)/2008-NIC &

24th Dec 2008

Page 30: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2008-09

Name of the ITI: ITI, Gulaoti

S. No. Particulars Details1 ITI (Name/Address) G.I.T.I. Gulaoti, Bulandshar.

Ph No. 05732-268104E-mail [email protected] Of Establishment 1988

2 Name Of Principal Sh. Rajesh RamPh No. NIL

3 Industry Partner (Address) M/S. Mohan Dairy& Industries, Syana Road Rd.Bulandshar.

Ph No. 09219559375,094122273754 IMC Chairman Sh. B. M. Agrawal

Designation PartnerContact DetailsPh No.Fax No.E-Mail

09412227375, 09219559375NILNIL

5 Infrastructure AvailableLand Area (sq m) 10 Acre (OWN)

Constructed Area (sq m) Office:404.68Workshop:1112.44Hostel: NIL

6 Existing Trades Electrician (02), Wireman (02)7 Intake 648 Intake Target after

implementation of PPP Scheme208

Upgradation of existing Trades Wireman, Electronics.Opening of New trades Fitter, Welder, Electronics.Opening of CoE Electrical .

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 79.54 Lakhs & 39.77 %12 Revenue (Dec 2011) 2.47 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh (Release)/2008-NIC &

24th Dec 2008

Page 31: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2008-09

Name of the ITI: ITI (W), Agra

S. No. Particulars Details1 ITI (Name/Address) G.I.T.I.(W), Agra, World Bank, Agra.

Ph No. NILE-mail NILYear Of Establishment 1994

2 Name Of Principal Km. Qamar SarfrazPh No. 09412596138

3 Industry Partner (Address) M/s. Indian Industries Association, 11A Bhavan,Vibhuti Khand Phase II, Gomtinagar Lucknow.

Ph No. 562-28527444 IMC Chairman Mr. Indra Chand Jain

Designation Divisional ChairmanContact DetailsPh No.Fax No.E-Mail

0562-28527440562-2720097NIL

5 Infrastructure AvailableLand Area (sq m) 1695 (OWN)

Constructed Area (sq m) Office:60Workshop:290Hostel: NIL

6 Existing Trades Mech. Radio & TV (01), Electronics (01), Steno Hindi(01), Cutting & Sewing (04), Embroidery (01)

7 Intake Capacity/ Present Strength 1288 Intake Target after

implementation of PPP Scheme224

Upgradation of existing Trades NILOpening of New trades NILOpening of CoE Apparel

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 58.78 lakhs & 29.39 %12 Revenue (Dec 2011) 0.77 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh (Release)/2008-NIC &

24th Dec 2008

Page 32: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2008-09

Name of the ITI: ITI, Civil Lines

S. No. Particulars Details1 ITI (Name/Address) ITI, Civil Lines , 26 Civil Lines, Bariely.

Ph No. 0581-2560862E-mail [email protected] Of Establishment 1911

2 Name Of Principal Sh. Syed Ali HazoorPh No. 9917672786, 9628374327

3 Industry Partner (Address) M/s. Himalaya Furniture, Near Hind Talkies Bareilly.Ph No. 0581-2560862

4 IMC Chairman Mr. Mehtab Ahmad KhanDesignation Prop.

Contact DetailsPh No.Fax No.E-Mail

9412565806,9897894666NILNIL

5 Infrastructure AvailableLand Area (sq m) 12200 (OWN)

Constructed Area (sq m) Office:200Workshop:1300Hostel: NIL

6 Existing Trades Carpenter (03), Upholster (01), Pinter General (01)7 Intake Capacity/ Present Strength 808 Intake Target after

implementation of PPP Scheme176

Upgradation of existing Trades Carpenter, Upholster, Pinter General.Opening of New trades NILOpening of CoE Construction & Wood Working.

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 185.85 Lakhs & 92.93 %12 Revenue (Dec 2011) 0.38 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh (Release)/2008-NIC &

23rd Feb 2009

Page 33: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2008-09

Name of the ITI: ITI, Aonla Barielly

S. No. Particulars Details1 ITI (Name/Address) ITI, Aonla Barielly.

Ph No. 0581-2560862E-mail [email protected] Of Establishment 1989

2 Name Of Principal Mr. Manoj Kumar DubeyPh No. 9412847731

3 Industry Partner (Address) M/s. J K Sugar MillPh No. 0581-2560862

4 IMC Chairman Mr. B N ChoudharyDesignation GM

Contact DetailsPh No.Fax No.E-Mail

[email protected]

5 Infrastructure AvailableLand Area (sq m) 6000 (OWN)

Constructed Area (sq m) Office & Workshop:570Hostel: NIL

6 Existing Trades Wireman (02), Electronics (02), R& TV (02)7 Intake Capacity/ Present Strength 968 Intake Target after

implementation of PPP Scheme186

Upgradation of existing Trades Wireman, Electronics, R& TV.Opening of New trades NILOpening of CoE Electronics

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 171.76Lakhs & 85.88 %12 Revenue (Dec 2011) 0.0013 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh (Release)/2008-NIC &

23rd Feb 2009

Page 34: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2008-09

Name of the ITI: ITI (W), Barielly

S. No. Particulars Details1 ITI (Name/Address) ITI (W), Barielly26 Civil Lines, Kasth Kala Kendra

Compound Bariely.Ph No. 0581-2560862E-mail [email protected] Of Establishment 1995

2 Name Of Principal Mr. Syed Ali HazoorPh No. 9917672786, 9628374327

3 Industry Partner (Address) M/s. Narayan Education Society Bareilly.Ph No. 0581-2560862

4 IMC Chairman Mr. Sashi BhushanDesignation Chairman

Contact DetailsPh No.Fax No.E-Mail

098978946660581-2540742

5 Infrastructure AvailableLand Area (sq m) 1 Acre 5670 sq (OWN)

Constructed Area (sq m) Office:200Workshop:1700Hostel: NIL

6 Existing Trades COPA (03), D/M Civil (01), Electronics (01), Radio &TV (01), Others-Fashion Tech.

7 Intake Capacity/ Present Strength 968 Intake Target after

implementation of PPP Scheme240

Upgradation of existing Trades COPA, D/M Civil, Electronics, Radio & TV, FashionTech.

Opening of New trades Computer Aided Pattern Making, Fashion Designing,Shirts & Trousers .

Opening of CoE Apparel Sector.9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 191.33 Lakhs & 95.67 %12 Revenue (Dec 2011) 0.24 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh (Release)/2008-NIC &

23rd Feb 2009

Page 35: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2008-09

Name of the ITI: ITI, Katara

S. No. Particulars Details1 ITI (Name/Address) ITI, Katara, Allahabad.

Ph No. 0532-640704E-mail NILYear Of Establishment 1918

2 Name Of Principal MR. V.K. SrivastavaPh No. 9415369348

3 Industry Partner (Address) M/s. Allahabad Dairy.Ph No. 0522-2720090

4 IMC Chairman Mr. Tehir HasanDesignation Vice Chairman

Contact DetailsPh No.Fax No.E-Mail

9415218142NILNIL

5 Infrastructure AvailableLand Area (sq m) 18548 (OWN)

Constructed Area (sq m) Office:146Workshop:1561Hostel: NIL

6 Existing Trades Carpenter (01)7 Intake capacity/ Present Strength 328 Intake Target after

implementation of PPP Scheme128

Upgradation of existing Trades Carpenter.Opening of New trades NILOpening of CoE Woodworking.

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 0.0012 Revenue (Dec 2011) 0.0013 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh (Release)/2008-NIC &

23rd Feb 2009

Page 36: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2008-09

Name of the ITI: ITI, Simbhaoli

S. No. Particulars Details1 ITI (Name/Address) ITI, Simbhaoli, Ghaziabad.

Ph No. NILE-mail [email protected] Of Establishment 1998

2 Name Of Principal Sh. Nawab SinghPh No. 9873757435

3 Industry Partner (Address) M/s. Sri Ram Piston & Rings Ltd., Meerut Road,Ghaziabad.

Ph No. 099102674914 IMC Chairman Sh. K. K. Sharma

Designation AGMContact DetailsPh No.Fax No.E-Mail

99102674910120-2711852NIL

5 Infrastructure AvailableLand Area (sq m) 120000 (OWN)

Constructed Area (sq m) Office:60Workshop:1050 GF,752Hostel: NIL

6 Existing Trades Electrician (01), Mech. Radio &TV (01), Mech. RAC(01)

7 Intake Capacity/ Present Strength 488 Intake Target after

implementation of PPP Scheme144

Upgradation of existing Trades NILOpening of New trades NILOpening of CoE Electrical.

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 101.04 Lakhs & 50.52 %12 Revenue (Dec 2011) 16.81 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh (Release)/2008-NIC &

23rd Feb 2009

Page 37: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2008-09

Name of the ITI: ITI, Atrauli

S. No. Particulars Details1 ITI (Name/Address) ITI, Atrauli, Aligarh.

Ph No. NILE-mail [email protected] Of Establishment 1992

2 Name Of Principal Mr. Abdullah SalmanPh No. 9837469908

3 Industry Partner (Address) M/s. Manish International.Ph No. 0571-2402327/240482

4 IMC Chairman Mr. Satish GaurDesignation Partner

Contact DetailsPh No.Fax No.E-Mail

0571-2402327/[email protected]

5 Infrastructure AvailableLand Area (sq m) 5 Acre (OWN)

Constructed Area (sq m) Office:200.00Workshop:350.00Hostel:250.00

6 Existing Trades Electrician (01), Mech. Electronics (01), Wireman(01), COPA (01), Draughtsman Mechanical (01),Instrument Mech. (01)

7 Intake Capacity/ Present Strength 968 Intake Target after

implementation of PPP Scheme240

Upgradation of existing Trades NILOpening of New trades COPA, Draughtsman Mechanical, Instrument Mech.Opening of CoE Electrical Sector.

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 114.51 Lakhs & 57.08 %12 Revenue (Dec 2011) 1.56 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh (Release)/2008-NIC &

23rd Feb 2009

Page 38: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2008-09

Name of the ITI: ITI (W), Katra

S. No. Particulars Details1 ITI (Name/Address) ITI (WW), Katra Allahbad.

Ph No. 0532-640704E-mail [email protected] Of Establishment 1995

2 Name Of Principal Mr. G S YadavPh No. 9415846246

3 Industry Partner (Address) M/s. Allahabad Dairy, Allahabad.Ph No. 0522-2720090

4 IMC Chairman Mr. Tahir HasanDesignation Vice Chairman

Contact DetailsPh No.Fax No.E-Mail

9415218142NILNIL

5 Infrastructure AvailableLand Area (sq m) 3936 (OWN)

Constructed Area (sq m) Office:41083Workshop:207.49Hostel: NIL

6 Existing Trades Electronics (03), Radio& TV (03), Secretarial Practice(02)

7 Intake Capacity/ Present Strength 1288 Intake Target after

implementation of PPP Scheme224

Upgradation of existing Trades Electronics, Radio& TV, Secretarial Practice.Opening of New trades NILOpening of CoE Electronics

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 123.72 Lakhs & 61.86 %12 Revenue (Dec 2011) 0.0013 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh (Release)/2008-NIC &

23rd Mar 2009

Page 39: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2008-09

Name of the ITI: ITI, Ali Ganj

S. No. Particulars Details1 ITI (Name/Address) ITI, WB-W, Ali Ganj, Lucknow.

Ph No. 0522-2331217E-mail [email protected] Of Establishment 1995

2 Name Of Principal Mr. RajkumarPh No. 9839566467

3 Industry Partner (Address) M/s. Kanjaria Associates Pvt. Ltd., C 21, Sector B,AliGanj, Lucknow.

Ph No. 94151901004 IMC Chairman Mr. K. K. Agrawal

Designation NILContact DetailsPh No.Fax No.E-Mail

[email protected]

5 Infrastructure AvailableLand Area (sq m) 6800 (OWN)

Constructed Area (sq m) Office:63.00Workshop:1377Hostel: NIL

6 Existing Trades COPA (03), Hair & Skin Care (02), Secretarial Practice(02), Cutting & Tailoring (03), Hindi Steno (02),English Steno (02)

7 Intake Capacity/ Present Strength 2248 Intake Target after

implementation of PPP Scheme320

Upgradation of existing Trades Hair & Skin Care, Secretarial Practice.Opening of New trades NILOpening of CoE Information Technology.

