  • 8/13/2019 SIEW_RI ME

    1/55

    INSPECTION OF M&E FIRE

    SAFETY WORKS

    PRESENTED BY: SIEW YEE CHEONG

  • 8/13/2019 SIEW_RI ME

    2/55

    Topics to be Covered1) Obstruction to Sprinklers

    2) Fire Rated Duct

    3) Fire Rated Pipe

    4) Auto and Manual Start/Stop of MV Fans

    5) Auto and Manual Start of Engineered Smoke Control System

    6) Hot Smoke Test

  • 8/13/2019 SIEW_RI ME

    3/55

    Obstruction to Sprinklers Vertical Obstruction (Large Duct, Deep Beam, Drop Ceiling)

    Sprinklers at Close Spacing

    Plan Obstruction

    Royal Flash Sprinkler

  • 8/13/2019 SIEW_RI ME

    4/55

    Fire source

    Coverage Areaoverlapped by

    sprinklers

    S S

    Wall

    < S

  • 8/13/2019 SIEW_RI ME

    5/55

    Fire

    source

    Area under

    duct is not

    protected

    Coverage

    Area

    overlapped

    by sprinklers

    S S

    S S

  • 8/13/2019 SIEW_RI ME

    6/55

    Sprinklers blocked by

    deep beam

    (insufficient coverage)

    Fire

    source

    Coverage

    Area

    overlapped

    by

    sprinklers

    S S

    All areas

    fullyprotected by

    sprinklers

    Supplementary

    sprinklers

    under beam

    Fire

    source

    S S

    Deep Beam Obstruction

  • 8/13/2019 SIEW_RI ME

    7/55

    Fire

    source

    S S

    Partial Area

    not

    protected

    Fire

    source

  • 8/13/2019 SIEW_RI ME

    8/55

  • 8/13/2019 SIEW_RI ME

    9/55

    Plan Obstruction

  • 8/13/2019 SIEW_RI ME

    10/55

    After Rectification Works

    Adjusted and added sprinklers to the 4 cubicle at sensory room

  • 8/13/2019 SIEW_RI ME

    11/55

    Royal Flash Sprinkler

  • 8/13/2019 SIEW_RI ME

    12/55

    Royal Flash Sprinkler

    Sprinkler Point

  • 8/13/2019 SIEW_RI ME

    13/55

    Fire Rated Duct

    (Ventilation, Kitchen Exhaust and Smoke Extract Duct)

    Proprietary System

    a) Cladded on steel duct using building boards (mainly calcium silicate

    based) of various thickness and density with mineral wool insulationb) Sprayed on steel duct with thick vermiculate spray (Vermiduct)

    c) Sprayed on steel duct with fine vermiculate spray (Flambar BW11)

  • 8/13/2019 SIEW_RI ME

    14/55

    Fire Rated Duct Installation

    General Requirements

    To be provided for smoke control system, kitchen exhaust system (horizontal

    duct only) and ducts serving special occupancies where fire dampers are not

    permitted. eg., FCC, fire pump room, generator room, and etc. Same fire resistance rating as the wall/ floor unless otherwise stated.

    PE Certificate of Supervision for Special Materials.

  • 8/13/2019 SIEW_RI ME

    15/55

    Fire Rated Duct Installation

    Typical non-compliance

    Use of non-approved system.

    Fire rated duct suspended from non-fire rated structure.

    Perforations and penetrations by other services for cladded on duct.

    Other ducts or service running directly above fire rated ducts.(Fire rated duct used to support other services)

    Workmanship and supervision of construction integrity.

    Hatch opening not properly constructed.

    Product without Certificate of Compliance (COC)

  • 8/13/2019 SIEW_RI ME

    16/55

    Fire Rated Duct Installation

    a. Cladded on steel duct using building boards (mainly calcium silicate based)

    of various thickness and density with mineral wool insulation.

