संचय जल, बेहतर कल

District Overview

Demographic Features

Population 12,55,104

Rural Population 9,73,985 (78%)

Urban Population 2,81,111 (22%)

Population Density 298

SC Population 3,12,565 (24%)

ST Population 1,56,487 (12%)

No. of Taluks 06

No. of Panchayaths

157

Total Area 4,208 Sq Km2

Chikballapur District is the eastern gateway to Karnataka. It is land locked District and hard rock terrain of Karnataka in the plain region and covers an area of 4208 sq.km.

Shidlaghatta Taluk

Chikkaballapura Taluk

3

Gudibande Taluk

Hydrographs

Source – Ground Water Department

Water Stressed Blocks 2013 Water Stressed Blocks 2017

Source - NRDMS

4

Water Profile of Chikballapur

• District falls in the Eastern Dry Agro Climatic Zone.

• Annual Average Rainfall of the District is 676mm.

• The South West Monsoon contributes around 55 percent of the Annual average Rainfall. The North EastMonsoon yields around 30 percent. The balance of around 15 percent results from the pre-monsoon.

• There are no Perennial rivers in Chikballapur district .The district is drained by three river basins Palar(Cheyya River), Pennar (Uttara Pinakini, Dakshin Pinakini , Chitravati, Papagni, Jayamangala, Kunderu),Ponnaiyar (Pambar).

• All these rivers and their tributaries are small and carry water only during rainy season.

• The area irrigated by bore wells constitutes 99% of the total irrigated area.

• As per Ground Water Resource Assessment of CGWB, all six Blocks of the district are designated as “OverExploited”

5

•Severe drought in 8 out of past 10 years (except 2015 and 2017).•Around 110 villages have been provided drinking water through tankers during July -September 2019 .•Water level/yield dwindling along with high concentration of Fluoride posing achallenge

6

Special Initiatives undertaken in Chikballapur District

Traditional Step Wells ( Kalyani) Cleaning

through Shramdhaan

“Green Fund”

A Novel Initiative where all GPs, TPs and CMCs

earmark 5% fund for WC works

“ Hasiru Karnataka - KotiNaati”

Plantation Programme in Govt and Private Land

Signature Campaign, Rallies, to create

awareness among people across age groups on Water Conservation

People

Participation

People Participation – Elected Representatives, Government Officials and Public involved for Shramdhaan Step Well Cleaning, Chikballapur Block

7

Traditional Step Well (Kalyani) cleaned in

Vapasandra, Chikballapur. Elected

Representatives, Govt Officials /Staff and 50-60 Citizens

participated in cleaning drive

Traditional Step Well - Alambagiri Rejuvenated through Shramdhan, Chintamani Block

8

This Traditional Step Well is located at Alambagiri, Munaganahalli GP. It was constructed around 800 years ago. It was rejuvenated on June 4th, 2019, and subsequently filled with rain water.

Kalyani Renovation through Shramdhaana

9

Sadali GP, Sidlaghatta BlockDate: 21-07-2019

Dibburahalli GP, SidlaghattaBlockDate: 29-07-2019

Manchenalli GP, GauribidanurBlock Date: 16-09-2019

IEC Activities and Workshops on Water Conservation

Launch of State Government Programme “Jalamrutha”.

Karnataka Government declared 2019 as a Year of Water Participants – Elected Representatives, all District Line Department Officers, EOs, ADs, PDOs and Technical Staff 10

Launch of “Chilume” initiative by DC, CEO and A R Shivakumar

Orientation on installing RainWater Harvesting structuresfor all Government/PrivateBuildings and IndividualHouses by A. R. Shivakumar(Former Scientist KSCST, IISc,Bangalore)

11

Workshop on Water Conservation and Sanitation “Jeeva Jala, Swatchameva jayathe, Jalamrutha & JalShakti Abhiyan” for ZP President, Vice President, Members, Taluk Panchayat Presidents, VicePresidents, all GP PDOs & Presidents, EOs, ADs & other Staff on 20.09.2019

