Naveen Kumar Correspondence address # H No 1443, Second Floor, Sector – 45, Gurgaon Haryana – 12006 Ph:+91-9971891268 [email protected] Permanent address Opposite bharat flour Mills, Jagat Nagar, DLU Road, Pathankot, Punjab, India SR. PROJECT PLANNING, SCHEDULING MONITORING AND PIPING MATERIAL CONTROL ENGINEER - OIL AND GAS - 9 YEARS OF RICH EXPERIENCE IN OIL & GAS DOMAIN OBJECTIVE Seeking a challenging opportunity where I will be able to utilize my strong Organizational skill, Technical knowledge, Domain experience and the ability to work well with people, which will allow me to grow personally and professionally. I am self-motivated and able to work both independently and as collaborative team member. My major focus would be to use my leadership quality and managerial skills to obtain a position where I can maximize my organizational, knowledge and interpersonal skills which will not only contribute in my career growth but as well as will take the organization to new heights. Diligent & Result oriented professional having nearly 9 years of experience (since June 2009 to till present with Engineers India Limited, nearly 3 years of experience in Punjlloyd Pvt. Ltd.) and currently spearheading as Sr. Project Control (Planning, Scheduling & Monitoring) and Piping bulk Control engineer with Engineers India Limited at Engineers India Head Office Location. Have been a critical part in creating presentations on Project Planning & PERT / CPM, Project Planning key to success and Construction Planning at NASA (National academy of statistical administration under Ministry of India) training to middle level and higher level management of various clients like ONGC, HPCL, IOCL, GAIL, OIL INDIA & AAI, etc and for Piping material management and allocation to Contractors. PROJECTS UNDERTAKEN SUMMARY: IN ENGINEERS INDIA LIMITED 1. Project Title (Current Project) Polymer Derivative Petrochemical Project (Phase–1) Client Bharat Petroleum Co Ltd.

Upload: naveen-kumar

Post on 11-Apr-2017

194 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: CV-NAVEEN-KUMAR-BECH

Naveen Kumar

Correspondence address# H No 1443, Second Floor,Sector – 45, GurgaonHaryana – 12006

Ph:[email protected]

Permanent address Opposite bharat flour Mills, Jagat Nagar,DLU Road, Pathankot, Punjab, India

SR. PROJECT PLANNING, SCHEDULING MONITORING AND PIPING MATERIAL CONTROL ENGINEER - OIL AND GAS - 9 YEARS OF RICH EXPERIENCE IN OIL & GAS DOMAIN

OBJECTIVE

Seeking a challenging opportunity where I will be able to utilize my strong Organizational skill, Technical knowledge, Domain experience and the ability to work well with people, which will allow me to grow personally and professionally. I am self-motivated and able to work both independently and as collaborative team member. My major focus would be to use my leadership quality and managerial skills to obtain a position where I can maximize my organizational, knowledge and interpersonal skills which will not only contribute in my career growth but as well as will take the organization to new heights.

Diligent & Result oriented professional having nearly 9 years of experience (since June 2009 to till present with Engineers India Limited, nearly 3 years of experience in Punjlloyd Pvt. Ltd.) and currently spearheading as Sr. Project Control (Planning, Scheduling & Monitoring) and Piping bulk Control engineer with Engineers India Limited at Engineers India Head Office Location.

Have been a critical part in creating presentations on Project Planning & PERT / CPM, Project Planning key to success and Construction Planning at NASA (National academy of statistical administration under Ministry of India) training to middle level and higher level management of various clients like ONGC, HPCL, IOCL, GAIL, OIL INDIA & AAI, etc and for Piping material management and allocation to Contractors.

PROJECTS UNDERTAKEN SUMMARY: IN ENGINEERS INDIA LIMITED

1. Project Title (Current Project) Polymer Derivative Petrochemical Project (Phase–1)Client Bharat Petroleum Co Ltd. EPCM Engineers India Limited Units Acrylate Unit, Oxo-Alchohal and Acrylic Acid UnitUtilities Raw water , service water, DM Water, Cooling water,

Chilling water, Plant Air, Inst Air, Steam, Flare, etcDuration Since Feb 2015 till present Role Sr. Project Control engineer (Team 3 members) Summary of experience Monthly Progress Reports, Participation in Review meetings. Identification of critical equipments and long lead items for ordering. Participation in Kick-Off meeting between EIL and client and study the overall plot plan

and issues pertaining to transportation of equipments storage facilities available at site

Page 2: CV-NAVEEN-KUMAR-BECH

and survey of the pipe rack for the facilities to be brought form existing refinery for the PDP project from existing refinery.

