RUDRAYYA C YARAGAMBALIMATH

BE(MECHANICAL)

HVAC DESIGN ENGINEER (REVIT MEP)

rudrayyay@gmail.com

Contact No: +91-7411418211

PROJECT PORTFOLIO

HVAC PROJECT DETAILS

Building type: Commercial building

Location: Bangalore, India

Floors: Ground floor + 16 floors

Area: 3,00,000 sf

Cooling load: 352 TR

Occupancy: 3,584 people

Operating Schedule: 5 Days / Week

Air distribution system: VAV Single Duct

TYPICAL FLOOR PLAN

3D VIEW OF BUILDING

HEAT LOAD REPORT

AIR DISTRIBUTION DESIGN

AIR DISTRIBUTION SYSTEM

Floor mounted AHU is selected to distribute air

Comfort condition 77ºF And 50% RH

ADP is 54ºF And 8,000 CFM

Chilled water inlet 8ºC And outlet is 15ºC

VCD are placed at beginning of each Duct

Backward curved Aerofoil blade Centrifugal fan is selected

for AHU

Inline centrifugal fan is selected for Exhaust air

MERV – 8 Filter is selected for AHU

DUCT PRESSURE DROP ANALYSIS Pressure drop is due to bends and head

Static pressure in critical path is 29 Pa & 52 Pa

Based on Static pressure in critical path AHU fan is selected

CHILLER PLANT DESIGN

Total building cooling load 352 TR

Water cooled screw chillers 2 quantities

175TR+175TR

Cooling tower Approach is 3ºC And Range is 4ºC to

8ºC

ELECTRICAL SYSTEM

Ladder type cable trays are used

SECTIONAL VIEW

Lighting fixture Sprinkler

Diffuser False Ceiling

True Ceiling

PLUMBING

1:100 Slope for sanitary pipes

Sanitary pipe connection should be 45º

CO-ORDINATION OF ALL FLOORS

FIRE FIGHTING Fire fighting system is designed as per NBC

standards for commercial building

Pipes are sized based on No of sprinklers

INTERFERENCE CHECK Interference Report Project File: F:\HVAC REVIT PROJECT\floor project\RUDRA _Mechanical

Project.rvt

Created: Friday, May 27, 2016 4:06:49 PM

Last Update:

CLASH DETECTION & SOLUTION

Clash in between

supply duct and cable

tray.

Clash is solved by

moving supply duct

Clash in between

column and supply duct.

Clash is solved by

moving supply duct

ANNOTATION Labels are created to annotate duct size, flow

rate and BOD

Diffusers are tagged with neck size and CFM

CREATING FAMILY (AHU)

A1 DRAFT SHEET

BILL OF QUANTITY

THANK YOU