12

Awareness on Water & Sanitation by Cultural team as a part of IEC Activity

13

1 Water Conservation and Rain water Harvesting

2

3

4

5

Renovation of Traditional Water Bodies

Reuse & Recharge Structures

Watershed Development

Intensive Afforestation

Jal Shakti Intervention Areas

14

1. Water Conservation and Rainwater Harvesting

a) Rooftop Rainwater Harvesting (Public/Private)b) Check Damsc) Trenchesd) Farm Ponds

Water storage at Multi Arch Check Dam in E Thimmasandra GP, Shidlaghatta Block, Chikballapur

tHealth insurance cover of up to

₹ 5

1. Water Conservation and Rain Water Harvesting

239 Roof Top Rain

Water Harvesting structures

15

50Water Pools

335 Trench /

Bund works

2546 Farm

Ponds

118 Multi Arch

Check Dams

Multi Arch Check Dam at Kommasandra Village, Sidlaghatta Block

16

Work Name – MACDLocation - E Thimmasandra GP Wage – 3.96 LakhMaterial – 5.94 LakhTotal – 9.9 LakhMan days – 1589Bore Wells Benefited – 5Water Stored – 10.80 Lakh Ltrs

Date: 14-09-2019

A video byte of Multi Arch Check Dam

17

Multi Arch Check Dam at Bandahalli Village, Sidlaghatta Block

18

Work Name – MACDLocation - E Thimmasandra GPCost Wage – 2.92 LakhMaterial – 6.22 LakhTotal – 9.14 LakhMan days – 1204Bore Wells Benefited – 6Water Stored –10.80 Lakh Ltrs

Date: 19-09-2019

Water Pool in Chintamani Block

19

Work Name – Water PoolLocation – B S Halli GPWage – 3.88 LakhMaterial – 1.1 LakhTotal – 4.98 LakhMan days – 1561Bore Wells Benefited – 3Water Stored – 75 Lakh Ltrs

Testimonial: Farmer Smt. Veda briefing about increase in Crop production after construction of Farm Pond

20

➢Farm Pond Structure constructed in Varadahally seed farm Nandi Hobli, Chickballapura Taluk. ➢Water storage capacity of this structure is 987 cubic meter. ➢ Sustaining /Support, two critical Irrigation of crops like, Ragi & Red Gram for 4 Ha.

Before After

Latitude: 130.26.14” N Longitude: 77o.43.51” E Dimension: 21*21*3=987 CMT

Farm Pond Construction in Chikballapur Block

21

Horticulture Works

22

Beneficiary Name: Sri Patalamma Devi Raithara Sanga, .

Village:- TaduruGrama Panchayath :- BhaktharahalliTaluk:- SidlaghattaScheme:- NHM Expenditure:- 400000Meassurement:- 53m*30 m*7 m

Beneficiary Name: VenugopalVillage:- AjjawaraGrama Panchayath :- AjjawaraTaluk:- ChikkaballapuraScheme:- PMKSY

Community Farm PondDrip Irrigation Plots

Beneficiary Name: Vanajamma W/o Narayanaswamy.Village:- KandakanahallyGrama Panchayath :- AngarekanahallyTaluk:- ChikkaballapuraScheme:- NHMExpenditure:- 1650000Meassurement:- 2000 Sq. m

Poly House

Roof Top Rain Water Harvesting Structure in Sidlaghatta Block

23

JSA Central team headed by Mr. Pankaj Kumar, Addl. Secretary, MEITY, GOI Inspecting Rain Water Harvesting Structure installed at Taluk Panchayat, Sidlaghatta

