Seeking challenging and highly motivated assignments in Oil & Gas, Power & Energy projects with an organization to deliver my best experience and upgrade my skills, thereby growing along with the organization.

SYNOPSIS

Over 16 years of experience as Electrical Design Professional in Basic, FEED, Detailed Engineering and EPC projects for various sectors like Power, Oil & Gas, Refinery, Petrochemicals and Chemicals Industry.

Experience of site visit in Power Plant, Electrical Sub-Substation, Defence, onshore oil fields, refinery and chemical plant.

Detail Designing of LV Draw out/Fixed type Switchgear Panel and Bus-Duct. Erection & commissioning of LV Motors, LV Switchgears, LV & HV Cable Laying & Termination in Defense Chemical Plant.

Proficiency in Vendor drawing review, Tender review, Proposal Preparation, Bidding, Cost Estimation & Site Support.

Knowledge of International & Local Standards, codes and Specification likewise Shell DEP, IEC, BS, IEEE, ADCO, GASCO, PDO, QP & EIL.

Experience in implementation of Quality Management System in the organization and ISO Certified Internal Auditor as per ISO 9001: 2008 Standards.

Quick learner having strong problem solving ability and analytical skills. Ability to manage multitask and work on a diverse range of requirements and projects simultaneously. Highly versatile and professional person with good interpersonal qualities and communication skills.

AREAS OF EXPERTISE

Preparation & checking of Installation Standard Drawings as per ADCO/GASCO Standards. Detail Engineering Electrical Layout of Earthing, Power, Lighting, Cable Routing, Hazardous Area and

Equipment room layout. Detailing of Electrical Earthing Cable Block Diagram, Earthing philosophy, Electrical Cable Block Diagram and

Electrical Interconnection Diagram. Preparation & checking of E&I Cable Schedule, Electrical Equipment Schedule, Electrical Junction Box

Schedule, Socket Schedule, List of Electrical & Instrument Tag Plates and Electrical Bulk MTO. Preparation & checking of Instrument Cable Routing Layout, Instrument Location Layout and Fire & Gas

Location Layout. Expertise in Single Line Diagram, General Arrangement drawing, bill of materials and schematic diagram. Designing of MCT (Multi Cable Transit) for Oil & Gas industry.

PROJECTS EXECUTED

1. Project : Interconnection of ADWEC CRS to DEL at TaweelahLocation : Taweelah, Abu Dhabi, UAEClient : Al Asab General Transport & Contracting, Abu DhabiEnd User : GASCO (Abu Dhabi Gas Industries Ltd).Scope : Detail Engineering.Highlights : GASCO engaged Al Asab as EPC Contractor for Interconnection of 36” pipeline from

1 Address: Flat No. 1503, City Tower, Khalifa Street, Near Al Noor Hospital, Abu Dhabi, U.A.E.| Tel. +971 26351095Email: [email protected]| Mob: +971-552399307

Page 2: Krishna Kumar_CV

ADWEC CRS to DEL at Taweelah. Al Asab Awarded this project to PL Engineering forDetail design engineering.

Role : Sr. Designer (Electrical)

2. Project : EPC for replacement of existing Power Skid for Clusters – 40 to 45 Location : Bu Hasa, Abu Dhabi, UAEClient : Matrix Construction, Abu DhabiEnd User : ADCO (Abu Dhabi Company for Onshore Petroleum Operations).Scope : Detail Engineering.Highlights : ADCO engaged Matrix as EPC Contractor to replace 6 existing Power SupplySkids at

Water Injection Clusters 40-45 at Bu-Hasa Field. Matrix Construction awarded thisProject to PL Engineering for detail design engineering.

Role : Sr. Designer (Electrical)

3. Project : Flowline & Wellhead installation in ADCO fields.Location : Bu Hasa, Abu Dhabi, UAEClient : Galfar Engineering & Contracting, Abu DhabiEnd User : ADCO (Abu Dhabi Company for Onshore Petroleum Operations).Scope : Detail Engineering.Highlights : ADCO appointed Galfar Engineering & Contracting as EPC contractor. The Scope

Of work consists of EPC work of wellhead piping and pipeline from wellheads to Manifold area. Total 14 no’s of charismas trees are in Work scope which is sub-divided in six type of wells (Oil Producing, ESP, Water Disposal, Water Injection, WAG & Gas Lift).

