TRIC Training Log: 05-13-04

Client: West Point SolutionsJob: Dynasty Restaurant, Valco Mall, Santa Clara, CAPull: upstream / 140’ / 6” / SDR17 / replacing 6” C.I.

2004-0513CA.ppt

technical archives

www.trictrenchless.com

We at TRIC Tools have specific requirements for the use and maintenance of our equipment with regard to safety and efficiency on the job. Our written and verbal recommendations coincide with safety regulations set by local, state, and national government agencies. Our

clients may have standards over and above industry regulations. However, the safety equipment, apparel, and operating procedures

demonstrated by our clients in this presentation may or may not comply with above mentioned government regulations.

2004-0513CA.ppt

technical archives

www.trictrenchless.com

When fusing long sections of pipe, keep in mind eventual entry point of bursting head (shown attached to clevis head for demonstration; leave bursting head off while fusing).

2004-0513CA.ppt

technical archives

www.trictrenchless.com

Multiple interior excavations to uncover plumbing connection points. Green dashed line shows path of pull under dining area.

2004-0513CA.ppt

technical archives

www.trictrenchless.com

Path of pull under kitchen.

2004-0513CA.ppt

technical archives

www.trictrenchless.com

Preparing pulling hole.

2004-0513CA.ppt

technical archives

www.trictrenchless.com

Drawing cable upstream to pulling hole with duct rod.

2004-0513CA.ppt

technical archives

www.trictrenchless.com

Moving pipe to entry point.

2004-0513CA.ppt

technical archives

www.trictrenchless.com

The more the merrier!

2004-0513CA.ppt

technical archives

www.trictrenchless.com

Parking lot exit lane is blocked off to facilitate pull.

2004-0513CA.ppt

technical archives

www.trictrenchless.com

140’ ready to go!

2004-0513CA.ppt

technical archives

www.trictrenchless.com

Inching along…

2004-0513CA.ppt

technical archives

www.trictrenchless.com

Breaking out old pipe at pulling end.

2004-0513CA.ppt

technical archives

www.trictrenchless.com

Cribbing soft earth at pulling end. Wood is braced between dirt wall and pressure plate to distribute load.

2004-0513CA.ppt

technical archives

www.trictrenchless.com

When wood is insufficient, steel poles are driven into the ground instead to stabilize pulling equipment.

2004-0513CA.ppt

technical archives

www.trictrenchless.com

Managerial review…

2004-0513CA.ppt

technical archives

www.trictrenchless.com

Unnecessary clutter at entry!

2004-0513CA.ppt

technical archives

www.trictrenchless.com

This is how NOT to start a pull.

Actual entry point

2004-0513CA.ppt

technical archives

www.trictrenchless.com

Get rid of the clutter! Shown here at entry are at least six to eight bands and couplings, including a vertical stack, that will only be dragged into the earth and

become one big obstruction. Band cutting blade attached to bursting head functions only when pipe is part of an undisturbed system that is secured underground.

Actual entry point

2004-0513CA.ppt

technical archives

www.trictrenchless.com

Due diligence…

2004-0513CA.ppt

technical archives

www.trictrenchless.com

Clean entry!

2004-0513CA.ppt

technical archives

www.trictrenchless.com

Removing exposed bands, couplings, and connections in middle open trench…

2004-0513CA.ppt

technical archives

www.trictrenchless.com

…to avoid inevitable “traffic jam” of loose (uncovered) connections being pushed along rather than burst away.

2004-0513CA.ppt

technical archives

www.trictrenchless.com

Remove all exposed pipe, bands, and connections in bursting path. This material will only create problems by cluttering the bursting head.