aes delhi civil 2009
TRANSCRIPT
-
8/9/2019 Aes Delhi Civil 2009
1/107
American Embassy
School ,
Chanakyapuri, New Delhi
Presentation on:
-
8/9/2019 Aes Delhi Civil 2009
2/107
Chanakyapuri, New Delhi
11
SHIVALIKA ANAND
DEEPENDRA VIKRAM SINGHSHUBHAM ASTHANA
CIVIL
GROUP
AMITESH GOTHANIADEEPAK MITTAL
SERVICES
GROUP
PRATHIBHA PATHAK
-
8/9/2019 Aes Delhi Civil 2009
3/107
Safe man hoursSafe man hours
-
8/9/2019 Aes Delhi Civil 2009
4/107
MEASURES TAKENMEASURES TAKEN TOTO
MAINTAIN 100% SAFETY ONMAINTAIN 100% SAFETY ON
SITESITE
-
8/9/2019 Aes Delhi Civil 2009
5/107
DAILY TOOL BOX MEETINGDAILY TOOL BOX MEETING
-
8/9/2019 Aes Delhi Civil 2009
6/107
FIRE DRILL PROGRAMMEFIRE DRILL PROGRAMME
-
8/9/2019 Aes Delhi Civil 2009
7/107
SAFETY BANNERS
-
8/9/2019 Aes Delhi Civil 2009
8/107
SITE BARRICADING
-
8/9/2019 Aes Delhi Civil 2009
9/107
Monthly Labour DeploymentMonthly Labour Deployment (in(in MMandays)andays)
-
8/9/2019 Aes Delhi Civil 2009
10/107
The GoalThe Goal
-
8/9/2019 Aes Delhi Civil 2009
11/107
-
8/9/2019 Aes Delhi Civil 2009
12/107
Where we are on the face of the earthWhere we are on the face of the earth
-
8/9/2019 Aes Delhi Civil 2009
13/107
-
8/9/2019 Aes Delhi Civil 2009
14/107
-
8/9/2019 Aes Delhi Civil 2009
15/107
-
8/9/2019 Aes Delhi Civil 2009
16/107
-
8/9/2019 Aes Delhi Civil 2009
17/107
-
8/9/2019 Aes Delhi Civil 2009
18/107
-
8/9/2019 Aes Delhi Civil 2009
19/107
LOCATION
-
8/9/2019 Aes Delhi Civil 2009
20/107
LOCATION
Greece Embassy
Qatar Embassy
AES 2
American Embassy
Saudi
Embassy
Spine & Ortho hospital
Sultanate oman
Building 1
Palastine Embassy
Building 2 Building 3
Ch
an
dr
ag
up
t
M
arg
-
8/9/2019 Aes Delhi Civil 2009
21/107
Shape of the
Structure
SALIENT FEATURESSALIENT FEATURESlCivil works including finishes
(10.55 crore)
lServices Co-ordination (87.8 lakhs)
l
lBasement + LGF + G + 2(Structure)
l
lBuilt up Area 40,000.00 Sqft
lContract Duration 12 Months
l
l
l
l
Octagonal Building with acourtyard in the centre
l
l
l
l
-
8/9/2019 Aes Delhi Civil 2009
22/107
Key Playersv Owners American Embassy School
v
v Architects John Derik Arcop Associates Pvt. Ltd.
v
v Structural Consultants DESMAN
v
v Services consultants Sanelac Consultants Pvt. Ltd.
v
v Contractors Shapoorji Pallonji & co. Ltd.