Role : Sr. Designer (Electrical)

4. Project : Tie-In Works at South East, Abu DhabiLocation : Asab, Shah & Sahil, Abu Dhabi, U.A.E.Client : ADCO (Abu Dhabi Company for Onshore Petroleum Operations).Scope : EPC.Highlights : The Scope of work consists of EPC work of wellhead piping and pipeline from

Wellheads to manifold area. Total 135 no’s of charismas trees are in Work scope which are sub-divided in six types of wells (Oil Producing, ESP, Water Disposal,Water Injection, PW Re-injection & Gas Lift).

Role : Sr. Designer (E&I)

5. Project : Safe Water Chemicals Upgrade ProjectLocation : Mussafah, Abu Dhabi, U.A.E.Client : AL Kout Industrial Projects Co.Scope : Detail Engineering.Highlights : Upgrade of Safe water Chemicals factory from 20 TPD to 40 TPD Sodium

HydroxideProduction that to be constructed for Al Kout Industrial Projects Co. Located in theIndustrial City of Abu Dhabi (ICAD I), UAE. The new Electrolyser for this project will be provided by Ineous Technologies. PL Engineering is contracted to provide detail engineering services for this Project. The plant will produce Sodium hydroxide(NaOH), Hydrochloric Acid (HCL), Sodium Hypo Chloride (NaOCl).

Role : Sr. Designer (Electrical)

2 Address: Flat No. 1503, City Tower, Khalifa Street, Near Al Noor Hospital, Abu Dhabi, U.A.E.| Tel. +971 26351095Email: [email protected]| Mob: +971-552399307

Page 3: Krishna Kumar_CV

6. Project : OXY MUKHAIZNA PHASE II Projects (EPC)Safe Water Chemicals UpgradeLocation : OmanClient : OCCIDENTAL MUKHAIZNA LLCScope : EPC – Punj Lloyd Ltd, Detail Engineering – Technip, USA, Engineering Co-Ordinator

– PL Engineering Pte Ltd.Highlights : Occidental of Oman operate the Mukhaizna field, the operations at

Mukhaizna Comprise drilling, processing and stabilization of well fluids for Export and steam Generation and steam flooding of the reservoir formations to maximize the oil Recovery from the field. Phase-ll of the field development At Mukhaizna is the Expansion of the facilities to incrementally increase the Water and steam flooding Capacities together with modifications to the Central Processing Facilities (CPF).

1. Water Treatment Plant (WTP) (Lots 1, 2 & 3) Company is planning to expand theWater treatment facilities to treat an additional 390,000 BPD of boiler quality water required to recover 150,000 BPD of oil from its field through the steam injection process technology. The WTP will be divided into 3 Lots as below:

Lot # 1 – 130,000 BWPD Lot # 2 – 140,000 BWPDLot # 3 – 120,000 BWPD

2. Central Processing Facilities (CPF) Upgrades Company is planning work on threeMajor, discrete areas of the process plant as part of this project. These are:

Dehydration UnitDe-Oiling Train 3Balance of Plant

Role : Sr. Designer (Electrical)

7. Project : CONVERSION OF HABSHAN 0 & 1 LEGACY DOCUMENTS TO SPPID AND SPILocation : Habshan, Abu Dhabi, UAEClient : GASCO (Abu Dhabi Gas Industries Ltd.)Scope : Conversion of As-built P&ID into Intergraph Smart Plant P&ID Software.Highlights : In order to improve the documentation infrastructure and cope withThe As

Built best practices, GASCO intends to convert the existing documentation from Micro Station to Smart Plant Enterprise. Conversion of drawing & documents to SPEL, SPPID & SPI. Procurement of software (SPI, SPPID, SPF) and Hardware (servers) Scope of work under this project conversion of Habshan 0, 1, 2 & Bab document to Smart Plant P&ID &Instrumentation. The Project includes development of the data base of these two systems, SPPID & SPI, Along with their deliverables. Number of P&lDs to be converted to SPP&ID – 1400 nos. approx. Number of Instrumentation Drawings tobe converted to SPI- 30,000 nos. approx.

