Page 1: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

FLY OVER KUALANAMU MEDAN – SUMATRA

UTARA

Page 2: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

SCOPE OF WORKS

VSL’s scope of works are :

a. SUPPLY of MATERIALS AND EQUIPMENTS of PRESTRESSING WORKS (excluding strand)

b. INSTALLATION (excluding bursting steel, support bar)

c. STRESSING

d. GROUTING (excluding cement)

Page 3: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

STRAND

MATERIAL SPECIFICATION

Page 4: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

DUCT

Material ini berfungsi sebagai pembungkus strand, dengan bahan dasarnya adalah Galvanized Zinc yang dibentuk berupa pipa berulir :

Page 5: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

LIVE ANCHORAGE

Page 6: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

DEAD END ANCHORAGE

Page 7: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

ADDITIVE FOR GROUT

Page 8: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

EQUIPMENT SPECIFICATION

Page 9: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

GROUT PUMP

Technical Data :

Power : 5.5 HPMax. Pressure : 10 BarVoltage : 380 VoltCapacity : 8 BagDelivery : 40 Liter/min

Page 10: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

FLOW CHART

Page 11: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

SPESIFIKASIGAMBAR KERJA

MATERIAL PABRIKASI STRAND INSTALASI STRAND KALAU ADA, INSTAL LIFTING HOOK

PEMASANGAN ANGKUR HIDUP DAN ANGKURMATI

INSPEKSI BERSAMA KONTRAKTOR

PENGECORAN

KUAT BETON PADA SAAT TRANSFER

STRESSING

EVALUASI HASIL STRESSING

GROUTING

SELESAI

MENUNGGU KUAT BETON PADASAAT TRANSFER TERCAPAI

TIDAK

OK

TIDAK

TIDAK

ALUR KERJ A PEKERJ AANPRESTRESSING

FLOW CHART

Page 12: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

SPESIFIKASIGAMBAR KERJA

MATERIAL PABRIKASI STRAND INSTALASI STRAND KALAU ADA, INSTAL LIFTING HOOK

PEMASANGAN ANGKUR HIDUP DAN ANGKURMATI

INSPEKSI BERSAMA KONTRAKTOR

PENGECORAN

KUAT BETON PADA SAAT TRANSFER

STRESSING

EVALUASI HASIL STRESSING

GROUTING

SELESAI

MENUNGGU KUAT BETON PADASAAT TRANSFER TERCAPAI

TIDAK

OK

TIDAK

TIDAK

ALUR KERJ A PEKERJ AANPRESTRESSING

FLOW CHART

Page 13: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

SHOP DRAWING

Page 14: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

SHOP DRAWING

Page 15: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

INSTALLATION

Page 16: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

1.1. Pemasangan pembesian balok Pemasangan pembesian balok

Page 17: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

2. 2. Pengukuran ordinat tendon Pengukuran ordinat tendon

Page 18: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

3. 3. Pemasangan support bar pada posisi yang telah Pemasangan support bar pada posisi yang telah diberi marking.diberi marking.

Page 19: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

4.4. Penempatan duct pada setiap support bar.Penempatan duct pada setiap support bar.5.5. Menyambung duct dengan duct coupler.Menyambung duct dengan duct coupler.

Page 20: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

6. Memasang angkur hidup (Casting)6. Memasang angkur hidup (Casting)7. Memastikan semua ordinat tendon telah berada 7. Memastikan semua ordinat tendon telah berada pada posisinya.pada posisinya.

Page 21: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

8.8. Pemeriksaan bersama kontraktor dan Pemeriksaan bersama kontraktor dan konsultankonsultan

9.9. Perbaikan jika diperlukan.Perbaikan jika diperlukan.10. Pengecoran.10. Pengecoran.

Page 22: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

STRESSING

Page 23: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

CCOMPRESSIVE COMPRESSIVE CONCRETE STRENGTH !!ONCRETE STRENGTH !!

