    Role of Services Coordination

    Integration of MEP systems into the architectural andstructural envelope.

    Coordinate with the client and consultant for various details.

    Selection of suppliers

    Installation and procurement scheduling for MEP systems

    Tracking and formalizing procedures for submittals

  • 8/9/2019 Aes Delhi Services 2009

    2/21

    TAXE S & DU TIE S

    Service tax, Labor cess or any other statutory cess and ESI was paid by AES.The Services contractor bore all other taxes, levies, duties andassessments .

    P AYMENT S TE R M S & CO N D ITI O N S

    10% Mobilization advance against B.G. in favour of AES .70% Against Material Supply.15% Against mechanical completion on pro-rata basis.5% Against complete commissioning of the system.5% Performance bank guarantee valid till DLP Should be

    submitted at the time of start of work to AES.

  • 8/9/2019 Aes Delhi Services 2009

    3/21

    G reen Building

    Green Building involves design and construction practices thatsignificantly reduce or eliminate the negative impact of

    buildings on the environment and occupants in five broadareas:

    1 Sustainable site planning2 Safeguarding water and water efficiency3 Energy efficiency and renewable energy4 Conservation of materials and resources5 Improving Indoor environmental quality

  • 8/9/2019 Aes Delhi Services 2009

    4/21

  • 8/9/2019 Aes Delhi Services 2009

    5/21

    Rs. 0.00

    Rs. 2,000,000.00

    Rs. 4,000,000.00

    Rs. 6,000,000.00

    Rs. 8,000,000.00

    Rs. 10,000,000.00

    Rs. 12,000,000.00

    Rs. 14,000,000.00

    Rs. 16,000,000.00

    Rs. 18,000,000.00

    Rs. 20,000,000.00

    Electrical Fire fighting Plumbing HVAC BMS Lift R.O. SystemInsulationGas generator

    Rs. 12,311,700.00

    Rs. 2,424,708.00

    Rs. 6,640,535.00

    Rs. 18,961,344.00

    Rs. 1,967,900.00

    Rs. 2,453,074.00

    Rs. 3,000,000.00

    Rs. 3,597,846.00

    Rs. 14,283,000.00

    Rs. 16,177,804.00

    Rs. 2,381,290.00

    Rs. 9,096,454.00

    Rs. 19,513,647.00

    Rs. 2,020,431.00

    Rs. 2,453,074.00

    Rs. 2,566,630.00

    Rs. 3,395,807.00

    Rs. 14,149,126.00

    Contract Amount original

    Contract Amount revised

    Scope of Work

  • 8/9/2019 Aes Delhi Services 2009

    6/21

    Ty pes of Services

  • 8/9/2019 Aes Delhi Services 2009

    7/21

    HV A C ( H eating V entilating and A ir Conditioning)

    HVAC is an initialism or acronym that standsfor "heating, ventilating, and air conditioning".

  • 8/9/2019 Aes Delhi Services 2009

    8/21

    HV A C ( H eating V entilating and A ir Conditioning)

    Schematic Diagram of HV A C S y stem

  • 8/9/2019 Aes Delhi Services 2009

    9/21

  • 8/9/2019 Aes Delhi Services 2009

    10/21

    Cooling Tower

    Capacity: Suitable for 310 TRWater Flow Rate: 1408 USGPMCondenser Water In 100 oFCondenser Water Out 90 oF

    Water Pumps

    Primary CHW Pump 15 HPSecondary CHW Pump 20 HPCondenser Water Pump 20 HP

  • 8/9/2019 Aes Delhi Services 2009

    11/21

    Complete Room Conditioning S y stem

  • 8/9/2019 Aes Delhi Services 2009

    12/21

    Sequence of HV A C Work Equipment Installation

    VAMInstallation

    TFAinstallation

    Pr ima ry, seconda ry and condense r pump installation

    Cooling Towe r Installation

    Air Washe r

  • 8/9/2019 Aes Delhi Services 2009

    13/21

    Sequence of HV A C Work FCU installation Chilled wate r pipe line installation Hydr o p r essu r e testing of chilled wate r pipe line Duct installation and silicon filling Smoke testing of duct

    Insulation of Duct and chilled wate r pipe lines

    Aluminium Cladding of Chilled wate r pipe lines( Inside the Building) Cement Cladding of chilled wate r pipe lines (at te rr ace) Valves fitting fo r: CHW pumps Condense r wate r pump Cooling towe r

    FCU Coppe r fitting FCU Canvass connection FCU P lenum fixing Dr ain installation and insulation

  • 8/9/2019 Aes Delhi Services 2009

    14/21

    Observations made at the time of installation

    W ooden Support should not be above FCU.

    Supports should be at proper distance.

    Strainer Valve should be properly aligned otherwise itwould not filter the CH W pipe line water which mightcause blockage in FCU.

    Valve should be fitted inside the tray.

    Tapping from main header line should have proper spaceto carry out the insulation work.

  • 8/9/2019 Aes Delhi Services 2009

    15/21

    B M S (Building M anagement S y stem)

    Building management system is a tool that isused to monitor and control variousmechanical systems and/or electrical systemsin a building .

  • 8/9/2019 Aes Delhi Services 2009

    16/21

    Field Devices (Sensors) For BMS:

    Temperature Sensors

    Air Differential Pressure Switch for Filter status (TFA)

    Tank Level Sensor (Plantroom)

    Cooling Tower Tank Level Sensor (Terrace)

    Oil Tank Level Sensor (Plantroom)

    Occupancy Sensor

    Chilled Water Flow Meter Sensor (Plantroom)

    Components in B M S s y stem

    Duct Temperature Sensor (All Rooms)

    Valve actuators

    Immersion Temperature Sensor (CHW& CDSW Temp.)

    Damper actuators

    Duct Temperature & RH Sensor (TFA)

    Outside Air Temperature & RH Sensor

    Air Differential Pressure Switch for Run status (TFA)

  • 8/9/2019 Aes Delhi Services 2009

    17/21

    Supervisory Level:

    NAE SupervisoryController ADS Software (UI)

    Components in B M S s y stem F ield Level Controllers:

    RCU (Room control Unit) DDC Controllers

    MIG Controller(Plantroom)

  • 8/9/2019 Aes Delhi Services 2009

    18/21

    Components in B M S s y stem

    Fire Alarm SystemFire Alarm Panel (BMS Room)

    Fire Detector Multicriteria (Rooms)

    Fire Detector Photo electric (Rooms)

    Control Module (Lobby area)

    Monitor Module (Flow switch)

    Hooter with Horn/Strobe (Lobby area)

    Manual Call Point Lobb area

    Public Address SystemSpeakers (All Rooms)

    DVC Digital Voice Command(Fire Panel, BMS Room)

    DAA Digital Audio Amplifier (Fire Panel, BMS Room)

  • 8/9/2019 Aes Delhi Services 2009

    19/21

    B M S (Building M anagement S y stem)

  • 8/9/2019 Aes Delhi Services 2009

    20/21

    B M S S y stem A rchitecture

    DDCController - 1

    DDCController - 2

    DDCController - x

    NAEControllerBMS PC with

    ADS Software

    Legend:

    N 2 communication Bus(3core X 1.5 sq.mm. Cable)

    Controller to PC connectivityThro TCP/IP protocolDDCController - 3

    DDCController - 4

    F ield sensors F ield sensorsF ield sensors F ield sensors

    F ield sensors

    M IG - 1