v
-
8/9/2019 Aes Delhi Civil 2009
23/107
-
8/9/2019 Aes Delhi Civil 2009
24/107
CONDITIONSv Type of contract Item rate contract
vMobilization Advance 15% of CV in single installmentv
v Performance Security 5% of CV valid for not less than 12months from the date of acceptance
of work by AESv
v Liquidated damages 0.5% of CV per week to a maximumof 5% of CV
v
vDefect Liability Period 12 months
v Escalation Clause Not applicable
vWater and Electricity By the client
v
-
8/9/2019 Aes Delhi Civil 2009
25/107
MAJOR WORKSv Earthwork - 2655 cu.m
v Filling - 1500 cu.m
v Shuttering - 10000 sq.m
vReinforcement - 305 MT
vConcreting - 2300 cu.m
vMasonry - 400 cu.m
v Plaster - 9500 sq.m
v Terrazo Tiles - 3300 sq.m
vKota stone - 1500 sq.m
vCeramic Tiles - 1150 sq.m
-
8/9/2019 Aes Delhi Civil 2009
26/107
MAJOR WORKSv
vDQ Stone Cladding - 430 sqm
vGrit Wash - 600 sqm
v Painting - 8800 sqm
v Structural Steel - 7 MT
v False Ceiling
Gypsum Board - 1736 sqm
Grid Ceiling - 1076 sqm
vAluminium Work - 60 Lacs
vRoad Work - 6 Lacs
-
8/9/2019 Aes Delhi Civil 2009
27/107
SPCL entersAmerican Embassy
School premises on 24th July 2007
-
8/9/2019 Aes Delhi Civil 2009
28/107
Site as handed over toSPCL
-
8/9/2019 Aes Delhi Civil 2009
29/107
SITE TERRAIN
-
8/9/2019 Aes Delhi Civil 2009
30/107
MOBILIZATION OF THE
SITE
-
8/9/2019 Aes Delhi Civil 2009
31/107
MATERIALSMATERIALSA)Restricted timings for heavy vehicular movement
B)
C)Approvals/Permissions from authoritiesmandatory for vehicular movement.
D)E)Time restrictions for working during school hours
F)
G)Minimum movement of macinery due to lack ofspace
v
-
8/9/2019 Aes Delhi Civil 2009
32/107
Storage onStorage on
SiteSite
Cement Store Main Store
Aggregate Bins Shuttering store
-
8/9/2019 Aes Delhi Civil 2009
33/107
-
8/9/2019 Aes Delhi Civil 2009
34/107
305 MT of Steel Unloaded, Shifted and Stacked manually
within 5 days
-
8/9/2019 Aes Delhi Civil 2009
35/107
LABOURLABOURv
No labour camp on site due to spaceconstraint.
Local labour deployed
Rooms hired for transit labour
Arrangement of accommodation put into thescope of PRWs/Sub-contractors.
v
-
8/9/2019 Aes Delhi Civil 2009
36/107
FACILITIES FOR LABOUR ON SITEFACILITIES FOR LABOUR ON SITE
Toilets
l
Water tank
Canteen
Cold water fordrinking
E)
-
8/9/2019 Aes Delhi Civil 2009
37/107
MACHINERYE)F) Air compressor - 1 No
G) Builder hoist - 1 No
H) Bar cutting m/c - 1 No
I) Bar Bending m/c - 1 No
J) RM 800 concrete mixer - 1 No
K) Mono block pump - 6 Nos
L) Mini pump - 1 No
M)Electric vibrator - 4 NosN) M S Cutter m/c - 2 Nos
O) Hand Grinder - 2 Nos
P) Hammer drill m/c - 1 No
Q) Chipping m/c - 1 No
R) Circular Saw m/c - 1 No
S) Petrol Vibrator - 2 Nos
T) Hand drill m/c - 2 Nos
U)
V
-
8/9/2019 Aes Delhi Civil 2009
38/107
THE TEAM
CIVIL TEAM SERVICES TEAM
-
8/9/2019 Aes Delhi Civil 2009
39/107
Structure Er.
BEST EMPLOYEE
2008
Coordinator
MK Dubey
Stanley Unni
Project incharge
Finishing Er.
Site ErBillingEr.
PlanningEr.
ElectricianMechanic
QualityEr.
First Aider
Safety
Supervisor Supervisor
P & M
StoreJohn
Thomas
Coordinator
ImrozKhan
TejvirDeshwal
Incharge
MechanicalEr.
ElectricalEr.
-
8/9/2019 Aes Delhi Civil 2009
40/107
-
8/9/2019 Aes Delhi Civil 2009
41/107
EXCAVATIONQUANTITY EXEUTED
Rocky terrian area.