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 42.56 Lakhs & 21.28 %12 Revenue (Dec 2011) 0.0013 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh (Release)/2008-NIC &

23rd Mar 2009

Page 40: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2008-09

Name of the ITI: ITI (WB-W), Kanpur

S. No. Particulars Details1 ITI (Name/Address) ITI, (WB-W), Kanpur.

Ph No. NILE-mail NILYear Of Establishment 1993

2 Name Of Principal Sh. R.K. YadavPh No. 9450036359

3 Industry Partner (Address) M/s. Kirpal Textile Mills Pvt. Ltd, Kanpur.Ph No. 9450036359

4 IMC Chairman Sh. Tarun Kumar KheterpalDesignation NIL

Contact DetailsPh No.Fax No.E-Mail

9415040783NILNIL

5 Infrastructure AvailableLand Area (sq m) 1000 (OWN)

Constructed Area (sq m) Office:725Workshop: NILHostel: NIL

6 Existing Trades COPA (02), Mech. R/TV (02), Steno Hindi (03), StenoEnglish (02), Dress Making (02), Cutting & Sewing(04), Embroidery (02), Electronics (02)

7 Intake 3048 Intake Target after

implementation of PPP Scheme304

Upgradation of existing Trades Computers, , Mech. R/TV.Opening of New trades NILOpening of CoE NIL

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 17.02 Lakhs & 7.40 %12 Revenue (Dec 2011) 0.0013 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh (Release)/2008-NIC &

23rd Mar 2009

Page 41: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2008-09

Name of the ITI: ITI (WB-W), Chaukaghat

S. No. Particulars Details1 ITI (Name/Address) ITI, (WB-W), Chaukaghat, Varanasi.

Ph No. 0542-2208459, 2206371E-mail [email protected] Of Establishment 1993

2 Name Of Principal Mr. S B SinghPh No. 9450182869

3 Industry Partner (Address) M/s. Spykar Lifestyles Pvt. Ltd (UP).Ph No. 5446-2512077/79 (Extn-473)

4 IMC Chairman Sh. Sunit Kumar MishraDesignation Vice President

Contact DetailsPh No.Fax No.E-Mail

[email protected]

5 Infrastructure AvailableLand Area (sq m) 1500 (OWN)

Constructed Area (sq m) Office:85Workshop:395Hostel: NIL

6 Existing Trades COPA (03), Electronics Mech. (01), Hair & Skin Care(01), Others-Guest Lecturer

7 Intake Capacity/ Present Strength 808 Intake Target after

implementation of PPP Scheme208

Upgradation of existing Trades COPA, Electronics Mech., Welder Gas& Electric ,Electronics Mech.

Opening of New trades Mech. Communication Equipment Maintenance,Computer Embroidery & Needle Work.

Opening of CoE Information Technology.9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 74.51 Lakhs & 37.26 %12 Revenue (Dec 2011) 0.0013 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh (Release)/2008-NIC &

23rd Mar 2009

Page 42: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2008-09

Name of the ITI: ITI (W), Raibareli

S. No. Particulars Details1 ITI (Name/Address) ITI, (W), Raibareli, Gora Bazar.

Ph No. NILE-mail [email protected] Of Establishment 1984

2 Name Of Principal Mrs. Nupur KashyapPh No. 9936448003

3 Industry Partner (Address) M/s. Saral Industries, Raibareli.Ph No. 9415245319

4 IMC Chairman Mr. Pradeep AzadDesignation Managing Director

Contact DetailsPh No.Fax No.E-Mail

[email protected]

5 Infrastructure AvailableLand Area (sq m) 50305 (OWN)

Constructed Area (sq m) Office:84.63Workshop:706.14Hostel: NIL

6 Existing Trades Cutting Tailoring (02), Hindi Steno (02)7 Intake Capacity/ Present Strength 648 Intake Target after

implementation of PPP Scheme192

Upgradation of existing Trades Stenography Hindi.Opening of New trades Hair & Skin Care, Electronics(Mech.).Opening of CoE Apparel Sector.

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 46.89 Lakhs & 23.45 %12 Revenue (Dec 2011) 0.0013 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh (Release)/2008-NIC &

23rd Mar 2009

Page 43: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2008-09

Name of the ITI: ITI(W), Saket, Meerut

S. No. Particulars Details1 ITI (Name/Address) ITI, (WB-W), Saket, Meerut.

Ph No. 0121-2670465E-mail [email protected] Of Establishment 1995

2 Name Of Principal Mr. Yogesh KumarPh No. 94106079540

3 Industry Partner (Address) M/s. Jain Engineering Works, Meerut.Ph No. 0121-2670465

4 IMC Chairman Mr. Mahesh Chand JainDesignation MD

Contact DetailsPh No.Fax No.E-Mail

9837175976NILNIL

5 Infrastructure AvailableLand Area (sq m) 3044.40 (OWN)

Constructed Area (sq m) Office:57.24Workshop:704.80 Ground+1st FlourHostel: NIL

6 Existing Trades COPA (03), RTV (02), cutting Tailoring (02), StenoHindi (01), DM Civil (01)

7 Intake Capacity/ Present Strength 1448 Intake Target after

implementation of PPP Scheme240

Upgradation of existing Trades NILOpening of New trades NILOpening of CoE Information Technology.

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 161.37 Lakhs & 80.69 %12 Revenue (Dec 2011) 17.11 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh (Release)/2008-NIC &

23rd Mar 2009

Page 44: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2008-09

Name of the ITI: ITI, Bachcha Park

S. No. Particulars Details1 ITI (Name/Address) ITI, Bachcha Park, Meerut.

Ph No. 0121-2670465,E-mail [email protected] Of Establishment 1967

2 Name Of Principal Mr. Y P SinghPh No. 9286603223

3 Industry Partner (Address) M/s. Jain Engineering Works, Meerut.Ph No. 0121-2670465, 9415566845

4 IMC Chairman Mr. Mahesh Chand JainDesignation MD

Contact DetailsPh No.Fax No.E-Mail

9837175976NILNIL

5 Infrastructure AvailableLand Area (sq m) 5937.38+6400.65 (OWN)

Constructed Area (sq m) Office:138.39Workshop:1108.91Hostel:690.30

6 Existing Trades Fitter (03), Electrician (02), DM(Civil) (01), Turner(02), Steno Hindi (01), Mech. Motor Vehicle (02),Wireman (01)

7 Intake Capacity/ Present Strength 1848 Intake Target after

implementation of PPP Scheme280

Upgradation of existing Trades Fitter, Electrician, Turner.Opening of New trades NILOpening of CoE Information Technology/RAC.

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 132.16 Lakhs & 66.08 %12 Revenue (Dec 2011) 1.02 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh (Release)/2008-NIC &

23rd Mar 2009

Page 45: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2008-09

Name of the ITI: ITI, Railway Colony, Gorakhpur

S. No. Particulars Details1 ITI (Name/Address) ITI, Railway Colony, Gorakhpur.

Ph No. 0551-2501214,E-mail [email protected] Of Establishment 1960-61

2 Name Of Principal Sh. Arvind KumarPh No. 9838552851

3 Industry Partner (Address) M/s. Care Medical Device Limited, Gorakhpur.Ph No. NIL

4 IMC Chairman Dr. Mohd. HumaytunDesignation MD

Contact DetailsPh No.Fax No.E-Mail

0551-2201022 /[email protected]

5 Infrastructure AvailableLand Area (sq m) NIL (OWN)

Constructed Area (sq m) Office:3420Workshop:150*60Hostel:160*50

6 Existing Trades Electrician (02), Mech. Motor (02), Mech. Diesel (01),Mech. Tractor (01), Draftsman Civil (01), DraftsmanMech. (01), Steno Hindi (01)

7 Intake capacity/ Present Strength 144

8 Intake Target afterimplementation of PPP Scheme

NIL

Upgradation of existing Trades NILOpening of New trades NILOpening of CoE NIL

9 Seed Money 75.0010 Proposed Expenditure 175.0011 Expenditure & %age (Dec 2011) 19.60 Lakhs & 11.20 %12 Revenue (Dec 2011) 0.0013 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh (Release)/2008-NIC &

23rd Mar 2009

Page 46: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2009-10

Name of the ITI : ITI, Gauriganj

S. No. Particulars Details1 ITI (Name/Address) ITI, Gauriganj, Sultanpur (U.P)

Ph No. 05362-221277E-mail [email protected] Of Establishment 1987

2 Name Of Principal Sh. D.K SinghPh No. 9451096100

3 Industry Partner (Address) M/s. IVS Food Pvt. Ltd., Sec-21, Industrial AreaJagdishpur sultanpur, Uttar Pradesh

Ph No. NIL4 IMC Chairman Sh. Shahnawaz

Designation Managing DirectorContact DetailsPh No.Fax No.E-Mail

9839337698NILNIL

5 Infrastructure AvailableLand Area (sq m) 750 (Rented)

Constructed Area (sq m) Office: 100Workshop : 390Hostel : NIL

6 Existing Trades Electronic Mech. (02), R&A/C (02), D/M Civil (02)7 Intake Capacity/ Present Strength 968 Intake Target after

implementation of PPP Scheme192

Upgradation of existing Trades Electronic Mech. (02), D/M Civil (02)Opening of New trades NILOpening of CoE Refrigeration & Air Conditioning

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 60.00 Lakhs & 30.00 %12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2009-NIC & 8th

October, 2009

Page 47: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2009-10

Name of the ITI : ITI, Chandauli

S. No. Particulars Details1 ITI (Name/Address) ITI, Chandauli

Ph No. 0542-2575239E-mail [email protected] Of Establishment 2006

2 Name Of Principal Mr. Panchu RamPh No. 9415814309

3 Industry Partner (Address) M/s. Metal Craft Engineering, Maqbool Alam Road,Varanasi.

Ph No. 94152278764 IMC Chairman Sh. V.K Jaiswal

Designation ChairmanContact DetailsPh No.Fax No.E-Mail

[email protected]

5 Infrastructure AvailableLand Area (sq m) 0.996 Hec (OWN)

Constructed Area (sq m) Office: 196.15Workshop : 1939.773Hostel : NIL

6 Existing Trades Fashion Technology (01)7 Intake Capacity/ Present Strength 168 Intake Target after

implementation of PPP Scheme112

Upgradation of existing Trades Consumer Electronics, Welder Gas & Electric, DressMaking , Fashion Technology

Opening of New trades NILOpening of CoE Fabrication Fitting & Welding

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 1.33 Lakhs & 0.67 %12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2009-NIC & 8th

October, 2009

Page 48: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2009-10

Name of the ITI : ITI, Maharajganj

S. No. Particulars Details1 ITI (Name/Address) Govt. Industrial Training Institute Maharajganj Distt.

Maharajganj Uttar PradeshPh No. 09411959175E-mail [email protected] Of Establishment 2007

2 Name Of Principal Mr. Vipin KumarPh No. 09411959175

3 Industry Partner (Address) M/s. Purvanchal Industries, Interlocking andfabrication Sector, By pass Deoria, Tara Mandal Road,Gorakhpur.

Ph No. 094119591754 IMC Chairman Sh. P.K Upadhyay

Designation NILContact DetailsPh No.Fax No.E-Mail

9415824260NILNIL

5 Infrastructure AvailableLand Area (sq m) 12000 (OWN)

Constructed Area (sq m) Office: 2055Workshop : 1000Hostel : NIL

6 Existing Trades Consumer Electronic (02), Fashion Technology (01),Dress Making (01), Welder (01)

7 Intake Capacity/ Present Strength 808 Intake Target after

implementation of PPP Scheme176

Upgradation of existing Trades Consumer Electronic , Fashion Technology , DressMaking

Opening of New trades NILOpening of CoE Fabrication Sector

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 149.40 Lakh & 74.82 %12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2009-NIC & 8th

October, 2009

Page 49: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2009-10

Name of the ITI : ITI, Patti

S. No. Particulars Details1 ITI (Name/Address) Govt. ITI, Patti (Muzahi Bazar), Pratapgarh.

Ph No. 09453296521E-mail [email protected] Of Establishment 1987

2 Name Of Principal Sh. Vijay Kant VermaPh No. 09453296521

3 Industry Partner (Address) M/s. Maya Industries Ltd., PratapgarhPh No. 05343-220429

4 IMC Chairman Sh. Pavan Kumar AgarwalDesignation Director

Contact DetailsPh No.Fax No.E-Mail

0989579874, 05342223829

[email protected] Infrastructure Available

Land Area (sq m) 32000 (OWN)Constructed Area (sq m) Office: 90

Workshop : 15300Hostel : NIL

6 Existing Trades Electrician (02), Electronics (02)7 Intake Capacity/ Present Strength 648 Intake Target after

implementation of PPP Scheme160

Upgradation of existing Trades NILOpening of New trades NILOpening of CoE Electrical

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 119.73 Lakhs & 59.87 %12 Revenue (Dec 2011) 0.82 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2009-NIC & 8th

October, 2009

Page 50: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2009-10

Name of the ITI : ITI, Khajni

S. No. Particulars Details1 ITI (Name/Address) ITI, Khajni, Gorakhpur

Ph No. 09475204960E-mail [email protected] Of Establishment 86-87

2 Name Of Principal Sh. Rajnath SinghPh No. 09475204960

3 Industry Partner (Address) M/s. Dr. Humayun (MD) Care Medical Devices Ltd., C-102/704, Mohaddipur, Gorakhpur

Ph No. NIL4 IMC Chairman Dr. Humayun

Designation Member of FICCIContact DetailsPh No.Fax No.E-Mail

0551-2201022/[email protected]

5 Infrastructure AvailableLand Area (sq m) 20234 (OWN)

Constructed Area (sq m) Office: 1500Workshop :Hostel :

6 Existing Trades Radio and TV Mechanic (01), Cutting and Sewing (01)7 Intake Capacity/ Present Strength 328 Intake Target after

implementation of PPP Scheme128

Upgradation of existing Trades NILOpening of New trades NILOpening of CoE Electrical

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 26.63 Lakhs & 13.32 %12 Revenue (Dec 2011) 2.76 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2009-NIC & 8th

October, 2009

Page 51: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2009-10

Name of the ITI : ITI, Sarsawa

S. No. Particulars Details1 ITI (Name/Address) ITI, Sarsawa, Saharanpur

Ph No. 0132-2765528E-mail NILYear Of Establishment 1987

2 Name Of Principal Mr. R D SharmaPh No. 9712706264

3 Industry Partner (Address) M/s. Satyam Cotspin Ltd., Behat Road, SaharanpurPh No. 9760037487

4 IMC Chairman Mr. Sandeep GuptaDesignation Director

Contact DetailsPh No.Fax No.E-Mail

[email protected]