  • 8/13/2019 SIEW_RI ME

    17/55

    Fire Rated Duct Installation

  • 8/13/2019 SIEW_RI ME

    18/55

    Fire Rated Duct Installation

    b. sprayed on steel duct with thick vermiculate spray (Vermiduct)

  • 8/13/2019 SIEW_RI ME

    19/55

    Fire Rated Duct Installation

    c. sprayed on steel duct with fine vermiculate spray (Flambar BW11)

  • 8/13/2019 SIEW_RI ME

    20/55

    Fire Rated Pipe(dry or wet riser) proprietary system

    a) Cladded on steel pipe using building calcium silicate boards

    b) Cladded on steel pipe using vermiculate boards

    c) Sprayed on steel pipe using vermiculate mortar

  • 8/13/2019 SIEW_RI ME

    21/55

    Fire Rated Pipe Installation

  • 8/13/2019 SIEW_RI ME

    22/55

    Fire Rated Pipe Installation

    Cladded on steel pipe using calcium silicate boards

  • 8/13/2019 SIEW_RI ME

    23/55

    Fire Rated Pipe InstallationSprayed on steel pipe using vermiculate mortar

  • 8/13/2019 SIEW_RI ME

    24/55

    Any non-compliance?

  • 8/13/2019 SIEW_RI ME

    25/55

    Any non-compliance?

  • 8/13/2019 SIEW_RI ME

    26/55

    Dry riser located outside stair

  • 8/13/2019 SIEW_RI ME

    27/55

    Any non-compliance?

  • 8/13/2019 SIEW_RI ME

    28/55

    Mechanical Ventilation System for Stair, Internal

    Exit Passage and Smoke Stop Lobby

    General Requirements

    MV to be provided if Natural Ventilation is not available or not adequate.

  • 8/13/2019 SIEW_RI ME

    29/55

    Mechanical Ventilation System for Stair, Internal

    Exit Passage and Smoke Stop Lobby

    System requirements Independent system.

    Supply mode.

    10 air-change/ hour for lobby.

    Riser in separate masonry shaft.

    Fans connected to emergency power supply.

    5m separation distance from other exhaust discharge.

    Horizontal duct outside staircase/ passage by fire rated duct.

    Activate by building fire alarm system; and manual remote starting at FCC/ MAP.

    For lobby system, vertical fire dampers can be provided at shaft openings

  • 8/13/2019 SIEW_RI ME

    30/55

    Mechanical Ventilation System for Stair, Internal

    Exit Passage and Smoke Stop Lobby

  • 8/13/2019 SIEW_RI ME

    31/55

    Staircase Pressurisation System

    General Requirement

    Internal stair in building exceeding 24m in height.

    Basement stair serving more than 4 storey.

    Specifically required by FSSD.

  • 8/13/2019 SIEW_RI ME

    32/55

    Staircase Pressurisation SystemSystem requirements

    Activate automatically upon building fire alarm.

    Manual start/stop and status monitoring at FCC/ MAP.

    Fans to be connected to emergency power supply. Maintain pressure gradient such that the pressure at the exit stair is higher

    than the smoke stop lobby, pressure differential around 50 Pascal.

    Force to open any door not exceeding 110N.

    Air velocity across door opening with 2 doors from any 2 successive storeysand the main discharge door fully open at least 1m/s.

    5m separation distance.

    Distribution of Pressurisation air.

    Relief device.

  • 8/13/2019 SIEW_RI ME

    33/55

    Staircase Pressurisation System

  • 8/13/2019 SIEW_RI ME

    34/55

    Staircase Pressurisation System

  • 8/13/2019 SIEW_RI ME

    35/55

    Staircase Pressurisation System

  • 8/13/2019 SIEW_RI ME

    36/55

    Staircase Pressurisation System

  • 8/13/2019 SIEW_RI ME

    37/55

    Staircase Pressurisation System

  • 8/13/2019 SIEW_RI ME

    38/55

    Staircase Pressurisation System

  • 8/13/2019 SIEW_RI ME

    39/55

    Staircase Pressurisation System

  • 8/13/2019 SIEW_RI ME

    40/55

    Staircase Pressurisation System

  • 8/13/2019 SIEW_RI ME

    41/55

    Staircase Pressurisation System

  • 8/13/2019 SIEW_RI ME

    42/55

    Staircase Pressurisation System

  • 8/13/2019 SIEW_RI ME

    43/55

    Staircase Pressurisation System

  • 8/13/2019 SIEW_RI ME

    44/55

    Staircase Pressurisation System

  • 8/13/2019 SIEW_RI ME

    45/55

    Basement Carpark Smoke Purging System

    (Conventional Ducted Design)

    General Requirement

    For basement carpark with total floor areas exceeding 2000 sq.m.

