vlk/kj.k hkkx [k.m 3 mi&[k.m (ii)€¦ · ¹hkkx ii µ[k.m 3(ii)º hkkjr dk jkti=k % vlk/kj.k 3...

3
2201 GI/2018 (1) jftLVªh la ö Mhö ,yö&33004@99 REGD. NO. D. L.-33004/99 vlk/kj.k EXTRAORDINARY Hkkx II—[k.M 3mi&[k.M (ii) PART II—Section 3—Sub-section (ii) izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY la- 1456] ubZ fnYyh] lkseokj] vçS y 16] 2018@pS=k 26] 1940 No. 1456] NEW DELHI, MONDAY, APRIL 16, 2018/CHAITRA 26, 1940

Upload: others

Post on 19-Oct-2020

21 views

Category:

Documents


0 download

TRANSCRIPT

  • 2201 GI/2018 (1)

    jftLVªh laö Mhö ,yö&33004@99 REGD. NO. D. L.-33004/99

    vlk/kj.k

    EXTRAORDINARY

    Hkkx II—[k.M 3—mi&[k.M (ii) PART II—Section 3—Sub-section (ii)

    izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY

    la- 1456] ubZ fnYyh] lkseokj] vçSy 16] 2018@pS=k 26] 1940 No. 1456] NEW DELHI, MONDAY, APRIL 16, 2018/CHAITRA 26, 1940 नवीन और नवीकरणीय ऊजा मं�ालय नवीन और नवीकरणीय ऊजा मं�ालय नवीन और नवीकरणीय ऊजा मं�ालय नवीन और नवीकरणीय ऊजा मं�ालय अिधसूचना अिधसूचना अिधसूचना अिधसूचना नई �द� ली, 16 अैल, 2018 का.आ.का.आ.का.आ.का.आ. 1602(1602(1602(1602(अअअअ))))....————यत: क� � सरकार �ारा �दनांक 5 िसतंबर, 2017 के का.आ. 2920 (अ) के मा' यम से ''सौर काशवो� टीय, णािलयां उपकरण और संघटक माल (अिनवाय2 पंजीकरण हतेु आव6 यकताएं) आदशे जारी �कया था जो 5 िसतंबर, 2018 से लागू �कया गया था और यत:, भारतीय मानक ; यूरो (बीआईएस) सिहत िविभ= न िहतधारक? के साथ चचा2 करने के बाद, उA त आदशे के लागू �कए जाने कB तारीख संलD न अनुसूची म� E येक उE पाद के सामन े�कए गए उ� लेख के अनुसार उ= नत रहगेी। 2. यत:, संलD न अनुसचूी म� उि� लिखत उE पाद? के परीFण के िलए, िलए जाने वाले समय पर िवचार करते Gए एसपीवी मॉIूल के मामले म� िविनमा2ता परीFण को पूरा �कए जाने कB संभािवत तारीख के साथ योगशालाJ को ितदशK (नमून?) के माण सिहत यह L व-माणन L तुत कर सकते हM �क उनके उE पाद संबंिधत भारतीय मानक? अथवा उनके आईईसी ितL थािनय? (उE E ारवतN मानक? सिहत, य�द कोई हो) के अनुOप ह।ै इस कार कB छूट 30 जून, 2018 तक लागू होगी। यह ावधान �कया गया ह ै�क िजस माल के िलए L व-माणन �कया जा रहा ह,ै को पहले ही आईईसी �ारा मािणत �कया गया हो, के मामल ेम� ऊपर खंड 2 के अंतग2त L व-माणन के साथ ितदशK को L तुत करना आव6 यक नहV होगा। ऐसे मामले म�, L व-माणन के िलए आईईसी माण पX और परीFण YरपोटK के साथ सलंD न �कया जाना पया2Z त होगा। आगे यह भी ावधान �कया जाता ह ै�क आयाितत साम[ी, िजसके िलए ऊपर खंड 2 के अनुसार L व-माणन �कया जा रहा ह,ै के मामले म� िविनमा2ता अथवा आयातक �ारा L व-माणन �कया जा सकता ह।ै अनुसूचीअनुसूचीअनुसूचीअनुसूची �.सं. �.सं. �.सं. �.सं. उ�पादउ�पादउ�पादउ�पाद भारतीय मानक भारतीय मानक भारतीय मानक भारतीय मानक स�ंयास�ंयास�ंयास�ंया भारभारभारभारतीय मानक का शीषकतीय मानक का शीषकतीय मानक का शीषकतीय मानक का शीषक काया�वयन क� ितिथकाया�वयन क� ितिथकाया�वयन क� ितिथकाया�वयन क� ितिथ (1)(1)(1)(1) (2)(2)(2)(2) (3)(3)(3)(3) (4)(4)(4)(4) (5)(5)(5)(5) 1. �\Lटलाइन िसिलकॉन टेYर]ायल फोटोवो�टेइक (पीवी) मॉIूल (एसआई वफ़र आधाYरत) आईएस 14286: 2010 �\Lटलाइन िसिलकॉन टेYर]ायल फोटोवो�टेइक (पीवी) मॉIूल- िडजाइन योDयता और अनुमोदन कार 16 अैल 2018