5 Infrastructure AvailableLand Area (sq m) 13097 (OWN)

Constructed Area (sq m) Office: 88.50Workshop : 601.48Hostel :NIL

6 Existing Trades Refrigeration and AC (02), Draftsman Civil (02)7 Intake Capacity/ Present Strength 648 Intake Target after

implementation of PPP Scheme160

Upgradation of existing Trades Electronics Mech. (02), Draughtsman Civil (02),Welder (01)

Opening of New trades NILOpening of CoE Refrigeration and Air Condition

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 21.42 Lakhs & 10.71 %12 Revenue (Dec 2011) 2.46 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2009-NIC & 8th

October, 2009

Page 52: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2009-10

Name of the ITI : ITI, Campierganj

S. No. Particulars Details1 ITI (Name/Address) ITI, Campierganj, Dist. Gorakhpur-UP

Ph No. 9838552851E-mail [email protected] Of Establishment 1987

2 Name Of Principal Mr. Arvind KumarPh No. 9838552851

3 Industry Partner (Address) M/s. Dr. Humayun (MD) Care Medical Device Ltd., C-102/704, Mohaddipur, Gorakhpur-273008

Ph No. 0551-2201022/32951064 IMC Chairman Dr. Humayun

Designation Member of FICCIContact DetailsPh No.Fax No.E-Mail

0551-2201022/[email protected]

5 Infrastructure AvailableLand Area (sq m) Not Available (OWN)

Constructed Area (sq m) Total Constructed:- 1500Office:Workshop :Hostel :

6 Existing Trades Mech. Radio & TV7 Intake Capacity/ Present Strength 168 Intake Target after

implementation of PPP Scheme112

Upgradation of existing Trades RAC (02), Radio and TV (02)Opening of New trades NILOpening of CoE Electrical

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 4.20 Lakhs & 2.10 %12 Revenue (Dec 2011) 0.0013 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2009-NIC & 8th

October, 2009

Page 53: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2009-10

Name of the ITI : ITI, Jagdishpur

S. No. Particulars Details1 ITI (Name/Address) ITI, Jagdishpur, Sultanapur UP

Ph No. 05362-221277E-mail NILYear Of Establishment 1984

2 Name Of Principal Mr. S K SinghPh No. 9451096100

3 Industry Partner (Address) M/s. IVS Food Pvt. Ltd, Sec-21 Industrial Area,Jagdispur Sultanapur (UP)

Ph No. NIL4 IMC Chairman Sh. Shahnawaz

Designation Managing DirectorContact DetailsPh No.Fax No.E-Mail

9839337698NILNIL

5 Infrastructure AvailableLand Area (sq m) 500 (Rented)

Constructed Area (sq m) Office: 50Workshop : 277Hostel : NIL

6 Existing Trades Fitter (02), Electrician (02)7 Intake Capacity/ Present Strength 648 Intake Target after

implementation of PPP Scheme160

Upgradation of existing Trades Fitter (02), Electrician (02)Opening of New trades NILOpening of CoE Electrical

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 62.50 Lakhs & 31.25 %12 Revenue (Dec 2011) 0.37 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2009-NIC & 8th

October, 2009

Page 54: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2009-10

Name of the ITI : ITI, Sirathu

S. No. Particulars Details1 ITI (Name/Address) ITI, Sirathu, Kaushambhi

Ph No. 9628374353E-mail [email protected] Of Establishment 1998

2 Name Of Principal Mr. Sant LalPh No. 9628374353

3 Industry Partner (Address) M/s. Indian Industries Association Gomati nagarLucknow

Ph No. 0522-27200904 IMC Chairman Mr. Arvind Agarwal

Designation SecretaryContact DetailsPh No.Fax No.E-Mail

9415215291NILNIL

5 Infrastructure AvailableLand Area (sq m) 32574 (OWN)

Constructed Area (sq m) Office: 90Workshop : 15323Hostel : NIL

6 Existing Trades COPA (02), Welder (01), Tractor Mechanic (01), RAC(01), RTV (01), Hair & Skin Care (01), Cutting &Sewing (01)

7 Intake Capacity/ Present Strength 1288 Intake Target after

implementation of PPP Scheme224

Upgradation of existing Trades COPA (02), Welder (01), Tractor Mechanic (01), RAC(01), RTV (01), Hair & Skin Care (01), Cutting &Sewing (01)

Opening of New trades NILOpening of CoE Electrical

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 32.03 Lakhs & 16.02 %12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2009-NIC & 8th

October, 2009

Page 55: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2009-10

Name of the ITI : ITI, Javer

S. No. Particulars Details1 ITI (Name/Address) ITI, Javer, GB Nagar

Ph No. 0210-2453131E-mail [email protected] Of Establishment 2006

2 Name Of Principal Sr. C P SinghPh No. 9810809671

3 Industry Partner (Address) M/s. Moserbaer Ltd., GN 66, Udyog Vihar, GreaterNoida, Gautam Budh Nagar

Ph No. 9811502322, 02120-43862634 IMC Chairman Mr. A K Sharma

Designation DGM (HR)Contact DetailsPh No.Fax No.E-Mail

9811502322, [email protected],[email protected]

5 Infrastructure AvailableLand Area (sq m) 600 (OWN)

Constructed Area (sq m) Total Constructed: 146Office:Workshop :Hostel :

6 Existing Trades Electrician (01), Welder (01)7 Intake Capacity/ Present Strength 328 Intake Target after

implementation of PPP Scheme128

Upgradation of existing Trades Electrician (01), Welder (01), Consumer Electronics(01), Fashion Technology (01), Dress Making (01)

Opening of New trades NILOpening of CoE Electrical

9 Seed Money 40.0010 Proposed Expenditure 210.0011 Expenditure & %age (Dec 2011) 59.00 lakhs & 28.09 %12 Revenue (Dec 2011) 4.76 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2009-NIC & 8th

October, 2009

Page 56: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2009-10

Name of the ITI : ITI, Amethi

S. No. Particulars Details1 ITI (Name/Address) ITI, Amethi Sultanpur UP

Ph No. 05362-221277E-mail NILYear Of Establishment 1982

2 Name Of Principal Sh. D K SinghPh No. 9451096100

3 Industry Partner (Address) M/s. IVS Food Pvt. Ltd., Sec-21, Industrial AreaJagdishpur Sultanpur, UP

Ph No. NIL4 IMC Chairman Sh. Shahnawaz

Designation Managing DirectorContact DetailsPh No.Fax No.E-Mail

9839337698NILNIL

5 Infrastructure AvailableLand Area (sq m) 20234 (OWN)

Constructed Area (sq m) Office: 150Workshop : 1000Hostel : NIL

6 Existing Trades Fitter (02), Mechanic Radio & TV (02), ElectronicsMechanic (02), Electrician (02), MMV (02)

7 Intake Capacity/ Present Strength 1608 Intake Target after

implementation of PPP Scheme256

Upgradation of existing Trades Electronics Mechanic (02), MMV (02)Opening of New trades NILOpening of CoE Electrical

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 0.60 Lakhs & 0.30 %12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2009-NIC & 8th

October, 2009

Page 57: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2009-10

Name of the ITI : ITI, Kadipur

S. No. Particulars Details1 ITI (Name/Address) ITI, Kadipur, Sultanapur UP

Ph No. 05362-221277E-mail [email protected] Of Establishment 1995

2 Name Of Principal Mr. D K SinghPh No. 9451096100

3 Industry Partner (Address) M/s. IVS Food Pvt. Ltd., Sec-21, Industrial AreaJagdishpur Sultanpur, UP

Ph No. NIL4 IMC Chairman Sh. Shahnawaz

Designation Managing DirectorContact DetailsPh No.Fax No.E-Mail

9839337698NILNIL

5 Infrastructure AvailableLand Area (sq m) 8.3 Acre (OWN)

Constructed Area (sq m) Office: 250Workshop : 565Hostel : NIL

6 Existing Trades Wiremen (01), Welder (01), Carpenter (01)7 Intake Capacity/ Present Strength 488 Intake Target after

implementation of PPP Scheme144

Upgradation of existing Trades Welder (01), Carpenter (01)Opening of New trades NILOpening of CoE Electrical

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 61.50 Lakhs & 30.75 %12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2009-NIC & 8th

October, 2009

Page 58: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2009-10

Name of the ITI : ITI, Mankapur Gonda

S. No. Particulars Details1 ITI (Name/Address) ITI, Mankapur Gonda, UP

Ph No. 9415463200E-mail [email protected] Of Establishment 1988

2 Name Of Principal Sh. Vimal Kumar ViswakarmaPh No. 9415463200

3 Industry Partner (Address) M/s. Bajaj Hindustan Sugar & Industry Ltd.,Kundarkhi, Govindpara Gonda

Ph No. 05262-232343, 94154632004 IMC Chairman Mr. Narendra Kumar Shukla

Designation Factory ManagerContact DetailsPh No.Fax No.E-Mail

[email protected]

5 Infrastructure AvailableLand Area (sq m) 7.41 Acres (OWN)

Constructed Area (sq m) Office: 578.71Workshop :Hostel : NIL

6 Existing Trades Electrician (01), Wiremen (01)7 Intake Capacity/ Present Strength 328 Intake Target after

implementation of PPP Scheme128

Upgradation of existing Trades Electrician (02), Wiremen (02), RAC (02)Opening of New trades NILOpening of CoE Electrical

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 4.54 Lakh & 2.27 %12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2009-NIC & 8th

October, 2009

Page 59: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2009-10

Name of the ITI : ITI, Gorakhpur (W)

S. No. Particulars Details1 ITI (Name/Address) ITI, Gorakhpur (W), Raiway Road Gorakhpur

Ph No. 0551-2501214, 9838552851E-mail [email protected] Of Establishment 1996

2 Name Of Principal Sh. Arvind KumarPh No. 0551-2501214, 9838552851

3 Industry Partner (Address) M/s. Care Medical Devices Ltd., C-102704,Mohaddipur, Gorakhpur-273008

Ph No. 0551-2201022, 32951064 IMC Chairman Dr.Humayun

Designation Member of FICCIContact DetailsPh No.Fax No.E-Mail

0551-2201022, [email protected]

5 Infrastructure AvailableLand Area (sq m) 468 (OWN)

Constructed Area (sq m) Office: 101.50Workshop : 3306Hostel : NIL

6 Existing Trades DMC (01), Cutting & Sewing (01), Embroidery (01)7 Intake Capacity/ Present Strength 488 Intake Target after

implementation of PPP Scheme144

Upgradation of existing Trades DMC (01), Mech. R & TV (01)Opening of New trades NILOpening of CoE Information Technology

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 13.58 Lakhs & 6.79 %12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2009-NIC & 8th

October, 2009

Page 60: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2009-10

Name of the ITI : ITI, Barabanki

S. No. Particulars Details1 ITI (Name/Address) ITI, Barabanki, Mahuamau, Jehangirabad raod,

BarabankiPh No. 05248-230311, 9415081038E-mail NILYear Of Establishment 1985

2 Name Of Principal Sh. Mateen-Uz-ZaferPh No. 05248-230311, 9415081038

3 Industry Partner (Address) M/s. Aditya Pharmaceutical Group Inc., Unit no. 332,Vardhman Key Point plaza, Plot No-7, Sec-6, Dwarka,New Delhi-110075

Ph No. 94541611914 IMC Chairman Dr. Jaideep Dasgupta

Designation Managing PartnerContact DetailsPh No.Fax No.E-Mail

9810509249, 011-45566054011-45532544NIL

5 Infrastructure AvailableLand Area (sq m) 3.5 Hectare (OWN)

Constructed Area (sq m) Office: 101.50Workshop : 1298.18 (FF), 427.46 (SF)Hostel : NIL

6 Existing Trades Radio and TV Mech. (02), Electronics Mech. (02),Cutting and Sewing (01), Embroidery (01)

7 Intake Capacity/ Present Strength 968 Intake Target after

implementation of PPP Scheme192

Upgradation of existing Trades Welder Gas and Electric (01), Ref. and AC (01), MMV(01)

Opening of New trades NILOpening of CoE Fabrication (Fitting and Welding)

9 Seed Money 60.0010 Proposed Expenditure 190.0011 Expenditure & %age (Dec 2011) 79.26 Lakhs & 41.71 %12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2009-NIC & 8th

October, 2009

Page 61: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2009-10

Name of the ITI : ITI, Charkari

S. No. Particulars Details1 ITI (Name/Address) ITI, Charkari, Mahoba

Ph No. 05281-254765E-mail [email protected] Of Establishment 1977

2 Name Of Principal Sh. Ram PrakashPh No. 05281-254765

3 Industry Partner (Address) M/s. Ram Shree Foods Pvt. Ltd. , OraiPh No. 9628374360

4 IMC Chairman Mr. Pradeep Kumar NigotiaDesignation Proprietor

Contact DetailsPh No.Fax No.E-Mail

9415032141NILNIL

5 Infrastructure AvailableLand Area (sq m) 25000 (OWN)

Constructed Area (sq m) Office: 543Workshop : 452Hostel : NIL

6 Existing Trades Tractor Mech. (02)7 Intake Capacity/ Present Strength 328 Intake Target after

implementation of PPP Scheme128

Upgradation of existing Trades Fitter (02), Wiremen (02), Electrician (01), MMV (01),Welder (01), Cutting & Sewing (01), Mech. Tractor(01), Draftsman Civil (01)

Opening of New trades NILOpening of CoE Electrical

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 8.82 Lakhs & 4.41 %12 Revenue (Dec 2011) 0.08 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2009-NIC & 8th

October, 2009

Page 62: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2009-10

Name of the ITI : ITI, Jhansi (W)