  • 8/13/2019 SIEW_RI ME

    46/55

    Basement Carpark Smoke Purging System

    System requirements

    Independent system.

    Smoke purging rate at 9 air change/ hour (normal MV requirement at6 air change/ hour.

    Activate automatically by building fire alarm.

    Manual starting/ stopping and status monitoring at FCC/ MAP.

    Interlocking of FA and EA fans. No FA fans if opening is larger than2.5% of floor area.

    5m separation distance.

    Exhaust ducts constructed of 1.2mm thick gauge sheet and no firedampers.

  • 8/13/2019 SIEW_RI ME

    47/55

    Atrium Smoke Control System

    General Requirement

    Applicable only for Atrium

    Building to be sprinkler protected

  • 8/13/2019 SIEW_RI ME

    48/55

    Atrium Smoke Control SystemSystem requirements

    Engineered design system.

    Usually involves multi-scenarios. (Auto start by dedicated smoke detector)

    Performance specification to maintain smoke layer at not less than 2.5mabove floor. Fire size depending on occupancy.

    Adequate low level fresh air intake for replenishment.

    May be in the form of natural vents (with fail safe feature) or mechanicalextraction (with excess capacity and emergency power.

    Compliance with other prescription requirements of Cl. 7.6.

    Status monitoring Fans, Smoke Vent, Smoke Curtain, Replacement air inlet. Manual start based on selected scenarios.

  • 8/13/2019 SIEW_RI ME

    49/55

    Manual Start/Stop of MV Fans

    General Requirement

    (stair MV , stair pressurization, carpark smoke purging, STL/FFL MV)

    A manual start-stop switch to be made available to firemen at FCC or MAP

    System Requirements

    Switch to over-ride fire alarm signal.

    Ability to manual start without fire alarm signal.

    Auto re-starting of fans upon change to emergency power under fire alarmcondition.

    Fans should not auto reset upon resetting of fire alarm.

  • 8/13/2019 SIEW_RI ME

    50/55

    Manual start of Engineered Smoke Control System

    General Requirement A remote manual activation and control switches to be provided at

    FCC or MAP

    System requirements Manual activation according to design scenarios.

    No requirement to manual stop the fans or close smoke vents during smokedetector activation condition.

    Auto re-starting of fans upon change to emergency power under smokedetector activation condition.

    Fans, smoke curtains, smoke vents & etc should not auto reset uponresetting of smoke detector.

    Fans may not re-start upon change to emergency power if there is no firealarm condition.

  • 8/13/2019 SIEW_RI ME

    51/55

    Manual start of Engineered Smoke Control System

  • 8/13/2019 SIEW_RI ME

    52/55

    Manual start of Engineered Smoke Control System

  • 8/13/2019 SIEW_RI ME

    53/55

    Garden by the Bay

  • 8/13/2019 SIEW_RI ME

    54/55

    PB DesignNon-compliances include the following

    Travel Distance

    Exit Capacity

    Exit Discharge

    Engineering smoke Control Design

    Omission of Sprinkler Protection below envelope

    Unprotected elevated walkways (cool moist conservatory only)

  • 8/13/2019 SIEW_RI ME

    55/55

    Duties of RI (M&E) Review the FEDB, FER and Engineering smoke control design agreed by fire

    size at the gardens are 3 MW (for Christmas tree fire) and 1 MW (for rubbish

    fire in flower field)

    Carry out physical test of the smoke scenario, ie., smoke detection by

    aspirating smoke detector, opening of sunshield, smoke vents, replacementair inlet, tripping of AHU and signal to FCC

    Test the manual start function

    Witness hot smoke test