Sump Capacity - 0.62 Lakh LtrsWater Stored - 0.50 Lakh Ltrs

Roof Top Rain Water Harvesting Structures for GP Buildings

24

➢District Office Complex and all 6 Taluk Panchayats (100%) installed with RWH

➢All 157 Gram Panchayats(100%) of the District installed with RWH

➢Hostels - 69➢Schools - 26➢PHCs - 8➢AWCs - 10

➢All Government Buildings are planned to be installed with RWH in 2019

1

2 Renovation of Traditional Water Bodies

3

4

5

Reuse & Recharge Structures

Watershed development

Intensive Afforestation

Interventions under Jal Shakti Abhiyan

Water conservation & rain water harvesting

25

2. Renovation of Traditional and other Water Bodies/Tanks

a) Traditional Water Bodies/Tanks restoration (includes individual household units)

b) Other Water Bodies restoration

Traditional Kalyani Renovation, Shidlaghatta, Chikballapur

tHealth insurance cover of up to 26

₹ 5

2. Renovation of Traditional Water Bodies

239 Roof Top rain

water harvesting

structures

189Tanks Desilted

142Traditional Step Wells [Kalyanis]

out of 142 (100%) Cleaned through Shramdaan

26

Chakra Theertha Kalyani cleaned by Government Officials and Volunteers in Chikballapur Block

• This Kalyani is located behind thehistorical Ranganatha Swamy Temple,Rangastala, Chikballapura Block.• It was constructed during Hoysalasreign.• It was abandoned and cleaned in July2019 through Public Participation.

27

Tank Desiltation works

28

Nallagutlapalli GP, Bagepalli Block

Dibburahalli GP, Shidlaghatta Block

E-thimmasandra GP, Shidlaghatta Block

1

2

3 Reuse and Recharge Structures

4

5

Renovation of traditional water bodies

Watershed development

Intensive Afforestation

Interventions under Jal Shakti Abhiyan

29

Water conservation & rain water harvesting

3. Reuse, Bore Well Recharge Structures

a) Bore Well Recharge Structuresb) Soak Pits

Soak pit Construction, Chikballapur District

tHealth insurance cover of up to

₹ 5 lakh/family/yea

3. Reuse and Recharge Structures

1450Borewell Recharge Pits constructed

379Soak Pits Constructed

301Recharge wells Constructed

30

Recharge well in Manchenahalli GP, Gauribidanur Block

31

Recharge Well inspected by Central Jal Shakti Team headed by Mr. Pankaj Kumar, Addl. Secretary, MEITY, GOI, during their 3nd Visit (September 2019)

Boulder Check in Sidlaghatta Block

32

Boulder Checks are mainlybuilt to prevent erosion and tosettle sediments andpollutants. Furthermore, it ispossible to maintain soilmoisture due to infiltration.Location:Cheemangala,Sidlaghatta BlockEstimated Cost: Rs 60000Wage: 27390Material: 31600Mandays: 110Water Storage Capacity:36000Ltrs

1

2

3

4 Watershed Development

5

Renovation of traditional water bodies

Reuse & Recharge Structures

Intensive Afforestation

Water conservation & rain water harvesting

Interventions under Jal Shakti Abhiyan

33

4. Watershed Development

a) Area under Watershed Developmentb) Staggered trenchesc) Gully Plugsd) Percolation Tanks

Farm Pond, Chikballapur District

4. Watershed Development

274Channels Rejuvenated

119Nala Bunds and Gully Plugs

Constructed

983 HaArea Treated

34

Dimension: Bund Length: 42 Mtr

Nala Bund Construction in Gauribidanur Block

Latitude: 13034’80” Longitude: 77035’60”E

This structure has increased the water table inthe surrounding 5 borewells.

Water storage capacity of this Structureconstructed under PMKSY is 2500 cubic

meter. 35

Scheme: PMKSYEstimated Cost: Rs 2.42lakhsDimension: 30mX2.6mtrsWater Storage Capacity:2500 cumtWater Stored: 1900 cumtBorewells Benefitted: 05

Feeder Channel Rejuvenation in Sidlaghatta Block

36Date: 28-07-2019 Date: 26-09-2019 Location: Tummanahalli, Sidlaghatta BlockExpenditure: 8 Lakhs, Mandays: 1807, Length: 650 Mtrs