S. No. Particulars Details1 ITI (Name/Address) ITI, Jhansi (W), World Bank, Gwalior Road, Sidheswar

Nagar, JhansiPh No. 0510-2363416E-mail [email protected], [email protected] Of Establishment 1995

2 Name Of Principal Sh. Sanjay SagarPh No. 0510-2363416

3 Industry Partner (Address) M/s. Vikas Udhyog, Industrial Estate, Gwl. Rd., JhansiPh No. 0510-2363416

4 IMC Chairman Sh. R K OmarDesignation Partner

Contact DetailsPh No.Fax No.E-Mail

9839028229, 0510-2443264, [email protected]

5 Infrastructure AvailableLand Area (sq m) 80937 (OWN)

Constructed Area (sq m) Office: 555Workshop : 311.10Hostel : NIL

6 Existing Trades Electronics (01), Radio & TV (01), Secretarial Practice(01), Cutting & Sewing (01), Embroidery (01)

7 Intake Capacity/ Present Strength 808 Intake Target after

implementation of PPP Scheme192

Upgradation of existing Trades Electronics (01), Radio & TV (01), Secretarial Practice(01), Cutting & Sewing (01), Embroidery (01)

Opening of New trades COPA (01)Opening of CoE Electronics

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 43.09 Lakhs & 21.55 %12 Revenue (Dec 2011) 0.21 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2009-NIC & 8th

October, 2009

Page 63: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2009-10

Name of the ITI : ITI, Rasra

S. No. Particulars Details1 ITI (Name/Address) ITI, Rasra (Ballia)U.P

Ph No. 9307494609E-mail [email protected] Of Establishment 1984

2 Name Of Principal Sh. R P YadavPh No. 9307494609

3 Industry Partner (Address) M/s. Indian Industry AssociationPh No. 9415022544

4 IMC Chairman Sh. Arun Kumar SinghDesignation Partner

Contact DetailsPh No.Fax No.E-Mail

941524983905498220185-

5 Infrastructure AvailableLand Area (sq m) 7.89 Acre (OWN)

Constructed Area (sq m) Office: 250Workshop : 310Hostel : NIL

6 Existing Trades Wiremen (01), Mech. Radio & TV(01), ElectronicsMech. (01)

7 Intake Capacity/ Present Strength 488 Intake Target after

implementation of PPP Scheme144

Upgradation of existing Trades Wiremen (01), Mech. Radio & TV(01)Opening of New trades NILOpening of CoE Electronics

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 43.21 Lakhs & 21.61 %12 Revenue (Dec 2011) 0.48 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2009-NIC & 8th

October, 2009

Page 64: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2009-10

Name of the ITI : ITI, Salon

S. No. Particulars Details1 ITI (Name/Address) ITI, Salon, Raebareli

Ph No. 0535-2700748E-mail [email protected] Of Establishment 1987

2 Name Of Principal Sh. Mayank GangwarPh No. 9935459155

3 Industry Partner (Address) M/s. IIAPh No. 9415034169

4 IMC Chairman Sh. Pradeep AzadDesignation NIL

Contact DetailsPh No.Fax No.E-Mail

0535-2217110, 9415034501

[email protected] Infrastructure Available

Land Area (sq m) 1250 (Rented)Constructed Area (sq m) Office: 32

Workshop : 357.7Hostel : NIL

6 Existing Trades Electronic Mech. (01)7 Intake Capacity/ Present Strength 168 Intake Target after

implementation of PPP Scheme112

Upgradation of existing Trades R/AC (02), Welder (01), Draughtsman Civil (02),Electronic Mech. (01)

Opening of New trades NILOpening of CoE Electronics

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 78.90 Lakhs & 39.45 %12 Revenue (Dec 2011) 2.84 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2009-NIC & 28th

October, 2009

Page 65: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2009-10

Name of the ITI : ITI, Seorahi

S. No. Particulars Details1 ITI (Name/Address) ITI, Seorahi, Khushi Nagra

Ph No. 9415364148E-mail [email protected] Of Establishment 1989

2 Name Of Principal Sh. Anil VermaPh No. 9415364148

3 Industry Partner (Address) M/s. J P Tyre Retrading Company, National HighwayKasia, Distt. Khushinagar

Ph No. 94543339804 IMC Chairman Sh. Jyoti Prakash

Designation NILContact DetailsPh No.Fax No.E-Mail

9454333980NILNIL

5 Infrastructure AvailableLand Area (sq m) NIL (Rented)

Constructed Area (sq m) Office: 1298.75Workshop : 1683Hostel : NIL

6 Existing Trades Wiremen (01)7 Intake Capacity/ Present Strength 168 Intake Target after

implementation of PPP Scheme112

Upgradation of existing Trades Wiremen (01), Radio & TV (01), Welder (01), TractorMech. (01)

Opening of New trades NILOpening of CoE Automobile

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 43.08 Lakhs & 21.54 %12 Revenue (Dec 2011) 0.02 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2009-NIC & 28th

October, 2009

Page 66: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2009-10

Name of the ITI : ITI, Naurangia

S. No. Particulars Details1 ITI (Name/Address) ITI, Naurangia, Khushi Nagra

Ph No. 9415364148E-mail [email protected] Of Establishment 2006

2 Name Of Principal Sh. Anil VermaPh No. 9415364148

3 Industry Partner (Address) M/s. J P Tyre Retrading Company, National HighwayKasia, Distt. Khushinagar

Ph No. 94543339804 IMC Chairman Sh. Jyoti Prakash

Designation NILContact DetailsPh No.Fax No.E-Mail

9454333980NILNIL

5 Infrastructure AvailableLand Area (sq m) 8112 (OWN)

Constructed Area (sq m) Office: 615Workshop : 2368Hostel : NIL

6 Existing Trades Welder (01)7 Intake Capacity/ Present Strength 168 Intake Target after

implementation of PPP Scheme112

Upgradation of existing Trades Welder (01), Fashion Technology (01), Dress Making(01), Cons. Electronics (01), Plumber (01), Painter(01), Information Technology (01), Electrician (01),R/AC (01)

Opening of New trades NILOpening of CoE Automobile

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 100.19 Lakhs & 50.10 %12 Revenue (Dec 2011) 0.05 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2009-NIC & 28th

October, 2009

Page 67: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2009-10

Name of the ITI : ITI, Modhonagar

S. No. Particulars Details1 ITI (Name/Address) ITI, Modhonagar, Dist. Maharajganj Pin-273158 (UP)

Ph No. 9411959175E-mail [email protected] Of Establishment 1987

2 Name Of Principal Sh. Vipin KumarPh No. 9411959175

3 Industry Partner (Address) M/s.Purvanchal Industries and Fabrication Sector, Bypass Deoria: Tara Mandal Road, Gorakhpur

Ph No. 94119591754 IMC Chairman Sh. P K Upadhyay

Designation NILContact DetailsPh No.Fax No.E-Mail

9415824260NILNIL

5 Infrastructure AvailableLand Area (sq m) 7000 (OWN)

Constructed Area (sq m) Office: 120Workshop : 43Hostel : NIL

6 Existing Trades Electronics (01), R/AC (01), Draughtsman (01),Welder (01)

7 Intake Capacity/ Present Strength 648 Intake Target after

implementation of PPP Scheme160

Upgradation of existing Trades Electronics (02), Draughtsman (02), Welder (02)Opening of New trades NILOpening of CoE RAC

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 170.89 Lakhs & 85.45 %12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2009-NIC & 28th

October, 2009

Page 68: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2009-10

Name of the ITI : ITI, Mohamdabad Gohana

S. No. Particulars Details1 ITI (Name/Address) ITI, Mohamdabad Gohana

Ph No. 9628374390E-mail [email protected] Of Establishment 2006

2 Name Of Principal Sh. Jai PrakashPh No. 9839293964

3 Industry Partner (Address) M/s. Ganga Floor & Oil Mills, D-79, Industrial Area,Tajopur Mau.

Ph No. 0547-28604444 IMC Chairman Mr. Kanhaiya Lal Jaiswal

Designation PartnerContact DetailsPh No.Fax No.E-Mail

0547-2860444, [email protected]

5 Infrastructure AvailableLand Area (sq m) 8096.66 (OWN)

Constructed Area (sq m) Office: 130.11Workshop : 951.70Hostel : NIL

6 Existing Trades Dress Making (01)7 Intake Capacity/ Present Strength 168 Intake Target after

implementation of PPP Scheme112

Upgradation of existing Trades Dress Making (01), Fashion technology (01)Opening of New trades NILOpening of CoE Fabrication, Fitting & Welding

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 19.00 Lakhs & 8.64 %12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2009-NIC & 28th

October, 2009

Page 69: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2009-10

Name of the ITI : ITI, Lalitpur

S. No. Particulars Details1 ITI (Name/Address) ITI, Lalitpur, UP

Ph No. 9450060255E-mail [email protected] Of Establishment 1986

2 Name Of Principal Sh. M K SinghPh No. 9450060255

3 Industry Partner (Address) M/s. Rajesh Steel Factory, Industrial Area, LalitpurPh No. 9450060255

4 IMC Chairman Smt. Kamlesh JainDesignation Chairman

Contact DetailsPh No.Fax No.E-Mail

[email protected]

5 Infrastructure AvailableLand Area (sq m) 126000 (OWN)

Constructed Area (sq m) Office: 6000Workshop : NILHostel : NIL

6 Existing Trades R/TV (02)7 Intake Capacity/ Present Strength 328 Intake Target after

implementation of PPP Scheme128

Upgradation of existing Trades Electrical (02), Fitter & Alide (02), Motor Mech. (02),RAC (02)

Opening of New trades NILOpening of CoE Electrical

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 80.86 Lakhs & 40.43 %12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2009-NIC & 28th

October, 2009

Page 70: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2009-10

Name of the ITI : ITI, Lalganj Azamgarh

S. No. Particulars Details1 ITI (Name/Address) ITI, Lalganj Azamgarh

Ph No. 9307494609E-mail [email protected] Of Establishment 1998

2 Name Of Principal Mr. R P YadavPh No. 9307494609

3 Industry Partner (Address) M/s. ASSOCHAMPh No. 0522-2301957, 9415513683

4 IMC Chairman Sh. Shiv KumarDesignation Partner

Contact DetailsPh No.Fax No.E-Mail

05462-291351, 220716, 541520776705462-291351NIL

5 Infrastructure AvailableLand Area (sq m) 25575 (OWN)

Constructed Area (sq m) Office: 75Workshop : 13455Hostel : NIL

6 Existing Trades Welder (01), Hair & Skin Care (01)7 Intake Capacity/ Present Strength 328 Intake Target after

implementation of PPP Scheme128

Upgradation of existing Trades RAC (01), Mech. Tractor (01), Steno Hindi (01), Hair &Skin Care (01), Cutting & Sewing (01)

Opening of New trades NILOpening of CoE Fabrication, Fitting & Sewing

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 10.53 Lakhs & 5.27 %12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2009-NIC & 28th

October, 2009

Page 71: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2009-10

Name of the ITI : ITI, Padrauna

S. No. Particulars Details1 ITI (Name/Address) ITI, Padrauna, Khushi Nagra

Ph No. 9415364148E-mail [email protected] Of Establishment 1984

2 Name Of Principal Sh. Anil VermaPh No. 9415364148

3 Industry Partner (Address) M/s. J P Tyre Retrading Company, National HighwayKasia, Distt. Khushinagar

Ph No. 94543339804 IMC Chairman Sh. Jyoti Prakash

Designation NILContact DetailsPh No.Fax No.E-Mail

9454333980NILNIL

5 Infrastructure AvailableLand Area (sq m) NIL (Rented)

Constructed Area (sq m) Office: 128.75Workshop : 1683Hostel : NIL

6 Existing Trades Motor Mech. (02)7 Intake Capacity/ Present Strength 328 Intake Target after

implementation of PPP Scheme144

Upgradation of existing Trades Fitter (02), Electrician (02), Wiremen (02), Electronics(02), Radio & TV (02), Diesel Mech. (01)

Opening of New trades NILOpening of CoE Automobile

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 77.27 Lakhs & 38.56 %12 Revenue (Dec 2011) 1.40 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2009-NIC & 28th

October, 2009

Page 72: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2009-10

Name of the ITI : ITI, Saidpur

S. No. Particulars Details1 ITI (Name/Address) ITI, Saidpur, Ghazipur

Ph No. 9415911967E-mail [email protected] Of Establishment 1998

2 Name Of Principal Mr. SatyakantPh No. 9415911967

3 Industry Partner (Address) M/s. Bryplast Private Ltd. GhazipurPh No. 0548-2220541

4 IMC Chairman Sh. B S YadavDesignation MD

Contact DetailsPh No.Fax No.E-Mail

[email protected]

5 Infrastructure AvailableLand Area (sq m) 3790 (OWN)

Constructed Area (sq m) Office: 50Workshop : 450Hostel : NIL

6 Existing Trades Cutting & Sewing (01), Steno Hindi (01)7 Intake Capacity/ Present Strength 328 Intake Target after

implementation of PPP Scheme128

Upgradation of existing Trades RAC (01), Radio & TV (01), Tractor Mech. (01)Opening of New trades NILOpening of CoE Electrical

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 8.58 Lakhs & 4.29 %12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2009-NIC & 22nd