Role : Sr. Designer8. Project : EPC of 500,000 US BBL New Tank #7 at RasLanuf

Location : Tripoly – Libya3 Address: Flat No. 1503, City Tower, Khalifa Street, Near Al Noor Hospital, Abu Dhabi, U.A.E.| Tel. +971 26351095

Email: [email protected]| Mob: +971-552399307

Page 4: Krishna Kumar_CV

Client : VEBA OIL OPERATIONSScope : EPC–Punj Lloyd Ltd, Detail Engineering & Support–PL Engineering Pte Ltd.Highlights : The Scope of work consists of EPC work of Replacement of 500000US Bbl

Floating Roof above ground storage tank number #7. Rresponsible for the Entire CAD works Related to the project. Ensured Cad deliverables are in Line with project drafting Requirements. Had close interaction with all the Discipline designers and rigorous Co-ordination with discipline leads as Well as Engineering Manager. Prepared Drawing Templates (A1 & A3 sizes) for the project as per Client procedures & Standards. Also I prepared SLDfor PMCC & MCC, Lighting calculation, Cable Trench& Tray Layout, Lighting Layout, Power Layout, Earthing Layout, Hazardous Area Layout, Cable Schedule, Lighting & Power panel schedule.

Role : Designer

9. Project : SGTP –STRATEGIC GAS TRANSMISSION PROJECTLocation : Doha, QatarClient : Qatar Petroleum (QP)Scope : EPC-Punjlloyd Ltd, Detail Engineering-NAMA Mott MacDonald, Engineering

Support-PL Engineering Pte Ltd.Highlights : The Scope of work consist of EPC work of 2 nos 36” pipe line from Station-V

(Raslaffan) to Station-S (Mesaieed) through Station-T3. It also Consist of total 4 no’s Section Block Valve station between Station-V to Station-T3 and Total 2 no’s section Block Valve station between Stations – T3 to Station-S. Reviewed, Checked & Verified Drawings / Documents. Worked with CAD Team from design office to fix various mistakes/mismatches detected in Design Consultant (NAMA Mott) drawings& Vendor drawings. Co-ordination between construction team, Vendors &Consultant (NAMA Mott MacDonald), Engineering Team, Project Team & other Disciplines. Helping to the Vendors for fast material delivery at site. Checking of E &I drawings /documents produced by Consultants/Vendors. Preparation of Loop Diagram (Instrument, Fire & Gas) with the help of RTU, DCS, ESD, Fire & Gas wiring Data Base and Cable block diagram, Junction Box Wiring Diagram & Cable schedule. Piping arrangement Layout, Lighting Calculation, MTO and drafting for other Disciplines for Proposals as well as Projects. FAT test at Vendor shop floor for SGTP.

Role : Designer

10. Project : FUEL HYDRANT SYSTEMLocation : Doha, QatarClient : New Doha International Airport (NDIA), Doha, State of QatarPMC : Overseas Bechtel, Inc.Scope : EPC-Punjlloyd Ltd, Detail Engineering-JP Kenny, Engineering Support-PL

EngineeringPte Ltd.Highlights : The Scope of work consist of Fuel Receiving Station with 8 unloading

Bridges forPumping Jet A1 fuel to Storage Tanks, Fuel Farm for Jet A1 Fuel Storage with Hydrant Pump Station, 16km of dual fuel hydrant ring for loading fuel to aircrafts and Ground service equipment (GSE) fuel stations.

Role : Designer (Electrical)

4 Address: Flat No. 1503, City Tower, Khalifa Street, Near Al Noor Hospital, Abu Dhabi, U.A.E.| Tel. +971 26351095Email: [email protected]| Mob: +971-552399307

Page 5: Krishna Kumar_CV

11. Project : Delayed Coker & LPG Merox UnitLocation : Vadodra, Gujrat Client : Indian Oil CorporationScope : EPC-Punjlloyd Ltd, Detail Engineering -PL Engineering Ltd.Highlights : Punjlloyd got LSTK contract for setting up Delayed Coker & LPG merox unit at IOCL,

Vadodra. PL Engineering was responsible for detailed engineering for thisUnit.

Role : Designer (Electrical)

12. Project : MSQ Upgrading Refinery Location : Barauni, Bihar Client : Indian Oil CorporationScope : EPC-Punjlloyd Ltd, Detail Engineering -PL Engineering Ltd.Highlights : Punjlloyd got LSTK contract for setting up Refinery unit at IOCL, Barauni.

PL Engineering was responsible for detailed engineering for this unit.Role : Designer (Electrical)

13. Project : SCADA system Up-gradation.Location : India, Bangladesh & BhutanClient : Power Grid Corporation, TATA Power Ltd.Highlights : Areva T&D Systems India Ltd got LSTK & Engineering contract for setting up SCADA

System at 400kV, 220kV S/S for this unit.Role : Designer (Electrical)

14. Project : Up gradation of Chemical Plant.Location : Nagpur, Maharashtra, India.Client : Defense Research and Development Organization (DRDO).Highlights : Hands on experience of erection & commissioning of switchgear panel, LV&HV cable

laying, street lighting, LV motors. Further O&M of Electrical S/S, Plumbing and fire fighting system.