-
8/9/2019 Aes Delhi Civil 2009
42/107
-
8/9/2019 Aes Delhi Civil 2009
43/107
-
8/9/2019 Aes Delhi Civil 2009
44/107
DIFFERENT MACHINESDIFFERENT MACHINES
DEPLOYED FORDEPLOYED FOREXCAVATIONEXCAVATION
BUCKET EXCAVATOR
-
8/9/2019 Aes Delhi Civil 2009
45/107
JACK HAMMER
FISSURES BEING CREATED MAN
BUCKET EXCAVATOR
ROCK BREAKER
-
8/9/2019 Aes Delhi Civil 2009
46/107
TRACTOR MOUNTED ROCK BREAKER
-
8/9/2019 Aes Delhi Civil 2009
47/107
ShutteringShutteringv
v
v Total Qty. executed
v
v Total Material Procured
v
v
v
12293 sqm
v
2590 sqm.
v
v
v
v
-
8/9/2019 Aes Delhi Civil 2009
48/107
Shuttering done on 3 levelsShuttering done on 3 levels
simultaneouslysimultaneously
-
8/9/2019 Aes Delhi Civil 2009
49/107
Chamfer strips used along with
-
8/9/2019 Aes Delhi Civil 2009
50/107
25
mm
Shutteri
ng
boa
rdShu
tteri
ngboa
rd
C
ha
m
fe
r
C a e st ps used a o g w tshutter boards
-
8/9/2019 Aes Delhi Civil 2009
51/107
Columns with chamfered edgesColumns with chamfered edges
-
8/9/2019 Aes Delhi Civil 2009
52/107
Initial material procured 1444 sqm
Material consumed 580 sqm.
Material could not beshifted
-
8/9/2019 Aes Delhi Civil 2009
53/107
v
v
v Film faced ply is brittle in nature. The layers tend
to separate away from each other if nailed. Hence
screwing can be adopted in place of nailing.v
v Prevention of water intrusion by applying fevicol or otherwater repelling agent on the edges.
v
Suggestions to increaseSuggestions to increase
repetitionsrepetitions
-
8/9/2019 Aes Delhi Civil 2009
54/107
-
8/9/2019 Aes Delhi Civil 2009
55/107
-
8/9/2019 Aes Delhi Civil 2009
56/107
-
8/9/2019 Aes Delhi Civil 2009
57/107
-
8/9/2019 Aes Delhi Civil 2009
58/107
Cumulative Concreting in cumCumulative Concreting in cum
-
8/9/2019 Aes Delhi Civil 2009
59/107
FINISHINGFINISHING
-
8/9/2019 Aes Delhi Civil 2009
60/107
TERRAZO FLOORINGTERRAZO FLOORING
(NITCO)(NITCO)
-
8/9/2019 Aes Delhi Civil 2009
61/107
SpecificationsSpecifications
Size - 300*300*25mm Unpolished,Precast Terrazo tiles
Laid over 20mm average thick bedof cement mortar 1:4
Grouting of joints
-
8/9/2019 Aes Delhi Civil 2009
62/107
-
8/9/2019 Aes Delhi Civil 2009
63/107
GRINDING OFGRINDING OF
TILESTILES
CLEANING OFCLEANING OFTILESTILES
QUALITY CONTROLQUALITY CONTROL
-
8/9/2019 Aes Delhi Civil 2009
64/107
QUALITY CONTROLQUALITY CONTROLBEFORE
FIXINGSHAPE AND SIZE OF
TILE WITH SHARP
EDGES
-
8/9/2019 Aes Delhi Civil 2009
65/107
FINISHED FLOORING
-
8/9/2019 Aes Delhi Civil 2009
66/107
KOTA STONEKOTA STONE
FLOORINGFLOORING
-
8/9/2019 Aes Delhi Civil 2009
67/107
UNPOLISHEDUNPOLISHED
KOTAKOTA
-
8/9/2019 Aes Delhi Civil 2009
68/107
AFTERAFTER
POLISHINGPOLISHING
-
8/9/2019 Aes Delhi Civil 2009
69/107
FALSEFALSE
CEILINGCEILING
-
8/9/2019 Aes Delhi Civil 2009
70/107
WCWC
PARTITIONSPARTITIONS
WC PARTITION
-
8/9/2019 Aes Delhi Civil 2009
71/107
WC PARTITION
v12 mm thick prepolished corian stonefixed to floor, wallwith all necessaryfixing arrangement
v
vFabrication with 50*50mm stainless steel
frame
-
8/9/2019 Aes Delhi Civil 2009
72/107
EXTERNAL FAADEEXTERNAL FAADE
-
8/9/2019 Aes Delhi Civil 2009
73/107
-
8/9/2019 Aes Delhi Civil 2009
74/107
GRIT WASHGRIT WASH
-
8/9/2019 Aes Delhi Civil 2009
75/107
GRIT WASHGRIT WASH
-
8/9/2019 Aes Delhi Civil 2009
76/107
JALIJALI
-
8/9/2019 Aes Delhi Civil 2009
77/107
JALIJALI
Tile 150*150
Fixed at location of shafts
6mm wire for reinforcement
S ti h i t t fi
-
8/9/2019 Aes Delhi Civil 2009
78/107
Section showing terrace water proofing
-
8/9/2019 Aes Delhi Civil 2009
79/107
P.C.C of 1:4:8 is laidto provide the slopeof average thicknessof75mm.