December, 2009

Page 73: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2009-10

Name of the ITI : ITI, Shahganj Jaunpur

S. No. Particulars Details1 ITI (Name/Address) ITI, Shahganj Jaunpur

Ph No. 9450626506E-mail [email protected] Of Establishment 2007

2 Name Of Principal Mr. Ashok KumarPh No. 9450626506

3 Industry Partner (Address) M/s. Nitesh Engg. Works, Industrial area JagdishpurJaunpur

Ph No. 94156572414 IMC Chairman Sh. Tribhuwan Singh

Designation GMContact DetailsPh No.Fax No.E-Mail

9415657241NILNIL

5 Infrastructure AvailableLand Area (sq m) 2 Acres (OWN)

Constructed Area (sq m) Office: 420Workshop : 558Hostel : NIL

6 Existing Trades Dress making (01), Fashion technology (01)7 Intake Capacity/ Present Strength 328 Intake Target after

implementation of PPP Scheme128

Upgradation of existing Trades RAC (01), Consumer Electronics (01)Opening of New trades NILOpening of CoE Electrical

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 0.54 Lakhs & 0.27 %12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2009-NIC & 16th

December, 2009

Page 74: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2009-10

Name of the ITI : ITI, Musafirkhana

S. No. Particulars Details1 ITI (Name/Address) ITI, Musafirkhana, Sultanapur

Ph No. 05362-221277E-mail [email protected] Of Establishment 2007

2 Name Of Principal Mr. Man Singh BhartiPh No. 9415946352

3 Industry Partner (Address) M/s. IVS Foods Pvt. Ltd., Sec-21 Ind. Area, JagdishpurSultanpur

Ph No. NIL4 IMC Chairman Sr. Shahnawaz

Designation Chairman- MDContact DetailsPh No.Fax No.E-Mail

9839337698NILNIL

5 Infrastructure AvailableLand Area (sq m) 12000 (OWN)

Constructed Area (sq m) Office: 250Workshop : 800Hostel : NIL

6 Existing Trades Welder (01), Machine Consumer Electronics (01),Dress making (01), Fashion Technology (01)

7 Intake Capacity/ Present Strength 648 Intake Target after

implementation of PPP Scheme160

Upgradation of existing Trades Welder (01)Opening of New trades NILOpening of CoE Electronics

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 60.00 Lakhs & 30.00 %12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2009-NIC & 16th

December, 2009

Page 75: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2009-10

Name of the ITI : ITI, Faridpur, Bareilly

S. No. Particulars Details1 ITI (Name/Address) ITI, Faridpur, Bareilly

Ph No. 0581-2560862E-mail [email protected] Of Establishment 2006

2 Name Of Principal Mr. Syed Ali HuzoorPh No. 9917672786, 9628374327

3 Industry Partner (Address) M/s. Coral Motors Pvt. Ltd., Station Raod BariellyPh No. 0581-2560862

4 IMC Chairman Mr. Sartaj AhmadDesignation Chairman

Contact DetailsPh No.Fax No.E-Mail

[email protected]

5 Infrastructure AvailableLand Area (sq m) 2 acres (OWN)

Constructed Area (sq m) Office: 200Workshop : 1700Hostel : NIL

6 Existing Trades Consumer Electronics (01), Welder (01), DressMaking (01), Fashion Technology (01)

7 Intake Capacity/ Present Strength 648 Intake Target after

implementation of PPP Scheme160

Upgradation of existing Trades NILOpening of New trades NILOpening of CoE Automobile

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 27.85 Lakhs & 13.93 %12 Revenue (Dec 2011) 0.34 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2009-NIC & 19th

February, 2010

Page 76: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2009-10

Name of the ITI : ITI, Phoolpur, Azamgarh

S. No. Particulars Details1 ITI (Name/Address) ITI, Phoolpur, Azamgarh

Ph No. 9307494609E-mail [email protected] Of Establishment 1990

2 Name Of Principal Mr. R P YadavPh No. 9307494609

3 Industry Partner (Address) M/s. Indian Industry AssociationPh No. 0522-2720090, 9415026481

4 IMC Chairman Sh. Sanjay SinghDesignation Partner

Contact DetailsPh No.Fax No.E-Mail

0547-2860789, 2860089, 94158417770547-2860489NIL

5 Infrastructure AvailableLand Area (sq m) 3.37 Acres (OWN)

Constructed Area (sq m) Total Constructed: 1.732 AcreOffice: NILWorkshop : NILHostel : NIL

6 Existing Trades Cutting & Sewing (01)7 Intake Capacity/ Present Strength 168 Intake Target after

implementation of PPP Scheme112

Upgradation of existing Trades Welder (Gas & Electric) (01), Cutting & sewing (01)Opening of New trades NILOpening of CoE Electronics

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 46.88 Lakhs & 23.44 %12 Revenue (Dec 2011) 0.31 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2009-NIC & 19th

February, 2010

Page 77: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2009-10

Name of the ITI : ITI, Hathras

S. No. Particulars Details1 ITI (Name/Address) ITI, Hathras, Mahamayanagar

Ph No. 9410427589, 9628374363E-mail [email protected] Of Establishment 1998

2 Name Of Principal Mr. T AfzalPh No. 9410427589, 9628374363

3 Industry Partner (Address) M/s. RCS Roller Flour Mill, GT Road, AligarhPh No. 9410427589, 9628374363

4 IMC Chairman Mr. Pradeep SinghalDesignation Executive Director

Contact DetailsPh No.Fax No.E-Mail

9837043560571- [email protected]

5 Infrastructure AvailableLand Area (sq m) 3 Acre (OWN)

Constructed Area (sq m) Office: NILWorkshop: NILHostel : NIL

6 Existing Trades Stenography Hindi (04)7 Intake Capacity/ Present Strength 648 Intake Target after

implementation of PPP Scheme160

Upgradation of existing Trades RAC (01), Cutting & Sewing (01), Mech. Tractor (01),Welder (Gas & Electric) (01), Data Entry Operator(01), Computer added Embroidery (01), networkTechnician (01), COPA (01)

Opening of New trades NILOpening of CoE Electrical

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) NIL12 Revenue (Dec 2011) 3.54 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2009-NIC & 31st

March, 2010

Page 78: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2010-11

Name of the ITI : ITI, Kasganj

S. No. Particulars Details1 ITI (Name/Address) ITI, Kasganj, Kashiram Nagar

Ph No. NILE-mail NILYear Of Establishment 1987

2 Name Of Principal Mr. M K KulsherthaPh No. 9411600854

3 Industry Partner (Address) M/s. Tayal Agricultural works, Kasganj, Kashiramnagar, uttar pradesh

Ph No. 94116008544 IMC Chairman Mr. Ashok Kumar Tayal

Designation CEOContact DetailsPh No.Fax No.E-Mail

9837302377NILNIL

5 Infrastructure AvailableLand Area (sq m) 1.232 Hectare

Constructed Area (sq m) Office: 300Workshop : 1400Hostel : NIL

6 Existing Trades 167 Intake Capacity/ Present Strength Steno Hindi (01)8 Intake Target after

implementation of PPP Scheme112

Upgradation of existing Trades NILOpening of New trades Electronics (02), Wiremen (03), Cutting & Sewing

(01), Steno Hindi (01)Opening of CoE NIL

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) NIL12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2010-NIC & 19th Oct,

2010

Page 79: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2010-11

Name of the ITI : ITI, Sambhal Moradabad

S. No. Particulars Details1 ITI (Name/Address) ITI, Sambhal Moradabad

Ph No.E-mail [email protected] Of Establishment 2005

2 Name Of Principal Mr. A K SexenaPh No. 9927392562

3 Industry Partner (Address) M/s. Narayan Educational SocietyPh No. 992769939

4 IMC Chairman Mr. Shashi BhushanDesignation Chairman

Contact DetailsPh No.Fax No.E-Mail

[email protected]

5 Infrastructure AvailableLand Area (sq m) 1.117 Hectare

Constructed Area (sq m) Office: 330Workshop : 646.6089Hostel : NIL

6 Existing Trades Fitter (01), COPA (01), Plumber (01), Painter General(01)

7 Intake Capacity/ Present Strength 788 Intake Target after

implementation of PPP Scheme174

Upgradation of existing Trades Fitter (02), COPA (02), Electrician (02)Opening of New trades NILOpening of CoE Electrical

9 Seed Money 100.0010 Proposed Expenditure 150.0011 Expenditure & %age (Dec 2011) 58.31 Lakhs & 38.87 %12 Revenue (Dec 2011) 0.39 Lakhs13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2010-NIC & 1st Nov,

2010

Page 80: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2010-11

Name of the ITI : ITI, Sultanpur (W)

S. No. Particulars Details1 ITI (Name/Address) ITI, Sultanpur (W)

Ph No. 0522-221277E-mail [email protected] Of Establishment 1965

2 Name Of Principal Sh. D K SinghPh No. 9451096100

3 Industry Partner (Address) M/s. Mamta Steel India Ltd., Piparpur AmethiSultanpur

Ph No. 94151364274 IMC Chairman Sh. Lal Padmakar Singh

Designation MDContact DetailsPh No.Fax No.E-Mail

[email protected]

5 Infrastructure AvailableLand Area (sq m) 56000

Constructed Area (sq m) Office: 300Workshop : 2000Hostel : NIL

6 Existing Trades Cutting &Sewing (01), Embroidery (01)7 Intake Capacity/ Present Strength 328 Intake Target after

implementation of PPP Scheme128

Upgradation of existing Trades Cutting &Sewing (01), Embroidery (01)Opening of New trades NILOpening of CoE Apparel

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 73.54 Lakhs & 36.77 %12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2010-NIC & 10th Aug,

2010

Page 81: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2010-11

Name of the ITI : ITI, Ibrahimabad

S. No. Particulars Details1 ITI (Name/Address) ITI, Ibrahimabad (Ballia)

Ph No. 9307494609E-mail [email protected] Of Establishment 1988

2 Name Of Principal Mr. R P YadavPh No. 9307494609

3 Industry Partner (Address) M/s. R S Industries, D-90 Industrial Area, TazopurMau

Ph No. 0547-2860789, 94158417774 IMC Chairman Sh. Sanjay Singh

Designation MDContact DetailsPh No.Fax No.E-Mail

0547-2860789, 94158417770547-2860489NIL

5 Infrastructure AvailableLand Area (sq m) 3.37 Acres

Constructed Area (sq m) Office & Workshop: 1.732 AcresHostel : NIL

6 Existing Trades Steno Hindi (01)7 Intake Capacity/ Present Strength 168 Intake Target after

implementation of PPP Scheme112

Upgradation of existing Trades Steno Hindi (01)Opening of New trades NILOpening of CoE Fabrication Fitting & Welding

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) 7.37 Lakhs & 3.69 %12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2010-NIC (1) & 9th

Sep, 2010

Page 82: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2010-11

Name of the ITI : ITI, Chhanvey

S. No. Particulars Details1 ITI (Name/Address) ITI, Chhanvey mirzapur UP

Ph No. NILE-mail [email protected] Of Establishment 2006

2 Name Of Principal Sh. S N RamPh No.

3 Industry Partner (Address) M/s. Metal Crafts Engineering , VaranasiPh No. 9415227876

4 IMC Chairman Sh. Vinod Kumar JaiswalDesignation CEO

Contact DetailsPh No.Fax No.E-Mail

9415227876NILNIL

5 Infrastructure AvailableLand Area (sq m) .809 Hectare

Constructed Area (sq m) Office: NILWorkshop : NILHostel : NIL

6 Existing Trades Fashion Technology (01), Dress Making (01)7 Intake Capacity/ Present Strength 328 Intake Target after

implementation of PPP Scheme128

Upgradation of existing Trades Fashion Technology (01), Dress Making (01)Opening of New trades NILOpening of CoE Electrical

9 Seed Money 50.0010 Proposed Expenditure 200.0011 Expenditure & %age (Dec 2011) NIL12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2010-NIC & 10th Dec,

2010

Page 83: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2011-12

Name of the ITI : ITI, Gondlamau

S. No. Particulars Details1 ITI (Name/Address) ITI, Gondlamau, Dist. Sitapur

Ph No. NILE-mail [email protected] Of Establishment 1998

2 Name Of Principal Sh. Shiv Ram KrishanPh No. 9453135836

3 Industry Partner (Address) M/s. MB Flour Mills Industries Ltd., SitapurPh No. 9415047071, 9918300571

4 IMC Chairman Sh. Umesh ChandraDesignation CMD

Contact DetailsPh No.Fax No.E-Mail

9415047071, [email protected]

5 Infrastructure AvailableLand Area (sq m) 2000

Constructed Area (sq m) Office: 600Workshop : 900Hostel : NIL

6 Existing Trades COPA (01), RTV (01), Mech. Tractor (01), Steno Hindi(01), Cutting & Sewing (01), Electrician (01), RAC (01),Welder (G&E) (01), Mech. Comm. EquipmentMaintenance (01), N/W technician (01), Data EntryOperator (01), Computer Aided Embroidery (01), CarTruck Driving (01)

7 Intake Capacity/ Present Strength 2088 Intake Target after

implementation of PPP Scheme128

Upgradation of existing Trades COPA (01), RTV (01), Mech. Tractor (01), Steno Hindi(01), Cutting & Sewing (01), Electrician (01), RAC (01),Welder (G&E) (01), Mech. Comm. EquipmentMaintenance (01), N/W technician (01), Data EntryOperator (01), Computer Aided Embroidery (01), CarTruck Driving (01)

Opening of New trades NILOpening of CoE NIL

9 Seed Money10 Proposed Expenditure11 Expenditure & %age (Dec 2011) NIL12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2011-NIC (1) & 17th