  • 2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]

    �.सं. �.सं. �.सं. �.सं. उ�पादउ�पादउ�पादउ�पाद भारतीय मानक भारतीय मानक भारतीय मानक भारतीय मानक स�ंयास�ंयास�ंयास�ंया भारभारभारभारतीय मानक का शीषकतीय मानक का शीषकतीय मानक का शीषकतीय मानक का शीषक काया�वयन क� ितिथकाया�वयन क� ितिथकाया�वयन क� ितिथकाया�वयन क� ितिथ (1)(1)(1)(1) (2)(2)(2)(2) (3)(3)(3)(3) (4)(4)(4)(4) (5)(5)(5)(5) 2. िथन �फ�म टेYर]ायल फोटोवो�टेइक (पीवी) मॉIूल (ए-एसआई, सीआईजीएस और सीडीटीई) आईएस 16077: 2013 िथन �फ�म टेYर]ायल फोटोवो�टेइक (पीवी) मॉIूल- िडजाइन योDयता और अनुमोदन कार 16 अैल 2018 3. पीवी मॉIूल (एसआई वफ़र और िथन �फ�म) आईएस/ आईईसी 61730 (भाग-1): 2004 आईएस/ आईईसी 61730 (भाग-2): 2004 िनमा2ण के िलए फोटोवोि�टक (पीवी) मॉIूल सुरFा योDयता भाग 1 कB आव6यकताएँ परीFण के िलए फोटोवोि�टक (पीवी) मॉIूल सुरFा योDयता भाग 2 कB आव6यकताएँ

    16 अैल 2018 (अिa परीFण के िबना) 1 जुलाई 2018 (अिa परीFण के साथ) 4. फोटोवोि�टक िवbुत णाली म� उपयोग के िलए िवbुत इ=वट2र आईएस 16221 ह ै(भाग-1): 2016 आईएस 16221 ह ै(भाग-2): 2015 फोटोवोि�टक िवbुत णाली भाग 1- सामा=य आव6यकताJ म� उपयोग के िलए िवbुत क=वट2स2 कB सुरFा फोटोवो�टेइक िवbुत णाली भाग 2 इनवट2र के िलए िवशषे आव6यकताJ म� उपयोग के िलए िवbुत क=वट2स2 कB सुरFा-

    16 अैल,2018 (100 �कलोवाट तक के इ=वट2र के िलए) 1 अAटूबर 2018 (100 �कलोवाट से ऊपर के इनवट2र के िलए) 5. उपयोिगता -इंटरकनेAटेड फोटोवोि�टक इनवट2र आईएस 16169: 2014 उपयोिगता-इंटरकनेAटेड फोटोवो�टेइक इनवट2र के िलए आइलMdडंग रोकथाम के उपाय कB जांच �\या 16 अैल, 2018 (100 �कलोवाट तक इ=वट2र के िलए) 1 अAटूबर 2018 (100 �कलोवाट के ऊपर के इनवट2र के िलए) [फ़ा. स.ं 223/140/2017-आर एंड डी सम= वय] वीण कुमार, अपर सिचव MINISTRY OF NEW AND RENEWABLE ENERGY