STRESSING

Page 24: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

stressing tendon dapat dilakukan

Jika

Kuat Tekan Test Beton mencapai minimum 80% dari kriteria design

Kecuali tersebut dalam spesifikasi

STRESSING

Page 25: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

STRESSING

GENERAL STRESSING THEORY

Page 26: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

1. Perhitungan Jacking force 1. Perhitungan Jacking force

2. Persiapan peralatan stressing2. Persiapan peralatan stressing

3. Memasang anchor head dan wedges3. Memasang anchor head dan wedges

4. Memasang chair block.4. Memasang chair block.

5. Memasang jack hingga rapat anchor block5. Memasang jack hingga rapat anchor block

6. Memberikan gaya awal sebesar 5 mpa. untuk 6. Memberikan gaya awal sebesar 5 mpa. untuk merapatkan segmenmerapatkan segmen

7. Pencatatan gaya pada manometer dan elongasi7. Pencatatan gaya pada manometer dan elongasi

8. Persetujuan hasil stressing 8. Persetujuan hasil stressing

9. Menutup anchor head dengan mortar semen 9. Menutup anchor head dengan mortar semen (parging)(parging)

Page 27: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

Persiapan stressing bed

Pemasangan anchor block dan wedges

Page 28: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

Instalasi Hydraulic jackPenyetelan gripper plate dan

pemasangan T device

Page 29: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

Pemasangan busa pelindung duct dan pemberian epoxy pada sambungan segmen

Page 30: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

Pelaksanaan stressing

Page 31: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

Pengukuran elongation

Page 32: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

Page 33: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

STRESSING PROCEDURE (MULTISTRAND)

Page 34: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

METODA STRESSING SECARA UMUM :

1. ONE ENDArti : Stressing 1 unit tendon dilakukan pada 1 arah dengan

menggunakan 1 alat

2. BOTH ENDArti : Stressing 1 unit tendon dilakukan pada 2 arah secara

bersamaan dengan menggunakan 2 alat

3. TOP UPArti : Stressing 1 unit tendon dilakukan pada 2 arah secara

bergantian dengan menggunakan 1 atau 2 alat

Page 35: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

TAHAPAN STRESSING :

1. Stage I : up to 25% of Final Jacking Force

2. Stage II : up to 50% of Final Jacking Force

3. Stage III : up to 75% of Final Jacking Force

4. Stage IV : up to 100% of Final Jacking Force

5. Stage V : Release force down to 5% of Final Jacking Force

Page 36: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

WHEN EVERYTHING IS READY, STRESSING MAY BEGIN

Page 37: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

STRESSED TENDON AT ONE END ONLY (passive side is live end)

END AEND A

LL

STRESSED TENDON AT ONE END ONLY

Page 38: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

Page 39: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

STRESSING TENDON UP TO 25% OF FINAL JACKING FORCE

Page 40: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

MEASURED ELONGATION AND CEK WEDGE DRAW IN AT PASSIVE SIDE (IF ANY)

Page 41: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

1.) RECORD ELONGATION READING AT 25% OF FINAL JACKING FORCE

Page 42: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

RELEASE PRESSURE TO ZERO AND RETRACT PISTON

Page 43: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

PULL JACK BACKWARD SLIGHTLY AND SPRAY MARK AT BUNDLE STRAND WHERE ARE FACING ON ANCHOR HEAD

Page 44: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

PUSH JACK TOWARD ANCHOR HEAD

Page 45: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

STRESSING TENDON UP TO 50% OF FINAL JACKING FORCE, MEASURED ELONGATION.RECORD ELONGATION READING AT 50% OF FINAL JACKING FORCE.(calculated the elongation between 25% and 50% by deducting 25% value from 50% value and record that value)

Page 46: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

Page 47: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

STRESSING TENDON UP TO 75% OF FINAL JACKING FORCE, MEASURED ELONGATION.RECORD ELONGATION READING AT 75% OF FINAL JACKING FORCE.(calculated the elongation between 50% and 75% by deducting 50% value from 75% value and record that value)