Role : Supervisor (Electrical)

15. Project : Yash Papers Ltd.Location : Faizabad, Uttar Pradesh, India.Client : Yash Papers Ltd.Highlights : Hands on experience of erection & commissioning of switchgear panel, LV&HV cable

laying, street lighting, LV motors. Further O&M of 2.5MW Thermal Power Plant.Role : Junior Engineer (Electrical)

16. Project : 132kV Substation.Location : Bina, Sonebhadra, Uttar Pradesh, India.Client : Uttar Pradesh Power Corporation Ltd.Highlights : Hands on experience of Operation & Maintenance of 132kV substation.

Maintenance of CT, PT, Power Transformer, Oil Circuit Breaker, SF6, Vacuum Circuit Breaker, Off load and On load isolator & changeover.

Role : Technical Apprentice (Electrical)

CAREER SUMMARY5 Address: Flat No. 1503, City Tower, Khalifa Street, Near Al Noor Hospital, Abu Dhabi, U.A.E.| Tel. +971 26351095

Email: [email protected]| Mob: +971-552399307

Page 6: Krishna Kumar_CV

Company Designation DurationPL Engineering Pte Ltd., Abu Dhabi, U.A.E.(Formerly Simon Carves India A Punj Lloyd Group Company)

Deputy Manager (Electrical) Jan 2008 to till date

Areva T&D Systems India Ltd., Noida, India Designer (Electrical) Sep 2006 to Jan 2008Controls & Switchgear Co. , Noida, India Design Engineer (Electrical) Aug 2005 to Aug 2006Adlec System Pvt. Ltd., New Delhi, India Jr. Engineer Design (Electrical) Aug 2004 to Jul 2005Uttar Pradesh Power Corporation Ltd., India Technical Apprenticeship(Electrical) Mar 2002 to Mar 2003Yash Papers Ltd., Faizabad, U.P., India Jr. Engineer (Electrical) Sep 1999 to Aug 2001

ACHIEVEMENTS & CERTIFICATES

National Cadet Corps “B” Certificate (India). “Certificate of Attendance & Participation” for IEC/IECEx held on 21&22 March-12, Dubai, United Arab

Emirates. “Certificate of Attendance” for ISO 9001: 2008 Quality Management System (Introductory & Internal

Auditor Training) held on 12TH & 13TH October, 2014, Abu Dhabi, United Arab Emirates. Member of http://nmc.toastmastersclubs.org

SOFTWARE SKILLS

Working experience on MS-Office Training on MS-Office 2010 Training on MS-Access Training on MS-Powerpoint SPEED V2.1 (Switchgear Design) Autodesk MEP 2010 (AutoCAD) Lighting Calculation Software Intergraph SPPID-2009 Introduction to PDMS.

EDUCATION

Qualification Institute / Board Score Year

Diploma in Railway Engineering

Institution of Permanent way Engineers (India), Rail Bhawan, New Delhi

53% 2003

Diploma in Electrical Engineering.

Uttar Pradesh Board of Technical Education, Lucknow

77% 1999

12th Grade (Maths Stream) Government Inter College, Pipari, Sonbhadra, Uttar Pradesh

57% 1996

6 Address: Flat No. 1503, City Tower, Khalifa Street, Near Al Noor Hospital, Abu Dhabi, U.A.E.| Tel. +971 26351095Email: [email protected]| Mob: +971-552399307

Page 7: Krishna Kumar_CV

PERSONAL PROFILE

Nationality : IndianDate of Birth : 15-08-1977Maritul Status : MarriedPassport No. & Validity : G4804520, Sep, 2017.Visa Status : U.A.E., Residency Visa, Valid up to Sep, 2016.Languages known : English & Hindi.Total Experience : 16+ YearsPresent Designation : Deputy Manager (Electrical)

DECLARATION

I hereby declare that the information provided is true to my knowledge.

Krishna KumarAbu Dhabi, U.A.E.

Dated: 11 Jan, 2016

7 Address: Flat No. 1503, City Tower, Khalifa Street, Near Al Noor Hospital, Abu Dhabi, U.A.E.| Tel. +971 26351095Email: [email protected]| Mob: +971-552399307