CURRICULUM VITAE V.Sathasivam,S/o. V.Vaikundamoorthy,5, South Street,Sundarapandiam (post),Srivilliputhur (Taluk)Virudhunagar District, Mobile: +919042901002Tamil Nadu, Email: [email protected]:626126 [email protected] Skype ID:vaigundamoorthy.sathasivam Career Objective:
Keeping in view my academic knowledge, professional skills and personal strengths, I seek aSenior level position in an established organization and grow into a responsible position.
WORKING EXPERIENCE:
1. Civil Inspector:
Period : Nov2015 to till now
Client : RAMPEDRiyadh Metro rail Project (SAUDI) Cut& Cover, Station 4C2 /6D1
Role & Responsibilities:
Metro underground station work
Construction Supervision of Diaphragm Wall, Strutting and Excavation Works.
Ensuring safe working of all construction activities, machinery and workers working at site.
Timely completion of assigned works as per project schedules with Quality and Safety.
NCRs to contractors for non-compliance of project quality standards. Daily, weekly and monthly reports on progress and resources,
assistance to Management in official correspondence. Visiting of labs and plants for material checking and quality
compliance. Monitoring of Geotechnical instrumentation, utility diversion works,
traffic diversion, Review of contractors planned schedules, work programmes and
suggesting modifications.
Review of project documents such as Method statements, ITPs, progress documents, FCRs, DDSQs and feedback from site to management.
- Carry out regular site inspections and review, monitor contractor’s shop drawings, materials, method statements and progress on site and working closely with Construction Superintendent /Manager.
- Monitoring civil, structural work on site and monitoring the contractor compliance with the approved safety policy and regulations.
- Responding to queries from Contractors and assisting in preparation of monthly progress reports.
- Raise Non Conformance Reports (NCR) and Discrepancy Report (DR), when activities deviate from the Contract Specifications or normal Construction industry practices. Maintain daily reports of site activities and resources Requirements.
- Monitoring and reporting on contractor baseline as well as the 3 months rolling programme.
- Reviewing of method statements, material approval and construction procedure etc.
- Involved in land acquisition with various Departments. - Track line: - ●Chennai underground metro rail Mint to Egmore underground station temporary &permanent track
slab, rail fixing, track alignment & switch crossing as per approved method statement checked with Quality & safety, Lifting & Fixing Plan as per approved machinery & the chart provides the lifting capacity of the plant, according to various parameters such as:
- • Distance from boom center- • Extension rate of outriggers- • Value of counter weight (in case of mobile crane or RR excavator)- • Height of boom (in case of mobile crane or tele-handler)- • Lifting on rails wheels or rubber wheels (in case of RR excavator)- • Lifting radius (in case of RR excavator)- • Basic lifting operation: cargo weight below 10 tons- • Standard lifting operation: cargo weight from 10 tons to 40 tons- • Complex lifting operation: cargo weight above 40 tons, above mention the procedure via fixed - Pre-assembled , indirect lift for Cut & cover & Underground station used in Riyadh & Chennai.
Kashmir:TBM temporary track & rail fixing as per approved method statement checked& diversion tunnel gentry’s erection temporary track & rail fixing alignment checked with as per method statement
2. Site Engineer:
Period : Dec 2011 to 2015Nov
Contractor : Afton’s Infra structure Ltd Chennai Metro Rail Project (Tamil Nadu).
Designation: Site Engineer (ER2)
Role & Responsibilities:
Metro underground station work
Construction Supervision of Diaphragm Wall, Strutting and Excavation Works.
Ensuring safe working of all construction activities, machinery and workers working at site.
Timely completion of assigned works as per project schedules with Quality and Safety.
NCRs to contractors for non-compliance of project quality standards. Daily, weekly and monthly reports on progress and resources,
assistance to Management in official correspondence. Visiting of labs and plants for material checking and quality
compliance. Monitoring of Geotechnical instrumentation, utility diversion works,
traffic diversion, Review of contractors planned schedules, work programmes and
suggesting modifications. Review of project documents such as Method statements, ITPs,
progress documents, FCRs, DDSQs and feedback from site to management.