Nov, 2011

Page 84: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2011-12

Name of the ITI : ITI, Anandpur Jharki

S. No. Particulars Details1 ITI (Name/Address) ITI, Anandpur Jharki, Tundla, Firozabad

Ph No. NILE-mail [email protected] Of Establishment 1998

2 Name Of Principal Sh. Digambar SinghPh No. 8979257625

3 Industry Partner (Address) M/s. Anupam Infrastructure and Land Development PLtd., Anupam Plaza, Sanjay Place Agra

Ph No. 0562-28527444 IMC Chairman Sh. Inder Chand Jain

Designation Divisional ChairmanContact DetailsPh No.Fax No.E-Mail

0562-28527440562-2720097NIL

5 Infrastructure AvailableLand Area (sq m) 15005.91

Constructed Area (sq m) Office: 200Workshop : 911.41Hostel : NIL

6 Existing Trades COPA (01), RTV (01), Mech. Tractor (01), Steno Hindi(01), Cutting & Sewing (01), Electrician (01), RAC (01),Welder (Applied) (01), Mech. Comm. EquipmentMaintenance (01), N/W technician (01), Data EntryOperator (01), Computer Aided Embroidery (01), CarTruck Driving (01), Hair & Skin Care (01)

7 Intake Capacity/ Present Strength 2248 Intake Target after

implementation of PPP Scheme128

Upgradation of existing Trades COPA (01), RTV (01), Mech. Tractor (01), Steno Hindi(01), Cutting & Sewing (01), Electrician (01), RAC (01),Welder (G&E) (01), Mech. Comm. EquipmentMaintenance (01), N/W technician (01), Data EntryOperator (01), Computer Aided Embroidery (01), CarTruck Driving (01)

Opening of New trades NILOpening of CoE NIL

9 Seed Money10 Proposed Expenditure11 Expenditure & %age (Dec 2011) NIL12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2011-NIC (2) & 17th

Nov, 2011

Page 85: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2011-12

Name of the ITI : ITI, Mehdawal

S. No. Particulars Details1 ITI (Name/Address) ITI, Mehdawal, sant kabir nagar

Ph No. 9450178383E-mail [email protected] Of Establishment 2006

2 Name Of Principal Sh. Shiv Balak ramPh No. 9450178383

3 Industry Partner (Address) M/s. Geeta Plastics, F-3 Plastic Complex Basti.Ph No. 9415038092

4 IMC Chairman Sh. Suresh Kumar BawaDesignation Partner

Contact DetailsPh No.Fax No.E-Mail

9415038092NILNIL

5 Infrastructure AvailableLand Area (sq m) 8000

Constructed Area (sq m) Total Constructed Area: 2490Hostel : NIL

6 Existing Trades Dress Making (01), Electrician (01), D Civil (01),Consumer Electronics (01), Info. Tech (01), PainterGeneral (01), RAC (01), Plumber (01), Welder (01),COPA (01), Hair & Skin Care (01), Fashion Technology(01)

7 Intake Capacity/ Present Strength 1928 Intake Target after

implementation of PPP Scheme192

Upgradation of existing Trades Dress Making (01), Electrician (01), D Civil (01),Consumer Electronics (01), Info. Tech (01), PainterGeneral (01), RAC (01), Plumber (01), Welder (01),COPA (01), Hair & Skin Care (01), Fashion Technology(01)

Opening of New trades NILOpening of CoE NIL

9 Seed Money10 Proposed Expenditure11 Expenditure & %age (Dec 2011) NIL12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2011-NIC

Page 86: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2011-12

Name of the ITI : ITI, Atrauli

S. No. Particulars Details1 ITI (Name/Address) ITI, Atrauli, Hardoi UP

Ph No. 9415564469E-mail [email protected] Of Establishment 1998

2 Name Of Principal Sh. Abdullah SalmanPh No. 9837469908

3 Industry Partner (Address) M/s. DSCL Sugar Hariawan, HardoiPh No. 9415149028

4 IMC Chairman Sh. Satish GaurDesignation Chief GM

Contact DetailsPh No.Fax No.E-Mail

[email protected]

5 Infrastructure AvailableLand Area (sq m) 13 acres

Constructed Area (sq m) Total Constructed : 2 acresHostel : NIL

6 Existing Trades COPA (01), Welder (01), Cutting & Sewing (01), StenoHindi (01), Electrician (01), RAC (01), Hair & Skin Care(01), Mech. Tractor (01), Mech. Communication (01),N/w Tech. (01), Data entry operator (01), ComputerAided Design (01)

7 Intake Capacity/ Present Strength 1928 Intake Target after

implementation of PPP Scheme192

Upgradation of existing Trades COPA (01), Welder (01), Cutting & Sewing (01), StenoHindi (01), Electrician (01), RAC (01), Hair & Skin Care(01), Mech. Tractor (01), Mech. Communication (01),N/w Tech. (01), Data entry operator (01), ComputerAided Design (01)

Opening of New trades NILOpening of CoE NIL

9 Seed Money10 Proposed Expenditure11 Expenditure & %age (Dec 2011) NIL12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2011-NIC (2)

Page 87: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2011-12

Name of the ITI : ITI, Khekra

S. No. Particulars Details1 ITI (Name/Address) ITI, Khekra, Bagpat UP

Ph No. 9412567124E-mail [email protected] Of Establishment

2 Name Of Principal Sh. Abar HusainPh No. 9412567124

3 Industry Partner (Address) M/s. Star Rides Elelctrical & Mechanical Works, 15Loni Araya Nagar, Gaziabad

Ph No. 94125671244 IMC Chairman Sh. Kuljeet Singh

Designation MDContact DetailsPh No.Fax No.E-Mail

[email protected]

5 Infrastructure AvailableLand Area (sq m) 10037 m2

Constructed Area (sq m) Office: 215 m2

Workshop : 794 m2

Hostel : NIL6 Existing Trades Welder (01), Fashion Technology (01), Dress making

(01), Consumer Goods (01)7 Intake Capacity/ Present Strength 608 Intake Target after

implementation of PPP Scheme60

Upgradation of existing Trades Welder (01), Fashion Technology (01), Dress making(01), Consumer Goods (01)

Opening of New trades NILOpening of CoE NIL

9 Seed Money10 Proposed Expenditure11 Expenditure & %age (Dec 2011) NIL12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2011-NIC

Page 88: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2011-12

Name of the ITI : ITI, Bhadohi Sant Ravidas Nagar

S. No. Particulars Details1 ITI (Name/Address) ITI, Bhadohi Sant Ravidas Nagar, UP

Ph No. 9451846284E-mail [email protected] Of Establishment 2006

2 Name Of Principal Sh. KK RamPh No. 9451846284

3 Industry Partner (Address) M/s. Samad Hadi Export, Samad Building Main Road,Bhadohi

Ph No. 98398099294 IMC Chairman Sh. Abdul Hadi

Designation PartnerContact DetailsPh No.Fax No.E-Mail

9839809929NILNIL

5 Infrastructure AvailableLand Area (sq m) 8100 m2

Constructed Area (sq m) Office: 143 m2

Workshop : 1550 m2

Hostel : NIL6 Existing Trades Fashion Technology (01), Dress making (01),

Consumer Elec. (01), Welder (01)7 Intake Capacity/ Present Strength 648 Intake Target after

implementation of PPP Scheme196

Upgradation of existing Trades Fashion Technology (01), Dress making (01),Consumer Elec. (01), Welder (01)

Opening of New trades Hair & Skin Care (01), D Mech. (01), COPA (01),Electrician (01), IT (01), Refrigeration (01), Plumber(01), Painter General (01)

Opening of CoE NIL9 Seed Money10 Proposed Expenditure11 Expenditure & %age (Dec 2011) NIL12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2011-NIC (1), 19th ec,

2011

Page 89: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2011-12

Name of the ITI : ITI, Jalesar, Etah

S. No. Particulars Details1 ITI (Name/Address) ITI, Jalesar, Etah, UP

Ph No. 05742233402E-mail [email protected] Of Establishment 2006

2 Name Of Principal Sh. Onkar SinghPh No. 9412305200

3 Industry Partner (Address) M/s. Alok Plastics P Ltd., C-4 Industrial State, EtahPh No. 9837008727

4 IMC Chairman Sh. S C JainDesignation MD

Contact DetailsPh No.Fax No.E-Mail

[email protected]

5 Infrastructure AvailableLand Area (sq m) 2 acres

Constructed Area (sq m) Office: 138Workshop : 2490Hostel : 155

6 Existing Trades Fashion Technology (01), Dress making (01),Consumer Elec. (01), Welder (01)

7 Intake Capacity/ Present Strength 648 Intake Target after

implementation of PPP Scheme196

Upgradation of existing Trades Fashion Technology (01), Dress making (01),Consumer Elec. (01), Welder (01)

Opening of New trades Hair & Skin Care (01), D Mech. (01), COPA (01),Electrician (01), IT (01), RAC (01), Plumber (01),Painter General (01)

Opening of CoE NIL9 Seed Money10 Proposed Expenditure11 Expenditure & %age (Dec 2011) NIL12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2011-NIC (3), 19th Dec,

2011

Page 90: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2011-12

Name of the ITI : ITI, Bihar, Pratapgarh

S. No. Particulars Details1 ITI (Name/Address) ITI, Bihar, Pratapgarh, UP

Ph No. 05342220429E-mail [email protected] Of Establishment 2006

2 Name Of Principal Sh. M ShuklaPh No. 05342220429

3 Industry Partner (Address) M/s. J P Motors P Ltd.Ph No. 0532-2602053, 08874204114

4 IMC Chairman Sh. Amit AgarwalDesignation Director

Contact DetailsPh No.Fax No.E-Mail

0532-2602053, [email protected]

5 Infrastructure AvailableLand Area (sq m) 8100 m2

Constructed Area (sq m) Office: 143 m2

Workshop : 1550 m2

Hostel : NIL6 Existing Trades Fashion Technology (01), Dress making (01),

Consumer Elec. (01), Welder (01)7 Intake Capacity/ Present Strength 648 Intake Target after

implementation of PPP Scheme196

Upgradation of existing Trades Fashion Technology (01), Dress making (01),Consumer Elec. (01), Welder (01)

Opening of New trades Hair & Skin Care (01), D Mech. (01), COPA (01),Electrician (01), IT (01), RAC (01), Plumber (01),Painter General (01)

Opening of CoE NIL9 Seed Money10 Proposed Expenditure11 Expenditure & %age (Dec 2011) NIL12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2011-NIC (2), 19th Dec,

2011

Page 91: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2011-12

Name of the ITI : ITI, Dhampur

S. No. Particulars Details1 ITI (Name/Address) ITI, Dhampur, Bijnor

Ph No. 9410071289E-mail [email protected] Of Establishment 2006

2 Name Of Principal Sh. Bhoop singhPh No. 9410071289

3 Industry Partner (Address) M/s. rama Paper Mills, Kiratpur Road, Bijnor UPPh No. 9917022660

4 IMC Chairman Sh. Sanjeev DikshitDesignation Personal manager

Contact DetailsPh No.Fax No.E-Mail

9914022660NILNIL

5 Infrastructure AvailableLand Area (sq m) 20000

Constructed Area (sq m) Office: 132Workshop : 1432Hostel : NIL

6 Existing Trades Electrician (01), RAC (01), D’man Mech. (01), IT (01).Mech. Consumer electronics (01), Painter Gen (01),COPA (01), Welder (01), Plumber (01), Hair & Skincare (01), Dress Making (01), Fashion Tech. (01)

7 Intake Capacity/ Present Strength 1928 Intake Target after

implementation of PPP Scheme192

Upgradation of existing Trades Electrician (01), RAC (01), D’man Mech. (01), IT (01).Mech. Consumer electronics (01), Painter Gen (01),COPA (01), Welder (01), Plumber (01), Hair & Skincare (01), Dress Making (01), Fashion Tech. (01)

Opening of New trades NILOpening of CoE NIL

9 Seed Money10 Proposed Expenditure11 Expenditure & %age (Dec 2011) NIL12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2011-NIC (7), 03th Jan,

2012

Page 92: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2011-12

Name of the ITI : ITI, Kannauj

S. No. Particulars Details1 ITI (Name/Address) ITI, Kannauj, UP

Ph No. 9628374550E-mail [email protected] Of Establishment 1998

2 Name Of Principal Sh. R K MishraPh No. 9628374550

3 Industry Partner (Address) M/s. Mustak Cold Storage, Gursahayganj GT Road,Kannauj

Ph No. 94501045154 IMC Chairman Sh. Mustak Ahmad

Designation OwnerContact DetailsPh No.Fax No.E-Mail

9839163117NILNIL

5 Infrastructure AvailableLand Area (sq m) 20799.94

Constructed Area (sq m) Office: 88Workshop : 1201.36Hostel : NIL

6 Existing Trades Electrician (01), Mech. RTV (01), mech. RAC (01),Steno (01), Welder (G&E) (01), Hair & Skin care (01),COPA (01), Cutting & Sewing (01), Mech. Tractor (01),Mech. Com. Equip. (01), Data Entry Operator (01),N/w Tech. (01), Comp. Add. Emb. (01), Car TruckDrawing (01)

7 Intake Capacity/ Present Strength 2288 Intake Target after

implementation of PPP Scheme228

Upgradation of existing Trades Electrician (01), Mech. RTV (01), mech. RAC (01),Steno (01), Welder (G&E) (01), Hair & Skin care (01),COPA (01), Cutting & Sewing (01), Mech. Tractor (01),Mech. Com. Equip. (01), Data Entry Operator (01),N/w Tech. (01), Comp. Add. Emb. (01), Car TruckDrawing (01)

Opening of New trades NILOpening of CoE NIL

9 Seed Money10 Proposed Expenditure11 Expenditure & %age (Dec 2011) NIL12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2011-NIC (6), 03th Jan,