Layer of cold appliedbitumen primer@ 0.2-0.3 lt/sqm over the
entire surface
TERRACETERRACE
WATERWATER
PROOFINGPROOFING
Two layers of 3mm thick APP polymeric mats
-
8/9/2019 Aes Delhi Civil 2009
80/107
MOPLY mineral 4kg/sq.m. membrane (For vertical faces)
-
8/9/2019 Aes Delhi Civil 2009
81/107
g q ( )
3*50mm Thick Extruded polystyrene Insulation boards3*50mm Thick Extruded polystyrene Insulation boards
-
8/9/2019 Aes Delhi Civil 2009
82/107
3 50mm Thick Extruded polystyrene Insulation boards3 50mm Thick Extruded polystyrene Insulation boards
with Ship lap jointswith Ship lap joints
Drentex
-
8/9/2019 Aes Delhi Civil 2009
83/107
Drentex
PEA GRAVELS
-
8/9/2019 Aes Delhi Civil 2009
84/107
E EL
-
8/9/2019 Aes Delhi Civil 2009
85/107
LANDSCAPINGLANDSCAPING
-
8/9/2019 Aes Delhi Civil 2009
86/107
COURTYARDCOURTYARD
IN INITIALIN INITIALSTAGESTAGE
-
8/9/2019 Aes Delhi Civil 2009
87/107
COURTYARD AS HANDED OVERCOURTYARD AS HANDED OVER
Quality AspectsQuality Aspects
-
8/9/2019 Aes Delhi Civil 2009
88/107
Quality AspectsQuality Aspectsv Inspite of space constraints we had set up a site
laboratory as in other SPCL Projects for testing ofconcrete, concrete ingredients, soil and otherconstruction material.
v The laboratory is being headed by Quality Engineer.
vA quality representative was always there at night forinspection of incoming material .
vWe also use to discuss our problems with the seniorsvisiting from RO and taking knowledge to develop
our team strength.
-
8/9/2019 Aes Delhi Civil 2009
89/107
-
8/9/2019 Aes Delhi Civil 2009
90/107
Financial Part
-
8/9/2019 Aes Delhi Civil 2009
91/107
EXTRA ITEMS
-
8/9/2019 Aes Delhi Civil 2009
92/107
EXTRA ITEMS
NUMBER OF ITEMS IDENTIFIED ASEXTRA ITEMS
52
TOTAL AMOUNT CLAIMED FROM THE EXTRA ITEMS Rs 11,867,427
-
8/9/2019 Aes Delhi Civil 2009
93/107
-
8/9/2019 Aes Delhi Civil 2009
94/107
-
8/9/2019 Aes Delhi Civil 2009
95/107
Progress S-Progress S-
-
8/9/2019 Aes Delhi Civil 2009
96/107
Progress SProgress S
CurveCurveIn
lacs
-
8/9/2019 Aes Delhi Civil 2009
97/107
SITE AS HANDED OVER
TO AMERICANEMBASSY SCHOOL
-
8/9/2019 Aes Delhi Civil 2009
98/107
-
8/9/2019 Aes Delhi Civil 2009
99/107
-
8/9/2019 Aes Delhi Civil 2009
100/107
-
8/9/2019 Aes Delhi Civil 2009
101/107
-
8/9/2019 Aes Delhi Civil 2009
102/107
-
8/9/2019 Aes Delhi Civil 2009
103/107
-
8/9/2019 Aes Delhi Civil 2009
104/107
-
8/9/2019 Aes Delhi Civil 2009
105/107
-
8/9/2019 Aes Delhi Civil 2009
106/107
-
8/9/2019 Aes Delhi Civil 2009
107/107