- Carry out regular site inspections and review, monitor contractor’s shop drawings, materials, method statements and progress on site and working closely with Construction Superintendent /Manager.
- Monitoring civil, structural work on site and monitoring the contractor compliance with the approved safety policy and regulations.
- Responding to queries from Contractors and assisting in preparation of monthly progress reports.
- Raise Non Conformance Reports (NCR) and Discrepancy Report (DR), when activities deviate from the Contract Specifications or normal Construction industry practices. Maintain daily reports of site activities and resources Requirements.
- Monitoring and reporting on contractor baseline as well as the 3 months rolling programme.
- Reviewing of method statements, material approval and construction procedure etc.
- Involved in land acquisition with various Departments. Track line:
●Chennai underground metro rail Mint to Egmore underground station temporary &permanent track slab, railfixing, track alignment & switch crossing as per approved method statement checked with Quality &safety, Lifting & Fixing Plan as per approved machinery &the chart provides the lifting capacity of the plant, according to various parameters such as:• Distance from boom center• Extension rate of outriggers• Value of counter weight (in case of mobile crane or RR excavator)• Height of boom (in case of mobile crane or tele-handler)
• Lifting on rails wheels or rubber wheels (in case of RR excavator)• Lifting radius (in case of RR excavator)
• Basic lifting operation: cargo weight below 10 tons• Standard lifting operation: cargo weight from 10 tons to 40 tons• Complex lifting operation: cargo weight above 40 tons, above mention the procedure via fixed
Pre-assembled, indirect lift for Cut & cover & Underground station used in Riyadh & Chennai.
Architect Structural:- Concourse level Rooms dimension, diagonal & verticality checked every 2m height (plump),
Fall celling Tray fixing, Room final finishing, Tiles fixing, concourse floor finishing screed & OT Duct segment Erection of base slab checked with as per method statement with Quality & safety
3. Site Engineer
Period : Janu2011 to Dec2011
Contractor : Hindustan Construction co. Ltd, Kishan Ganga Hydro power projectGreuze(J&K).1200mwt
Designation: Site Engineer (S1)
Role & Responsibilities:
Dam site Excavation work : As per project schedule of Right& left abutment excavation, Shot creating & measurement work wire mesh fixing as per drawing. Before casting of concreting installation, shotcrete, rock bolt, anchoringof block fixing & test as per required Quality &safety.
Every layer by layer (height of 1m) dam site block in As per required height of levelling concrete quantity measurement with drawing,Dam site grouting marking drilling work & reinforcement’s Qty work As per Req...(GB2 & Consolidate Method)
Tunnelling work : Excavation &drilling work, concreting work, Inlet Gate for (Diversion
Tunnel) Drill & Excavation Measurements Work, inlet portal rip fixing & tunnelling rock bolt
Installation& testing work, Tunnel Gentry Erection, Kerb area measurements reinforcement
Work rail track alignment fixing work as per approved method statement of safety & Quality.
Coffer dam sitework :Area measurementwork bottomconcreting, groutingwork, clay soil
Compacting of rolling work, Field density test as per Requirements.
Intakestructure work : As per Approved Drawing required Excavated area, as per project schedule each every layer by layer Reinforcement measurement work, as per required BBS with area of concrete qty.
HRT ,Diversion & Power house (Tunnel) :As per Approved Drawing schedule of Drilling blast , Before shortcreating installation of Rock bolting, safety Rib erection ,Mud concrete qty work ,temporary rail track & sleeper alignment fixing work, back filing work, inspection for
segment lips & steps swelled bar fixing Segment ring to ring joint grout (outer) as per method statement
TBM (underground metro rail & Hydro power project) : As per Schedule of inspection for Ring segment lips & steps swelled bar fixing,temporary segment,rail track & sleeper alignment fixing work, Segment ring to ring joint grout (outer) as per Quality method statement checked ,earth pressure with face pressure, Grouting pressure also as per required checked Segment before installation surface cracks & as per Required dimension checked.