1

2

3

4

5 Intensive Afforestation

Water conservation & rain water harvesting

Renovation of traditional water bodies

Reuse & Recharge Structures

Watershed development

Interventions under Jal Shakti Abhiyan

37

5. Intensive Afforestationa) Seedlings plantedb) Area under plantation

v

5. Intensive Afforestation

8.40 LakhSaplings Planted by

Social & Regular forest

3.89 LakhSaplings Planted by

Horticulture department

0.37 LakhSaplings Planted by

Agriculture department38

18 lakhSaplings Planted

in the District

4.76 LakhSaplings Planted by

Gram Panchayat’s

Horticulture Department

Agriculture Department

Video Byte on Afforestation in Gauribidanur Block

39

PLANTATION AT GOVT HIGH SCHOOL LAND, PALICHERLU GP, SHIDLAGHATTA BLOCK

IMPLEMENTATION

Plantation Work at Palicherlu Government High School

Ground.

Covered 4 acres land for plantation, 2000 saplings

Providing Employment to 50 jobcard holders, 550

persondays

Arrangement of Drip irrigation for providing water to

plants to control the drying of plant

40

Sr. No

Taluk Location Sep-2018

water level in mtrs

Sep-2019 Water level

in mts

Rise in Water Level

(in mtrs )

1 Chikkaballapur Ajjawara 106.8 106 0.8

2 Sidlagatta Dibburahalli 24.67 22.34 2.33

3 Chintamani Konganahalli 51.29 45.22 6.07

4 Bagepalli Guluru 89.82 84.8 5.02

Water Level Measured in Adjacent Bore Wells of JSA Structures

Measuring Water Level by Ground Water Department

41

❖ JSA is a promising approach to improve the water crisis in the District.

❖ JSA provided a much needed platform to bring Government officials and Citizens

together.

❖Works taken up under the campaign enhanced the water storage capacity across

the District followed by good rain in the month September and October 2019 gave

short term relief to water problem.

❖ As a part of the Campaign 142 Traditional Step Wells in the district were restored

to their lost glory with a sustainability plan in place.

❖ Special initiative “Chilume”, “JeevaJala”, “Koti-Nati”, “Signature Campaign” has

received tremendous response from public and created awareness about

importance of water conservation.

Outcome of JSA

❖Since 01.10.2019, 555 new works under water conservation and rain water harvesting

are on going, 59 under renovation of traditional water bodies, 25 reuse and recharge

structures, 1133 watershed development works, 3272 intensive afforestation works have

already been taken up under Phase 2 Jal Shakti Abhiyan.

❖Stringent administrative action will be taken to prevent and remove encroachment near

water bodies.

❖Focus will be given for installation of Rain Water Harvesting structures in individual

households.

❖Afforestation will be taken up with more vigour as forested catchments supply a high

proportion of water for domestic, agricultural, industrial and ecological needs, help

regulate climate, store carbon, and reduce flooding and storm water runoff.

❖In the medium term, focus will be given to Grey water treatment and reuse of reclaimed

water for non-potable and industrial purposes.

Way Forward

Thank You

44

68%

18%

8%

61%Rural Population

Literacy Rate

SC Population

T Population

State Profile

8%

No of District : 30

No of Taluk : 176

No of GPs : 6024

Population in the State : 6.11 Crore

Geographical Area : 191791 Sqkm

No of HHs : 133.57 lakh

Total no of Jobcard issued : 60.48 lakhs

Total Active Jobcards : 32.4 lakhs

Total Workers :145.27 lakhs

% SC Workers : 15.46

% ST Workers : 11.2

45

46

JSA Target and Achievement (As on 22.10.2019)

Total No. of Districts Covered

Total No. of Blocks Covered

Started Completed

Target Achieved Target Achieved

18 53 20484 28030 (137%) 37022 39996 (108.03%)

Total No. of Blocks Covered

Total No. of GPs Covered

Started Completed

Target Achieved Target Achieved

6 157 1979 3274 (165%) 3376 3963 (117%)

Karnataka State

Chikballapura District

Chintamani Taluk

Gowribidanur Taluk

Bagepalli Taluk

47

Hydrographs

Source – Ground Water Department

Kalyani Renovated through Shramdhaana at Santhekallahalli GP, Chintamani Block

48Date: 13-08-2019

A video byte of Multi Arch Check Dam