2012

Page 93: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2011-12

Name of the ITI : ITI, Koil

S. No. Particulars Details1 ITI (Name/Address) ITI, Koil Aligarh UP

Ph No. 0571-2904455E-mail [email protected] Of Establishment 2006

2 Name Of Principal Sh. Rishi Pal SinghPh No. 0571-2904455

3 Industry Partner (Address) M/s. Chum Security Products, D-61, Sec-1, TalaNagari Aligarh. UP

Ph No. 9219423062, 92194230614 IMC Chairman Sh. Sunil Dutta

Designation ProprietorContact DetailsPh No.Fax No.E-Mail

9219423062, [email protected]

5 Infrastructure AvailableLand Area (sq m) 4300

Constructed Area (sq m) Constructed Area: 1114.8272Hostel : NIL

6 Existing Trades Welder (G&E) (01), Mech. Cons. Electronics (01),Fashion Technology (01), Dress Making (01)

7 Intake Capacity/ Present Strength 608 Intake Target after

implementation of PPP Scheme60

Upgradation of existing Trades Welder (G&E) (01), Mech. Cons. Electronics (01),Fashion Technology (01), Dress Making (01)

Opening of New trades NILOpening of CoE NIL

9 Seed Money10 Proposed Expenditure11 Expenditure & %age (Dec 2011) NIL12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2011-NIC (5), 03th Jan,

2012

Page 94: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2011-12

Name of the ITI : ITI, Mahilla Charbagh Lucknow

S. No. Particulars Details1 ITI (Name/Address) ITI, Mahilla Charbagh Lucknow

Ph No. 9415068602E-mail [email protected] Of Establishment 1965

2 Name Of Principal Sh. R K SrivastavaPh No. 9415068602

3 Industry Partner (Address) M/s. Tata Motors, Deva Road, LucknowPh No. 9415068602

4 IMC Chairman Sh. Vivek MalhotraDesignation AGM (HR)

Contact DetailsPh No.Fax No.E-Mail

9935091330

[email protected] Infrastructure Available

Land Area (sq m) 2479Constructed Area (sq m) Constructed Area: 1071

Hostel : NIL6 Existing Trades Cutting & Sewing (03), Steno Hindi (01), Steno English

(01), Secretarial Practice (01)7 Intake Capacity/ Present Strength 968 Intake Target after

implementation of PPP Scheme96

Upgradation of existing Trades Cutting & Sewing (03), Steno Hindi (01), Steno English(01), Secretarial Practice (01)

Opening of New trades NILOpening of CoE NIL

9 Seed Money10 Proposed Expenditure11 Expenditure & %age (Dec 2011) NIL12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2011-NIC (2), 03th Jan,

2012

Page 95: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2011-12

Name of the ITI : ITI, Manda

S. No. Particulars Details1 ITI (Name/Address) ITI, Manda, Allahabad

Ph No. 9335042501E-mail [email protected] Of Establishment 2006

2 Name Of Principal Sh. B N YadavPh No. 9335042501

3 Industry Partner (Address) M/s. S R Cannery, 151 Rasulabad, AllahabadPh No. 0522-2630687

4 IMC Chairman Sh. Vinay Kumar TandonDesignation Hony. Secretary

Contact DetailsPh No.Fax No.E-Mail

[email protected]

5 Infrastructure AvailableLand Area (sq m) 7416

Constructed Area (sq m) Office: 800Workshop : 1000Hostel : NIL

6 Existing Trades Mech. Consumer Electronics (01), Welder (01), DressMaking (01), Fashion Technology (01)

7 Intake Capacity/ Present Strength 608 Intake Target after

implementation of PPP Scheme60

Upgradation of existing Trades Mech. Consumer Electronics (01), Welder (01), DressMaking (01), Fashion Technology (01)

Opening of New trades NILOpening of CoE NIL

9 Seed Money10 Proposed Expenditure11 Expenditure & %age (Dec 2011) NIL12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2011-NIC (2), 03th Jan,

2012

Page 96: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2011-12

Name of the ITI : ITI, Bilsi

S. No. Particulars Details1 ITI (Name/Address) ITI, Bilsi, Budaun, UP

Ph No. 9412376148E-mail [email protected] Of Establishment 2006

2 Name Of Principal Sh. Saghirul HasanPh No. 9412376148

3 Industry Partner (Address) M/s. Prakash Chemicals BudaunPh No. 9412376148

4 IMC Chairman Sh. Prakash Chandra GuptaDesignation Proprietor

Contact DetailsPh No.Fax No.E-Mail

[email protected]

5 Infrastructure AvailableLand Area (sq m) 02 Acres

Constructed Area (sq m) Office: 200Workshop : 1700Hostel : NIL

6 Existing Trades Consumer Electronics (01), Welder (01), DressMaking (01), Fashion Technology (01)

7 Intake Capacity/ Present Strength 648 Intake Target after

implementation of PPP Scheme164

Upgradation of existing Trades Consumer Electronics (01), Welder (01), DressMaking (01), Fashion Technology (01)

Opening of New trades Painter Gen. (01), Draughtsman Mech. (01), Plumber(01), Hair & Skin Care (01), Electrician (01), COPA (01)

Opening of CoE NIL9 Seed Money10 Proposed Expenditure11 Expenditure & %age (Dec 2011) NIL12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2011-NIC (1), 03th Jan,

2012

Page 97: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2011-12

Name of the ITI : ITI, Fatehpur

S. No. Particulars Details1 ITI (Name/Address) ITI, Fatehpur, Barabanki, UP

Ph No. 9651068459E-mail [email protected] Of Establishment 2006

2 Name Of Principal Sh. Satnam SinghPh No. 9651068459

3 Industry Partner (Address) M/s. Tata Motors Ltd., Chinhat Industrial AreaLucknow

Ph No. 0522-28180124 IMC Chairman Sh. Vivek Malhotra

Designation AGMContact DetailsPh No.Fax No.E-Mail

[email protected]

5 Infrastructure AvailableLand Area (sq m) 1.97 acres

Constructed Area (sq m) Office: 80.50Workshop : 1056Hostel : NIL

6 Existing Trades Dress Making (01)7 Intake Capacity/ Present Strength 168 Intake Target after

implementation of PPP Scheme160

Upgradation of existing Trades Dress Making (01)Opening of New trades Mech. Consumer Elec. (01), Welder (01), Fashion

Tech. (01), D Man Civil (01), Painter Gen. (01),Plumber (01), Hair & Skin Care (01), COPA (01),Electrician (01)

Opening of CoE NIL9 Seed Money10 Proposed Expenditure11 Expenditure & %age (Dec 2011) NIL12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2011-NIC (2), 03th Jan,

2012

Page 98: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2011-12

Name of the ITI : ITI, Puwayan

S. No. Particulars Details1 ITI (Name/Address) ITI, Puwayan, Shahjahanpur, UP

Ph No. 05842-235176E-mail [email protected] Of Establishment 2006

2 Name Of Principal Sh. Amit Kumar PatelPh No. 9415718238

3 Industry Partner (Address) M/s. K R Pulp & Papers Ltd., Jalalabad Road,Shahjahanpur

Ph No. 0584-326880, 2401354 IMC Chairman Sh. G P Kothari

Designation Vice PresidentContact DetailsPh No.Fax No.E-Mail

05842-240135, [email protected]

5 Infrastructure AvailableLand Area (sq m) 3310.33

Constructed Area (sq m) Office: 25.08Workshop : 564.568Hostel : NIL

6 Existing Trades Welder (01), Dress Making (01), Fashion Technology(01), Consumer Electronics (01)

7 Intake Capacity/ Present Strength 588 Intake Target after

implementation of PPP Scheme160

Upgradation of existing Trades Welder (01), Dress Making (01), Fashion Technology(01), Consumer Electronics (01)

Opening of New trades D Man Civil (01), Hair & Skin Care (01), Painter Gen.(01), Plumber (01), Electrician (01), COPA (01)

Opening of CoE NIL9 Seed Money10 Proposed Expenditure11 Expenditure & %age (Dec 2011) NIL12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2011-NIC (8), 03th Jan,

2012

Page 99: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2011-12

Name of the ITI : ITI, Nawabganj

S. No. Particulars Details1 ITI (Name/Address) ITI, Nawabganj, Barabanki, UP

Ph No. 9839332639E-mail -Year Of Establishment 2006

2 Name Of Principal Sh. Ram PadarathPh No. 9839332639

3 Industry Partner (Address) M/s. Gobind Industries, BarabankiPh No. 9415048609

4 IMC Chairman Sh. Kushal Kumar AgarwalDesignation MD

Contact DetailsPh No.Fax No.E-Mail

[email protected]

5 Infrastructure AvailableLand Area (sq m) 2.985 acres

Constructed Area (sq m) Office: 838.96Workshop : NILHostel : NIL

6 Existing Trades Electrician (01), RAC (01), D/Man Civil (01), IT (01),Painter Gen (01), Consumer Elec. (01), Welder (G&E)(01), Plumber (01), Hair & Skin Care (01), DressMaking (01), Fashion Tech. (01)

7 Intake Capacity/ Present Strength 1888 Intake Target after

implementation of PPP Scheme188

Upgradation of existing Trades Electrician (01), RAC (01), D/Man Civil (01), IT (01),Painter Gen (01), Consumer Elec. (01), Welder (G&E)(01), Plumber (01), Hair & Skin Care (01), DressMaking (01), Fashion Tech. (01)

Opening of New trades NILOpening of CoE NIL

9 Seed Money10 Proposed Expenditure11 Expenditure & %age (Dec 2011) NIL12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2011-NIC (10), 03th

Jan, 2012

Page 100: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2011-12

Name of the ITI : ITI, Najibabad

S. No. Particulars Details1 ITI (Name/Address) ITI, Najibabad, Bijnor UP

Ph No. 8650308781, 9411686757E-mail [email protected] Of Establishment 1998

2 Name Of Principal Sh. Shiv Kumar SharmaPh No. 8650308781, 9411686757

3 Industry Partner (Address) M/s. Mohit Paper Mile Ltd. BijnorPh No. 01342-283051

4 IMC Chairman Sh. Vimal ChandolaDesignation Personnel Manager

Contact DetailsPh No.Fax No.E-Mail

01342-283051NILMohit [email protected]

5 Infrastructure AvailableLand Area (sq m) 20000

Constructed Area (sq m) Office: NILWorkshop : NILHostel : NIL

6 Existing Trades Electrician (01), RAC (01), RTV (01), Welder (01), M.Tractor (01), Hair & Skin Care (01), Cutting & Sewing(01), Steno (01), COPA (01), DTO (01), Net Tech. (01),M. Column (01), Comp. Aided Emb. (01)

7 Intake Capacity/ Present Strength 2088 Intake Target after

implementation of PPP Scheme208

Upgradation of existing Trades Electrician (01), RAC (01), RTV (01), Welder (01), M.Tractor (01), Hair & Skin Care (01), Cutting & Sewing(01), Steno (01), COPA (01), DTO (01), Net Tech. (01),M. Column (01), Comp. Aided Emb. (01)

Opening of New trades NILOpening of CoE NIL

9 Seed Money10 Proposed Expenditure11 Expenditure & %age (Dec 2011) NIL12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2011-NIC (11), 03th

Jan, 2012

Page 101: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2011-12

Name of the ITI : ITI, Hasanganj

S. No. Particulars Details1 ITI (Name/Address) ITI, Hasanganj, Unnao, UP

Ph No. 9450450591E-mail Giti. [email protected] Of Establishment 2006

2 Name Of Principal Sh. Hub LalPh No. 9450450591

3 Industry Partner (Address) M/s. Model Tannery P Ltd.Ph No. 9450450591

4 IMC Chairman Sh. Maqsood AlamDesignation CMD & Chairman

Contact DetailsPh No.Fax No.E-Mail

[email protected]

5 Infrastructure AvailableLand Area (sq m) 2 acres

Constructed Area (sq m) Office: 76.19Workshop : 1343.88Hostel : NIL

6 Existing Trades Fashion Technology (01), Dress Making (01),Consumer Electronics (01)

7 Intake Capacity/ Present Strength 488 Intake Target after

implementation of PPP Scheme148

Upgradation of existing Trades Fashion Technology (01), Dress Making (01),Consumer Electronics (01)

Opening of New trades Electrician (01), Painter (01), COPA (01), Plumber(01), Hair & Skin Care (01), D Man/ Civil (01)

Opening of CoE NIL9 Seed Money10 Proposed Expenditure11 Expenditure & %age (Dec 2011) NIL12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2011-NIC (2), 03th Jan,

2012

Page 102: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2011-12

Name of the ITI : ITI, Barhalganj

S. No. Particulars Details1 ITI (Name/Address) ITI, Barhalganj, Dist. Gorakhpur, UP-273001

Ph No. 9793072731, 9838552851E-mail [email protected], [email protected],

[email protected] Of Establishment 2006

2 Name Of Principal Sh. Arvind KumarPh No. 9793072731, 9838552851

3 Industry Partner (Address) M/s. Purvanchal Industries, 97-A Jatepur NorthGorakhnath, Gorakhpur

Ph No. 98385528514 IMC Chairman Sh. Pradeep Kumar Upadhyay

Designation NILContact DetailsPh No.Fax No.E-Mail

9415824260NILNIL

5 Infrastructure AvailableLand Area (sq m) 7000

Constructed Area (sq m) Office: 120Workshop : 43Hostel : NIL

6 Existing Trades Fashion Technology (01), Dress Making (01), Welder(01)

7 Intake Capacity/ Present Strength 448 Intake Target after

implementation of PPP Scheme44

Upgradation of existing Trades Fashion Technology (01), Dress Making (01), Welder(01)