Preparation of 90 days activities and follow up with Projects for the deliverable. Preparation of overall progress measurement system and implement the same for the

progress calculation. Review the Licensor’s documents schedule and keep updating the w.r.t actual receipt of

the documents. Preparation and issuance 2-3 weeks look ahead plan for various discipline Preparation and issuance of L1 schedule for Phase – 1 activity.

2. Project Title (Current Project) IREP Kochin, Integral Refinery Expansion Project(Expansion from 9MMTPA to 15MMTPA)

Client Bharat Petroleum Co Ltd. EPCM Engineers India Limited Units CDU / VDU, DHDT, VGO, FCCU, DCU / CFU Utilities Raw water , service water, DM Water, SWS, ARU,

Cooling water, Plant Air, Inst Air, VHP Steam, HP Steam, LP Steam, Flare, Stripped Sour Water etc

Duration Since Sep 2014 till present Role Sr. Project Control engineer (Team 6 members) Summary of experience Preparation / Compilation and issuance of Monthly Progress report. Regular updation of progress of various functions of a Project like Engineering, Detailed

engineering, Ordering, Manufacturing & Delivery, Construction Progress reports and driving the overall physical progress of Project.

Independently responsible for Material Tracking for Piping Bulk, Instrumentation Items, Electrical Items.

Regular follow up with Projects, C&P and Engineering for release and issuance of MRs so as to get the material on time and to generate sufficient work front to the working agency.

Follow up for the RFQ, PBO Recommendations, Award recommendations, award of Order and for release of PR.

Follow up with Engineering and other departments for inputs to release NIT and regular updation of Bids status and report to management.

Regular checks on the MRs quantities and issue status report so that no item is left behind for ordering.

Follow up with engineering for release of drawings providing schedule release dates for drawings based on actual site conditions and award of contract.

Preparation of executive summary of Construction activities and to find the factor affecting progress and bring to management notice through regular reporting.

Issuance of exception reports for material status. Regular updation of Material Status report and take corrective actions for the material

delivery part. Preparation of presentations for review meetings. Compilation and status update for drawings and material hold ups and respond to site. Preparation and issuance of system wise and Line wise early commissioning of CDU

schedule along with the instruments required and the electrical items required and involved in early commissioning including the status of Utility packages and requirement of Integrated refinery expansion project, BPCL-KR.

Page 3: CV-NAVEEN-KUMAR-BECH

Follow-up with Projects and inspection and issue vendor wise balance material status and updated the status and getting the status and highlighting the criticality of the same to projects for early delivery.

3. Project Name (Last Project) Brahmaputra Cracker & Polymer Project (Grass root) Client Brahmaputra cracker & Polymer LimitedEPCM Engineers India LimitedUnits Gas processing Unit, C2+ Recovery Unit

Ethylene Cracker UnitLLDPE / HDPEPolypropylene UnitGDU, GSU (Other Locations) conversion of existing LPG plant to Gas sweetening Unit.

Utilities Raw water , service water, DM Water, Cooling water, N2, Plant Air, Inst Air, VHP Steam, HP Steam, LP Steam, Flare etc.

Consultant Engineers India Limited (EPMC)Duration Since June 2009 – Sep 2014Role Sr. Project Control engineer (Team 6 members) Summary of other experiences Finalization and issuance for implementation, WBS for overall Construction activities with

overall scope of works. Finalization and implementation of detailed Construction Schedule. Evaluating critical activities of the project and taking active part in discussions for

resolution. Preparation and issuance of detailed construction schedules with “S” curve (L4) for

implementation for site grading, Piling, Civil and structural, Mechanical including insulation and painting, Electrical & instrumentation works. Calculating & analyzing weighted values in schedules for construction activities along with detailed resource mobilization plan (Manpower / Machinery).

Review the Tendering, Ordering and Manufacturing and Construction Progress reports and prepare the exception reports of LSTK vendor and generate the exception reports after studying the equipment layouts and PFDs.

Issuance of exception reports (fortnightly) for construction activities. Preparation and issuance of Monthly, Weekly Program to the contactors and locating

available front to get the desired progress including resource mobilization required to achieve the program.

