anurag
TRANSCRIPT
ANURAG SINGH Mobile: 09826824877E – Mail: [email protected]
MIDDLE MANAGEMENT PROFESSIONAL
P R O F I L E S U M M A R Y
Nearly 5 years of experience in power plant; expertise entail:
Maintenance Production Planning General AdministrationInstallation Research & Development Contract ManagementFactory Operations Site Management Resource Deployment
Managed project activities, streamlining processes / procedures to facilitate smooth maintenance process, enhance productivity and cost reduction
Proven success in planning & implementing the preventive, predictive & breakdown maintenance schedules for improving overall reliability and safety of plant equipment & machinery
Well versed with Steel Structural, GA Drawings, Detailed Drawings, Piping GA Drawings, ISO Metric Drawings and P & ID
Proven success in managing operations involving resource planning, materials planning, in-process inspection, team building and co-ordination with the internal departments
Efficient organizer, motivator, team player and a decisive leader with the ability to motivate teams to excel and win
C O R E C O M P E T E N C I E S
Maintenance Managing the functions of troubleshooting and predictive / preventive / condition based maintenance for reducing machinery
downtime to minimum; undertaking various retrofitting works and overhauling of machines; inspecting machines at vendors’ end and at line setup; carrying out regular health check-up of all machinery and equipment
Conducting process audits; reviewing existing processes and re-designing the same for enhancing operational efficacy
Production Planning Overseeing operations right from planning to execution including finalization of specifications, procurement / supply of raw
materials, stage inspections, progress monitoring & manpower planning Planning day-to-day production related activities and allocating work for achieving production target
Project Execution Developing proposals and creating budget; planning for material and cash flow for the completion of work; interfacing between
internal technical teams, internal projects teams, consultants & contractors for requirement capturing, building out specifications & scoping of projects
Monitoring the project to meet committed timelines; ensuring project quality with adherence to EHS standards
W O R K E X P E R I E N C E
Since Oct’14: Doosan Power System India Pvt. Ltd., Kudgi (Bijapur), Karnataka as Planning Engineer-Project Role: Performing gamut of operations pertaining to:
o Office supply bill & MRC bill, development of reports on daily and weekly basiso Cash inflow and outflow statements as well as monthly RA bills
Informing the client for the monthly progressive invoices, variation orders and their approvals Reviewing and assessing:
o Engineering and Procurement status in line with erection sequenceo Sub-contractor bill preparation
Highlights: Reduced downtime by 70% through measures Executed plant expansion / modification / upgradation projects Escalated Overall Operating Efficiency (OEE) by 70% through measures Recognised for increasing in-plant capability by 80% by effective maintenance; was appreciated for the same
Feb’10-Sep’14: Indian Oil Tanking Engineering Projects Limited, Barh (Patna) as Junior Manager – Project Role: Conducted the study of the Technical Bid Document to acknowledge the complete scope and requirements of the contract Implemented the designed construction procedure and inspection test plan for steel structure work as well as interacted and
coordinated with client for its approval Formulated and prepared BOM for all steel bars, sections, plates and other miscellaneous items as anchor fasteners,
machined fasteners, etc. Led the erection and alignment activities of heavy structures as per AFC drawing and the provision of relevant IS code 800 / 801 /
802 / 806 like columns, towers, trusses, gantry girder / rails, offsite pipe racks and internal cable bridge / rack Initiated the erection of Ducting, stack, hopper, transition piece, equipment platforms, ladder, pipe support, grating and handrail Completed the grouting work as per spec and lab test of cube in accordance with the weather temperature condition Interfaced and inspection during shop fabrication / prior to erection / during erection / after erection and installation as per
approved ITP Maintained the necessary engineering records and protocols as per specification and IS codes Executed miscellaneous activities related to site closure – material reconciliation and provided the final documents to client Handled pre - assembly of pressure part of boiler such as ducting, economizer, water wall panel, hot suspension as a
quality part Evaluated GAD, P &I D, Line List, Isometrics and all technical inputs from the client Estimated and prepared the BOM - Pipe Materials, Fittings, Valves, Special Items (Strainer) and Support Materials for the
entire project Performed:
o Punching the clearance & activity of box-upo Welder Qualification Testo Inspection of the Weld Visual, Fit up, Hardness & PMI
E D U C A T I O N
2009 B.E. (Mechanical) R.I.T. (Rishiraj Institute of Technology), Indore, R.G.T.U. University
IT S k i l l s
Expertise in:
o Microsoft Windows XP Professional 2002o MS Office 2007o Internet Applications
P E R S O N A L D E T A I L S
Date of Birth: 22th October 1988Address: 24 / 209 Arjun Nagar, Rewa, M.P., India – 486001Languages Known: English and HindiPassport no: J1415883
Please refer to the annexure for the project details
ANNEXURE
Highlights:
P R O J E C T S H A N D L E D
Title: Super Thermal Power PlantClient: N.T.P.C. Kudgi (Bijapur) Karnataka (3 x 800 MW)EPCC: Doosan Power System India Pvt. LtdPeriod: Oct’14-till now
Title: Super Thermal Power PlantClient: N.T.P.C., Barh, Patna (3 x 660 MW)Consultant: T.P.E.Period: Nov12 – Sep’14
Title: DFCU & AU Projects – Samsung Engineering Constructions LimitedClient: ONGC Petro Additions Limited (OPAL)Consultant: Engineers India LimitedPeriod: Jun’10 – Oct’12
Title: IRUP-EPCC-6B Off-Site Pipe Rack & Utility PipingClient: IOCL - Gujarat RefineryConsultant: Toyo Engineering India LimitedPeriod: Feb’10 – Jun’10
I N D U S T R I A L T R A I N I N G
Title: Production of CementsOrganization: J.P. Cement, Rewa, M.P.Period: 1.5 MonthsDescription: Acquired exposure to manufacturing process of different types of Cement