Opening of New trades NILOpening of CoE NIL

9 Seed Money10 Proposed Expenditure11 Expenditure & %age (Dec 2011) NIL12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2011-NIC (3), 03th Jan,

2012

Page 103: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2011-12

Name of the ITI : ITI, Mohammadi (Kheri)

S. No. Particulars Details1 ITI (Name/Address) ITI, Mohammadi (Kheri), UP

Ph No. 05872-270175E-mail [email protected] Of Establishment 2006

2 Name Of Principal Sh. P K SrivastavaPh No. 05872-270175

3 Industry Partner (Address) M/s. Janta Rice Mill & Vishok Traders LRP Chauraha,Lakhimpur, Kheri

Ph No. 05872-2623884 IMC Chairman Sh. Vinod Kumar Mishra

Designation NILContact DetailsPh No.Fax No.E-Mail

[email protected]

5 Infrastructure AvailableLand Area (sq m) 1 Hectare

Constructed Area (sq m) Total Constructed: 848.49Hostel : NIL

6 Existing Trades Electrician (01), RAC (01), D Man mech. (01),Information technology (01), Consumer Electronics(01), Painter General (01), Welder (01), Plumber (01),COPA (01), Hair & Skin Care (01), Fashion Technology(01), Dress Making (01)

7 Intake Capacity/ Present Strength 1928 Intake Target after

implementation of PPP Scheme192

Upgradation of existing Trades Electrician (01), RAC (01), D Man mech. (01),Information technology (01), Consumer Electronics(01), Painter General (01), Welder (01), Plumber (01),COPA (01), Hair & Skin Care (01), Fashion Technology(01), Dress Making (01)

Opening of New trades NILOpening of CoE NIL

9 Seed Money10 Proposed Expenditure11 Expenditure & %age (Dec 2011) NIL12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2011-NIC (5), 17th Jan,

2012

Page 104: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2011-12

Name of the ITI : ITI, Alapur

S. No. Particulars Details1 ITI (Name/Address) ITI, Alapur, Ambedkar Nagar, UP

Ph No. 9453614794, 9628374375E-mail [email protected] Of Establishment 1995

2 Name Of Principal Sh. Ram SewakPh No. 9453614794, 9628374375

3 Industry Partner (Address) M/s. Foundary Works, Nai Basti Kasmiriya Tanda, ANPh No. 05273-222343, 9415139283

4 IMC Chairman Sh. Ram Pyare VishwakarmaDesignation Chairman & CMD

Contact DetailsPh No.Fax No.E-Mail

05273-222343, 9415139283NILNIL

5 Infrastructure AvailableLand Area (sq m) 2 Acres

Constructed Area (sq m) Office: 1742.62Workshop : 1084.23Hostel : NIL

6 Existing Trades Electrician (01), Fitter (01), Hair & Skin Care (01),Mechanic Tractor (01)

7 Intake Capacity/ Present Strength 648 Intake Target after

implementation of PPP Scheme64

Upgradation of existing Trades Electrician (01), Fitter (01), Hair & Skin Care (01),Mechanic Tractor (01)

Opening of New trades NILOpening of CoE NIL

9 Seed Money10 Proposed Expenditure11 Expenditure & %age (Dec 2011) NIL12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2011-NIC (4), 17th Jan,

2012

Page 105: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2011-12

Name of the ITI : ITI, Chandan Chauki

S. No. Particulars Details1 ITI (Name/Address) ITI, Chandan Chauki, Kheri, UP

Ph No. 9455162324E-mail [email protected] Of Establishment 1998

2 Name Of Principal Sh. Ram SinghPh No. 9455162324

3 Industry Partner (Address) M/s. M B Flour Mill Industries P Ltd., SitapurPh No. 9415047071, 9918300571

4 IMC Chairman Sh. Umesh Chandra AgarwalDesignation CMD

Contact DetailsPh No.Fax No.E-Mail

9415047071, [email protected]

5 Infrastructure AvailableLand Area (sq m) 4.64 Acres

Constructed Area (sq m) Office: 636.05Workshop : 687.36Hostel : NIL

6 Existing Trades Electrician (01), Welder (01), Mech. AC (01), Radio TV(01), COPA (01), Steno Hindi (01), Mech. Tractor (01),Hair & Skin Care (01), Cutting & Sewing (01), mech.Comm. Equipment maint. (01), Car Truck Driving (01)

7 Intake Capacity/ Present Strength 1768 Intake Target after

implementation of PPP Scheme176

Upgradation of existing Trades Electrician (01), Welder (01), Mech. AC (01), Radio TV(01), COPA (01), Steno Hindi (01), Mech. Tractor (01),Hair & Skin Care (01), Cutting & Sewing (01), mech.Comm. Equipment maint. (01), Car Truck Driving (01)

Opening of New trades NILOpening of CoE NIL

9 Seed Money10 Proposed Expenditure11 Expenditure & %age (Dec 2011) NIL12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2011-NIC (3), 17th Jan,

2012

Page 106: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2011-12

Name of the ITI : ITI, Dadri

S. No. Particulars Details1 ITI (Name/Address) ITI, Dadri, Dist. Gautam Budh Nagar UP

Ph No. 9456691898E-mail [email protected] Of Establishment 2006

2 Name Of Principal Sh. Kishan SwaroopPh No. 9456691898

3 Industry Partner (Address) M/s. Crane Bel International P Ltd., E-7, Kavi NagarIndustrial Area, Ghaziabad

Ph No. 0120-3263281-854 IMC Chairman Sh. Ashok Kumar Gupta

Designation ChairmanContact DetailsPh No.Fax No.E-Mail

0120-3263281-850120-2700339, [email protected]

5 Infrastructure AvailableLand Area (sq m) 81000

Constructed Area (sq m) Office: 140Workshop : GF: 1294, FF: 844.53Hostel : NIL

6 Existing Trades Electrician (01), D Mech. (01), RAC (01), ITESM (01)7 Intake Capacity/ Present Strength 648 Intake Target after

implementation of PPP Scheme64

Upgradation of existing Trades Electrician (01), D Mech. (01), RAC (01), ITESM (01)Opening of New trades NILOpening of CoE NIL

9 Seed Money10 Proposed Expenditure11 Expenditure & %age (Dec 2011) NIL12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2011-NIC (9), 17th Jan,

2012

Page 107: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2011-12

Name of the ITI : ITI, Lakhna

S. No. Particulars Details1 ITI (Name/Address) ITI, Lakhna, Etawah

Ph No. 9935282329E-mail [email protected] Of Establishment 2006

2 Name Of Principal Sh. Santosh Kumar KamalPh No. 9935282329

3 Industry Partner (Address) M/s. Sai Sheet Garh, Kanpur Agra Highway, EtawahPh No. 9219635851

4 IMC Chairman Sh. Kaushlendra GuptaDesignation Partner

Contact DetailsPh No.Fax No.E-Mail

9219635851NILNIL

5 Infrastructure AvailableLand Area (sq m) 9631.60

Constructed Area (sq m) Office: 942.42Workshop : 669.65Hostel : NIL

6 Existing Trades Mech. Consumer Electronics (01), Welder (G&E) (01),Fashion Technology (01), Dress Making (01)

7 Intake Capacity/ Present Strength 608 Intake Target after

implementation of PPP Scheme60

Upgradation of existing Trades Mech. Consumer Electronics (01), Welder (G&E) (01),Fashion Technology (01), Dress Making (01)

Opening of New trades NILOpening of CoE NIL

9 Seed Money10 Proposed Expenditure11 Expenditure & %age (Dec 2011) NIL12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2011-NIC (6), 17th Jan,

2012

Page 108: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2011-12

Name of the ITI : ITI, Kairana

S. No. Particulars Details1 ITI (Name/Address) ITI, Kairana, Muzaffarnagar, UP

Ph No. 0131-2620953E-mail [email protected] Of Establishment 2006

2 Name Of Principal Sh. K C JoshiPh No. 0131-2620953

3 Industry Partner (Address) M/s. Mansurpur Distel. & Chemicals Works,Mansurpur, Muzaffarnagar

Ph No. 98377902234 IMC Chairman Sh. J P Tripathi

Designation Vice PresidentContact DetailsPh No.Fax No.E-Mail

9837790223NILNIL

5 Infrastructure AvailableLand Area (sq m) 14340

Constructed Area (sq m) Office: 234Workshop : 2173Hostel : NIL

6 Existing Trades Electrician (01), Welder (G&E) (01), COPA (01), RAC(01), Plumber (01), Fashion Technology (01), Hair &Skin Care (01), IT (01), D Mech. (01)

7 Intake Capacity/ Present Strength 1448 Intake Target after

implementation of PPP Scheme144

Upgradation of existing Trades Electrician (01), Welder (G&E) (01), COPA (01), RAC(01), Plumber (01), Fashion Technology (01), Hair &Skin Care (01), IT (01), D Mech. (01)

Opening of New trades NILOpening of CoE NIL

9 Seed Money10 Proposed Expenditure11 Expenditure & %age (Dec 2011) NIL12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2011-NIC (8), 17th Jan,

2012

Page 109: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2011-12

Name of the ITI : ITI, Lisad

S. No. Particulars Details1 ITI (Name/Address) ITI, Lisad, Muzaffarnagar

Ph No. [email protected] 2006Year Of Establishment Sh. M K Sharma

2 Name Of Principal 0131-2620953Ph No. M/s. Mansurpur Distel. & Chemicals Works,

Mansurpur, Muzaffarnagar3 Industry Partner (Address) 9837790223

Ph No. Sh. J P Tripathi4 IMC Chairman Vice President

DesignationContact Details 9837790223Ph No.Fax No.E-Mail

[email protected]

5 Infrastructure AvailableLand Area (sq m) 14340

Constructed Area (sq m) Office: 234Workshop : 2173Hostel : NIL

6 Existing Trades Welder (G&E) (01), Consumer elec. (01)7 Intake Capacity/ Present Strength 288 Intake Target after

implementation of PPP Scheme28

Upgradation of existing Trades Welder (G&E) (01), Consumer elec. (01)Opening of New trades NILOpening of CoE NIL

9 Seed Money10 Proposed Expenditure11 Expenditure & %age (Dec 2011) NIL12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2011-NIC (7), 17th Jan,

2012

Page 110: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2011-12

Name of the ITI : ITI, Tanda

S. No. Particulars Details1 ITI (Name/Address) ITI, Tanda, Ambedkar Nagar

Ph No. 9415917085E-mail [email protected] Of Establishment 1988

2 Name Of Principal Sh. Om Prakash DasPh No. 9415917085

3 Industry Partner (Address) M/s. MD Saket Cold Storage, TandaPh No. 9453614794

4 IMC Chairman Sh. Radhey Raman AgarwalDesignation Chairman & CMD

Contact DetailsPh No.Fax No.E-Mail

9838710038, 05273-222022NILNIL

5 Infrastructure AvailableLand Area (sq m) 2 Acres

Constructed Area (sq m) Office: NILWorkshop : NILHostel : NIL

6 Existing Trades Cutting & Sewing (01), Steno Hindi (01), Electrician(01), Electronics (01)

7 Intake Capacity/ Present Strength 648 Intake Target after

implementation of PPP Scheme64

Upgradation of existing Trades Cutting & Sewing (01), Steno Hindi (01), Electrician(01), Electronics (01)

Opening of New trades NILOpening of CoE NIL

9 Seed Money10 Proposed Expenditure11 Expenditure & %age (Dec 2011) NIL12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2011-NIC (1), 17th Jan,

2012

Page 111: Uttar Pradesh - dget.nic.indget.nic.in/upload/uploadfiles/files/itits state/UttarPradeshITIs.pdf · Uttar Pradesh S No. 2007-08 2008-09 2009-10 2010-11 2011-12 1. ITI, Azamgarh ITI,Agra

Status of the ITI under the Scheme Upgradation of 1396 Govt. ITIs through Public Private Partnershipcovered during 2011-12

Name of the ITI : ITI, Akbarpur Ambedkar Nagar

S. No. Particulars Details1 ITI (Name/Address) ITI, Akbarpur Ambedkar Nagar, UP

Ph No. 9450824372E-mail [email protected] Of Establishment 2006

2 Name Of Principal Sh. Jagdish RamPh No. 9450824372

3 Industry Partner (Address) M/s. Saket Cold Storage & Ice Factory P Ltd.Ph No. 9838710038

4 IMC Chairman Sh. Radhey Raman AgarwalDesignation Chairman & CMD

Contact DetailsPh No.Fax No.E-Mail

9838710038NILNIL

5 Infrastructure AvailableLand Area (sq m) 1294

Constructed Area (sq m) Office: NILWorkshop : NILHostel : NIL

6 Existing Trades Electrician (01), D Man mech. (01), RAC (01), IT (01),Painter Gen. (01), Mech. Consumer Elec. (01), COPA(01), Welder (G&E) (01), Plumber (01), Hair & SkinCare (01), Dress making (01), Fashion Technology (01)

7 Intake Capacity/ Present Strength 1928 Intake Target after

implementation of PPP Scheme192

Upgradation of existing Trades Electrician (01), D Man mech. (01), RAC (01), IT (01),Painter Gen. (01), Mech. Consumer Elec. (01), COPA(01), Welder (G&E) (01), Plumber (01), Hair & SkinCare (01), Dress making (01), Fashion Technology (01)

Opening of New trades NILOpening of CoE NIL

9 Seed Money10 Proposed Expenditure11 Expenditure & %age (Dec 2011) NIL12 Revenue (Dec 2011) NIL13 Loan Released (Letter No. & Date) DGET-35(1396)/Uttar Pradesh/2011-NIC (4), 17th Jan,

2012