Independently responsible for issuance of Monthly construction progress reports along with overall construction progress.

Independently responsible for issuance of Weekly construction progress reports along with overall construction progress.

Responsible for monitoring of Construction Shutdown schedule on daily basis and issue of reports.

Responsible for the generation of Piping material exception reports (shortage report and follow up with inspection).

Responsible for issuance of piping bulk material on basis of issued GA drawings / isometrics and actual release of site front from civil & structural agency for equipment / piping erection so as to generate a sequential front for the mechanical agency and subsequently for electrical and instrumentation contractors.

Page 4: CV-NAVEEN-KUMAR-BECH

Identification of system wise / loop wise piping material shortage report and Preparation of Piping MTO based on latest P & IDs and ISOs. Ordering of Piping Bulk Material (Crash Purchase).

Identification of piping material for Shut Down work and arrange the same in Pre-shut down duration and identification of activities and sequencing activities to be taken up during pre-shut down.

Issuance of exception reports (fortnightly) for Unit wise equipment status. Developed and implemented Microsoft excel sheet for the total equipment status report at

site. Identification of critical equipments / long lead equipments from commissioning point of view and regular chase for the delivery of the same.

Responsible for generating Weekly exception reports for construction backlog against programmed progress.

Compilation of data for knowledge sharing and future use (like Productivity data from Civil and structural works, piping works and other electrical and instrumentation works).

Active participation in weekly and monthly review meetings between Client, EPCM & working agency and address the management about area of concern and providing action plan.

Fortnightly generating engineering hold up reports. Coordinating between head office and site for documentation and drawings issuance. Fortnightly generating shortage reports for Piping Bulk Material based MTO / Site

requirement after analyzing actual piping material requirement as per P&IDs isometrics, GA drawings, modification and to see possible substitutions and balance decision on procurement of material.

Independently responsible for making Presentations for Project Review Meetings and presenting status in front of Client, Consultant & Working agencies with areas of concern and action plans.

Independently responsible for presenting Project outlook to Ministry / Client after proper study of productivity data, balance works etc.

Preparing financial outlook of the project based on the present invoice and work trend for all the contractors.

Preparation of EVM reports. Preparation of exception reports like readiness of substations required for commissioning

and prioritizing the Civil, Mechanical, Electrical &Instrumentation works accordingly. Preparation and presenting commissioning schedule v/s construction status to

management. Testing and implementation of CPS (Construction Planning System – EIL in house tools)

through CITRIX at construction site. Testing and implementation of web based COSMAS (computerized online system for

material allocation at site – EIL in house tool for piping bulk material allocation) at construction site.

Basic knowledge on Captive Power Plant (GTG – 2nos, HRSGs– 2nos, STG – 1 No & Utility boilers – 2nos).

Basic knowledge on Raw Water Treatment Plant. Basic knowledge on DM Plant. Basic knowledge on Nitrogen/Plant Air/Instrumentation Air Plant. Basic knowledge on Cooling Towers (Induced draft). Basic knowledge on Interconnectivity of utilities (RW, SW, FG, FL, DM, SVH, LP, MP, HP,

WCS, WCR, AI, PA, N2, BD, BFW, Process & storage facilitates (Spheres & Tanks) with units.

Page 5: CV-NAVEEN-KUMAR-BECH

Basic knowledge on Gas Processing Unit and C2+ recovery unit. Basic knowledge on Gas Cracking Unit. Basic knowledge on SRT VI cracking furnace. Basic knowledge on Linear Low Density Polyethylene/ High Density Polyethylene Plant. Basic knowledge on Polypropylene Plant. Basic knowledge on Piping Material (Pipes, fittings, Flanges, Valves, spring supports,

strainers, sight glass, MOVs and steam manifolds etc). Good knowledge of Plant equipments and there working.

4. Summary of other experiences Study and Prepare Proposal Schedule for REVAMP of FCCU IOCL Refinery Gujarat, India Study and preparation of proposal schedule for HPCL Vishakh refinery for capacity

enhancement from 6.0 MMTPA to 9 MMTPA with CDU / VDU, HGU, HCU, SDA, SHDA and associated utilities facilities like Cooling tower, ETP, N2/IA/IP Plant as new units and Revamp of ARU / PRU, DHDT, NHT/CCR (FOA received by EIL for Phase – I)

Preparation of proposal schedule with WBS for Ammonia, Urea Plant for Ramagundam proposed for NFL – EIL Joint venture and issuance of Planning, Scheduling and Monitoring Procedure and Progress Measurement system.