4. Site Engineer
Period : Dec 2007 to Janu2011
Contractor : SEW Infrastructure Ltd, Hydro power project (99mwt) rangpodam in Sikkim
Designation: Site Engineer (Including Dam Project & Tunnel Power Plant Quality & Site Engineer)
Role & Responsibilities:
Dam site Excavation work : As per project schedule of Right & left abutment excavation, Shot creating & measurement work wire mesh fixing as per drawing. Before casting of concreting installation, shotcrete, rock bolt, anchoringof block fixing & test as per required Quality &safety.
Every layer by layer (height of 1m) dam site block in As per required height of levelling concrete quantity measurement with drawing,Dam site grouting marking drilling work & reinforcement’s Qty work As per Req...(GB2 & Consolidate Method)
Tunnelling work : Excavation &drilling work, concreting work, Inlet Gate for (Diversion
Tunnel) Drill & Excavation Measurements Work, inlet portal rip fixing & tunnelling rock bolt
Installation& testing work, Tunnel Gentry Erection, Kerb area measurements reinforcement
Work rail track alignment fixing work as per approved method statement of safety & Quality.
Coffer dam sitework :Area measurementwork bottomconcreting, groutingwork, clay soil
Compacting of rolling work, Field density test as per Requirements.
Intakestructure work : As per Approved Drawing required Excavated area, as per project schedule each every layer by layer Reinforcement measurement work, as per required BBS with area of concrete qty.
HRT ,Diversion & Power house (Tunnel) :As per Approved Drawing schedule of Drilling blast , Before shortcreating installation of Rock bolting, safety Rib erection ,Mud concrete qty work ,temporary rail track & sleeper alignment fixing work, back filing work, inspection for segment lips & steps swelled bar fixing Segment ring to ring joint grout (outer) as per method statement
TBM (underground metro rail & Hydro power project) : As per Schedule of inspection for Ring segment lips & steps swelled bar fixing,temporary segment, rail track & sleeper alignment fixing work, Segment ring to ring joint grout (outer) as per Quality method statement checked, earth pressure with face pressure, Grouting pressure also as per required checked Segment before installation surface cracks & as per Required dimension checked.
5. Site Engineer
Period : May 2006 to June 2007
Consultant : Costal Project pvt. Ltd., Hydro power project (1200mwt) mangan, Sikkim.
Designation : Site Engineer (Building & Tunnel)
Role & Responsibilities:
Dam site Excavation work : As per project schedule of Right& left abutment excavation, Shot creating & measurement work wire mesh fixing as per drawing. Before casting of concreting installation, shotcrete, rock bolt, anchoringof block fixing & test as per required Quality &safety.
Every layer by layer (height of 1m) dam site block in As per required height of levelling concrete quantity measurement with drawing,Dam site grouting marking drilling work & reinforcement’s Qty work As per Req...(GB2 & Consolidate Method)
Tunnelling work : Excavation &drilling work, concreting work, Inlet Gate for (Diversion
Tunnel) Drill & Excavation Measurements Work, inlet portal rip fixing & tunnelling rock bolt
Installation& testing work, Tunnel Gentry Erection, Kerb area measurements reinforcement
Work rail track alignment fixing work as per approved method statement of safety & Quality.
Coffer dam sitework :Area measurementwork bottomconcreting, groutingwork, clay soil
Compacting of rolling work, Field density test as per Requirements.
Intakestructure work : As per Approved Drawing required Excavated area, as per project schedule each every layer by layer Reinforcement measurementwork, as per required BBS with area of concrete qty.