Page 48: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

Page 49: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

STRESSING TENDON UP TO 100% OF FINAL JACKING FORCE, MEASURED ELONGATION.RECORD ELONGATION READING AT 100% OF FINAL JACKING FORCE.(calculated the elongation between 75% and 100% by deducting 75% value from 100% value and record that value)

Page 50: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

Page 51: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

RELEASE FORCE DOWN TO 5% OF FINAL JACKING FORCE , MEASURED ELONGATION.RECORD READING ELONGATION AT 5% OF FINAL JACKING FORCE.

Page 52: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

Page 53: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

CALCULATION ELONGATION

Page 54: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

Value of “adjustment jack (mm)” are based on the jack will be used during stressing.

Formula for Adjustment Jack = P L / n E A

Example :Type jack : ZPE 460L jack : 58 cmP jacking (100% JF) : 4028 KN = (4028 x 1000)/9.81 = 410601.427 kg n strand : 19 (0.6’)A strand : 1.5 cm2E strand : 1.95 x 106 kg/cm2

Adjustment Jack = (410601.427 x 58) / (19 x 1950000 x 1.5)= 0.42 cm = 4 mm

Value of “adjustment draw in a (mm)” and “adjustment draw in b (mm)” are based on VSL system, where ; a : draw in wedges at active side = 6 mm b : draw in wedges at passive side = 2 mm

Page 55: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

Elongation

calculated before

lock-off

Elongation

calculated after

lock-off

0mm -6mm Wedge seating in stressing end

-4mm -4mm Elongation in jack

-2mm -2mm Wedge seating in dead end

+6mm 0 Wedge seating in stressing end

0 0 Elongation in jack

-2mm -2mm Wedge seating in dead end

Engineer

Elongation measured

before lock-off

Elongation measured

after lock-off

Multi

Single

Page 56: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

Page 57: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

Page 58: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

Tujuan Grouting :

Mencegah korosi didalam Tendon

Sebagai kekuatan ikatan antara Tendon dan Beton

GROUTING

Page 59: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

Pemilihan materials semen, air, additive yang sesuai dengan spesifikasi

Kontrol terus menerus untuk memastikan hasil dan campurannya sesuai.

Pelaksanaan Grouting dilaksanakan oleh orang yang sudah berkompeten

Kualitas dari Grouting dapat dicapai dengan :

Page 60: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

Komposisi material penyusun grout :

Semen : 1 bag (50 kg)

Air : 0,40 – 0,45 dari berat semen

20 – 22,5 liter / sak semen

Admixture : 0.45 % dari berat semen

200 – 225 gram / sak semen

Page 61: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

Compressive Strength test

a. Test dilakukan pada sample kubus Grouting

b. Alat yang digunakan :

o Metal moulds 50 mm x 50 mm x 50 mm

o Compressive test machine

o Glass plate

o Steel ruler

Page 62: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

c. Prosedur :

o Pour fresh grout into the mould. The sample shall not be subject to any vibration. Immediately strike off the excess grout with steel ruler slowly in each direction. Then cover the sample with a glass plate. Give mark on mould to identify the sample.

o Sample harus direndam didalam air pada suhu ± 20 derajat celcius sampai saat akan dilakukan test.

o Compressive strength test dilakukan minimal pada 2 benda uji untuk satu Grouting mixing.

• Reporting : Catat hasil pengujian compressive strength untuk masing – masing

sample (N/mm2)

• Kriteria : strength ≥ 30 N/mm2 at 28 days strength ≥ 27 N/mm2 at 7 days

Page 63: Beton Prategang

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

Thank for your attention

VSL INDONESIAVSL INDONESIAPhone: (62) 21 570 0786Phone: (62) 21 570 0786

Fax: (62) 21 573 1217 / (62) 21 573 7557Fax: (62) 21 573 1217 / (62) 21 573 7557E-mail: [email protected]: [email protected]