Other Misc works for PMO (Like making micro Level schedules etc for projects Reviewed by Higher Management and updating weekly status.

PROJECTS UNDERTAKEN SUMMARY: IN KAEFER PUNJLLOYD PVT. LTD.

5. Project Name Double Wall Storage Tanks for Naphtha Cracker Project, Panipat

Client IOCL Refinery Consultant Engineers India Limited (EPMC)Contractor Punj Lloyd Pvt LtdDuration December 2006 to May 2009 Role Lead Project Control Engineer

6. Project Name Hot and Cold Insulation Works for Piping andEquipments at Naphtha Cracker Project, Panipat

Client IOCL Refinery – EPCC 1 Consultant TOYO engineering Contractor Punj Lloyd Pvt LtdDuration December 2006 to May 2009 Role Lead Project Control Engineer (Independently)

7. Project Name Hot and Cold Insulation Works for Piping and Equipments at Naphtha Cracker Project, Panipat

Client IOCL Refinery – EPCC 8Consultant Engineers India Limited Contractor Punj Lloyd Pvt LtdDuration December 2006 to May 2009 Role Lead Project Control Engineer (Independently)

8. Project Name Design and execution Cryogenic Insulation of PipingClient NPCIL Kudangulam Contractor Punj Lloyd through Larson & turbo

Page 6: CV-NAVEEN-KUMAR-BECH

Duration December 2006 to May 2009 Role Lead Project Control Engineer (Independently)

9. Project Name Cryogenic Insulation of Piping and cold insulation of Storage tanks

Client Devan’s Modern Breweries Contractor Punj LloydDuration December 2006 to May 2009 Role Lead Project Control Engineer

TECHNICAL SKILLS

Expertise knowledge in MS office (Word, Excel, PPT etc). Knowledge of working on Citrix. Project Management tools Primavera, MS Project, Microsoft Office

Construction Planning System (EIL In-house tool) Design Tools PRO-E Wildfire 2.1 & CATIA. Material Handling Tool COSMAS (EIL In-house tool)

EDUCATION Bachelor of engineering in Mechanical Engineering from Thapar institute of Engineering &

Technology Senior secondary from Punjab Board. Matriculation from HP board.

RELEVANT COURSES PERT / CPM Attended training on General civil, structural, piping, equipments etc. Working of steam turbines, Gas turbines. Normal distribution curves Quality Control and Six-sigma Power plant engineering Organizational behavior

SIGNIFICANT PROJECTS DURING ENGINEERING STUDIES Detailed study on Quality control system. Detailed study on Impact of water jets on turbine and worked in the laboratory. Detailed study on design of gearing system of ALH (advanced Light helicopter). Study on Power plant engineering.

PERSONNEL INFORMATION

Full Name : Naveen KumarDate of birth : 24-02-1984Nationality : Indian

Page 7: CV-NAVEEN-KUMAR-BECH

Passport Number : G2787202Education : B.E Mechanical University : Thapar University, Patiala, PunjabCurrent Location : Delhi NCRCurrent Employer : Engineers India LimitedCurrent Salary : 17,00,000 INRNotice Period : One MonthTotal Experience in Oil & Gas : 9 YearsContact Details (Phone / e-mail) : +91 -9971891268 / [email protected]

References

S no

Reference Name Contact details

1. Mr. A K Tandon, Retired General Manager (Construction) – Engineers India Limited

[email protected]

2. Mr. T K Sen, General Manager (Construction In charge), Engineers India Limited

[email protected]

3. Mr. V Manivannan, Dy. General Manager (Construction) – Engineers India Limited

[email protected]

4. Mr. Avdhesh Rana (Project Control – ADNOC) [email protected]. Mr. K Shivaji ( Sr. Manager (Projects) – Engineers India Limited [email protected]. Mr. S J Nair (Asst. General Manager (Project Control [email protected],

[email protected]. Mr. R K Das, Retired Executive Director (Construction)

– Engineers India Limited)-

8. Mr. G Bhalla, General Manager (Engineers India Limited)

I hereby declare that the above mentioned information is correct up to best of my knowledge and I bear the responsibility for the correctness of the above mentioned particulars.

Naveen Kumar