    NOTIFICATION

    New Delhi, the 16th April 2018

    S.O. 1602(E).—Whereas the Central Government had issued “Solar Photovoltaics, Systems, Devices and

    Components Goods (Requirements for Compulsory Registration) Order, 2017“ vide S.O 2920 (E) dated 5 September

    2017 with the date of coming into force with effect from 5th

    September 2018. And whereas, having discussions with the

    various stakeholders including the Bureau of Indian Standards (BIS), the date of coming into force of the said Order

    stands advanced as indicated against each product in the Schedule Annexed.

    2. Whereas, considering the time taken for testing of the products mentioned in the Schedule annexed, the

    manufacturers in the case of SPV Module may submit a self-certification that their products conform to the relevant

    Indian Standards or their IEC counterparts (including subsequent Standards, if any) along with proof of submission of

  • ¹Hkkx IIµ[k.M 3(ii)º Hkkjr dk jkti=k % vlk/kj.k 3

    samples to the laboratories with the expected date of completion of testing. Such relaxation shall be applicable till

    30th

    June 2018.

    Provided that submission of samples would not be necessary along with self-certification under Clause 2 above in case

    the material for which self-certification is being done has been already IEC certified. In such a case , it would be

    sufficient for the self certification to be accompanied by the IEC certificate and test reports

    Provided further that in case of imported material for which self-certification is being given as per Clause 2 above, the

    self-certification may be given either by the manufacturer or the importer.

    SCHEDULE

    Sl. No.

    Product

    Indian Standard

    Number

    Title of Indian Standard

    Date of Implementation

    (1) (2) (3) (4) (5)

    1. Crystalline Silicon Terrestrial Photovoltaic

    (PV) modules

    (Si wafer based)

    IS 14286 : 2010

    Crystalline Silicon Terrestrial

    Photovoltaic (PV) modules -

    Design Qualification And Type

    Approval

    16th April 2018

    2. Thin-Film Terrestrial Photovoltaic (PV)

    Modules

    (a-Si, CiGs and CdTe)

    IS 16077 : 2013

    Thin-Film Terrestrial Photovoltaic

    (PV) Modules - Design

    Qualification and Type Approval

    16th April 2018

    3. PV Module (Si wafer and Thin film)

    IS/IEC 61730 (Part

    1) : 2004

    IS/IEC 61730

    (Part 2) : 2004

    Photovoltaic (PV) Module Safety

    Qualification Part 1 Requirements

    for Construction

    Photovoltaic (PV) Module Safety

    Qualification Part 2 Requirements

    for Testing

    16th

    April 2018 (without

    fire test)

    1st July 2018 (with fire

    test)

    4. Power Inverter for use in photovoltaic power

    system

    IS 16221

    (Part 1) : 2016

    IS 16221

    (Part 2) : 2015

    Safety of Power Converters for

    use in Photovoltaic Power

    Systems Part 1- General

    Requirements

    Safety of Power Converters for

    Use in Photovoltaic Power

    Systems Part 2-Particular

    Requirements for Inverters

    16th

    April 2018 (for

    inverters upto and

    including 100 kW)

    1st October 2018 (for

    inverters above 100 kW)

    5. Utility –Interconnected Photovoltaic inverters

    IS 16169 : 2014 Test Procedure of Islanding

    Prevention Measures for Utility-

    Interconnected Photovoltaic

    Inverters

    16th

    April 2018 (for

    inverters upto and

    including 100 kW)

    1st October 2018 (for

    inverters above 100 kW)

    [F. No. 223/140/2017-R&D Coord.]

    PRAVEEN KUMAR, Addl. Secy.

    Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064

    and Published by the Controller of Publications, Delhi-110054.

    2018-04-16T22:25:40+0530RAKESH SUKUL