HRT ,Diversion & Power house (Tunnel) :As per Approved Drawing schedule of Drilling blast ,Before shortcreating installation of Rock bolting, safety Rib erection ,Mud concrete qty work ,temporary rail track &sleeper alignment fixing work, back filing work, inspection for segment lips & steps swelled bar fixingSegment ring to ring joint grout (outer) as per method statement
TBM (underground metro rail & Hydro power project) : As per Schedule of inspection for Ring segment lips & steps swelled bar fixing,temporary segment ,rail track & sleeper alignment fixing work, Segment ring to ring joint grout (outer) as per Quality method statement checked ,earth pressure with face pressure, Grouting pressure also as per required checked Segment before installation surface cracks & as per Required dimension checked.
6. Lab Technician
Period : May 2004 to June 2006
Consultant : Kalasalingam University, Anand Nagar, Krishnankoil - 626190
Designation : Lab Technician
LAB TESTING WORK:
1 Cement: - consistency, Initial and final setting Soundness Fineness of cement. Making motor and moulds and finding the compressive strength for type of grades (33,43,53)
2 Aggregate: - Gradation, Impact value, Flakiness & Elongation Index, Los Angeles Abrasion Value, water absorption, Specific gravity, Bulk Density, TFV aggregate, crushing Value, Silt content etc.
3 Concrete: - Includes Slump tests, testing the concrete cubes for compressive strength, Concrete Beams for Flexural Strength with compaction factor.
4 Concrete Mix Designs: - Responsible for mix designs of concrete M-15, M-20 for PCC, Kerb, M-25, M-30, M-35, M-40, M-45 for grades for RCC, , Shot Creating, Grouting, Conbextra grouting, GP2and selecting of admixtures for suitable concretes, etc.,
5 Attending field density test for embankment, sub grade, GSB, WMM, etc and finding the percentage of compaction achieved. Attending and checking the rate spray of Primer/Tact coat at site.
6 And responsible for conducting all daily testing likes Cement, Aggregate, and Concrete & Bituminous Layers.
7 Responsible for conducting all Lab Equipment & Batching plant, WMM Plant & Hot Mix Plant Calibrations&switch stutterer plant
8 Reinforcement: Tensile test for universal testing machine welding checked in Dpt test, dimension&Spacing, thickness, shuttering cover level maintained checking work.
9 Bentonite properties:Checking in Viscosity,Density, Ph.value, Sand Content Proper maintained work.
10 Grout:conducting for plunge in column toe grout &d-wall joints for tam grout,d-wall joints (inner station) wire mesh injection grout, shear pin grout,pugrout IS per design mix used.
11 Water proofing: Conducting for over Roof Concourse& Base slab Main d-wall, Entry d-wall primer&membrane,screed,d-wall repairing &grouting work checking as per IS followed method statement.
Educational Qualifications:
Course School/College University/Board Year of Passing %Marks
10th
Government Higher Secondary School. Sundarapandiam
State Board 1999 62.2
12th
Government Higher Secondary School. Sundarapandiam.
State Board 2001 60
DCE
Arulmigukalasalingam Polytechnic of college.
Krishnankovil.State Board 2004 69.8
Technical Skills:
Ms Office, Ex-cel, Auto CAD
Personal Details:
Name : V.Sathasivam
Father’s Name : V.Vaikundamoorthy
Date of Birth : 05-05-1983
Sex : Male
Languages known : English, Tamil & Hindi
Nationality : Indian
Religion :Hindu
Field Experience : 12Years
Present Salary : Rs.200000 (per month)
Date of Birth: 05/05/1983 –Place Of Birth: SUNDARAPANDIAM
PASSPORT NO. (NEW).N8271478, Old PASSPORT NO.G1184521 Date of Issue: 14/06/2016 Date of Issue:15/12/2006
Date of Expiry: 13.06.2026Date of Expiry: 14/12/2016
Place of Issue: RIYATH Place of Issue: -TIRUCHIRAPPALLI