DESCRIPTION

Stressing cable

TRANSCRIPT

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

FLY OVER KUALANAMU MEDAN – SUMATRA

UTARA

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

SCOPE OF WORKS

VSL’s scope of works are :

a. SUPPLY of MATERIALS AND EQUIPMENTS of PRESTRESSING WORKS (excluding strand)

b. INSTALLATION (excluding bursting steel, support bar)

c. STRESSING

d. GROUTING (excluding cement)

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

STRAND

MATERIAL SPECIFICATION

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

DUCT

Material ini berfungsi sebagai pembungkus strand, dengan bahan dasarnya adalah Galvanized Zinc yang dibentuk berupa pipa berulir :

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

LIVE ANCHORAGE

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

DEAD END ANCHORAGE

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

ADDITIVE FOR GROUT

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

EQUIPMENT SPECIFICATION

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

GROUT PUMP

Technical Data :

Power : 5.5 HPMax. Pressure : 10 BarVoltage : 380 VoltCapacity : 8 BagDelivery : 40 Liter/min

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

FLOW CHART

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

SPESIFIKASIGAMBAR KERJA

MATERIAL PABRIKASI STRAND INSTALASI STRAND KALAU ADA, INSTAL LIFTING HOOK

PEMASANGAN ANGKUR HIDUP DAN ANGKURMATI

INSPEKSI BERSAMA KONTRAKTOR

PENGECORAN

KUAT BETON PADA SAAT TRANSFER

STRESSING

EVALUASI HASIL STRESSING

GROUTING

SELESAI

MENUNGGU KUAT BETON PADASAAT TRANSFER TERCAPAI

TIDAK

OK

TIDAK

TIDAK

ALUR KERJ A PEKERJ AANPRESTRESSING

FLOW CHART

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

SPESIFIKASIGAMBAR KERJA

MATERIAL PABRIKASI STRAND INSTALASI STRAND KALAU ADA, INSTAL LIFTING HOOK

PEMASANGAN ANGKUR HIDUP DAN ANGKURMATI

INSPEKSI BERSAMA KONTRAKTOR

PENGECORAN

KUAT BETON PADA SAAT TRANSFER

STRESSING

EVALUASI HASIL STRESSING

GROUTING

SELESAI

MENUNGGU KUAT BETON PADASAAT TRANSFER TERCAPAI

TIDAK

OK

TIDAK

TIDAK

ALUR KERJ A PEKERJ AANPRESTRESSING

FLOW CHART

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

SHOP DRAWING

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

SHOP DRAWING

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

INSTALLATION

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

1.1. Pemasangan pembesian balok Pemasangan pembesian balok

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

2. 2. Pengukuran ordinat tendon Pengukuran ordinat tendon

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

3. 3. Pemasangan support bar pada posisi yang telah Pemasangan support bar pada posisi yang telah diberi marking.diberi marking.

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

4.4. Penempatan duct pada setiap support bar.Penempatan duct pada setiap support bar.5.5. Menyambung duct dengan duct coupler.Menyambung duct dengan duct coupler.

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

6. Memasang angkur hidup (Casting)6. Memasang angkur hidup (Casting)7. Memastikan semua ordinat tendon telah berada 7. Memastikan semua ordinat tendon telah berada pada posisinya.pada posisinya.

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

8.8. Pemeriksaan bersama kontraktor dan Pemeriksaan bersama kontraktor dan konsultankonsultan

9.9. Perbaikan jika diperlukan.Perbaikan jika diperlukan.10. Pengecoran.10. Pengecoran.

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

STRESSING

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

CCOMPRESSIVE COMPRESSIVE CONCRETE STRENGTH !!ONCRETE STRENGTH !!

STRESSING

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

stressing tendon dapat dilakukan

Jika

Kuat Tekan Test Beton mencapai minimum 80% dari kriteria design

Kecuali tersebut dalam spesifikasi

STRESSING

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

STRESSING

GENERAL STRESSING THEORY

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

1. Perhitungan Jacking force 1. Perhitungan Jacking force

2. Persiapan peralatan stressing2. Persiapan peralatan stressing

3. Memasang anchor head dan wedges3. Memasang anchor head dan wedges

4. Memasang chair block.4. Memasang chair block.

5. Memasang jack hingga rapat anchor block5. Memasang jack hingga rapat anchor block

6. Memberikan gaya awal sebesar 5 mpa. untuk 6. Memberikan gaya awal sebesar 5 mpa. untuk merapatkan segmenmerapatkan segmen

7. Pencatatan gaya pada manometer dan elongasi7. Pencatatan gaya pada manometer dan elongasi

8. Persetujuan hasil stressing 8. Persetujuan hasil stressing

9. Menutup anchor head dengan mortar semen 9. Menutup anchor head dengan mortar semen (parging)(parging)

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

Persiapan stressing bed

Pemasangan anchor block dan wedges

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

Instalasi Hydraulic jackPenyetelan gripper plate dan

pemasangan T device

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

Pemasangan busa pelindung duct dan pemberian epoxy pada sambungan segmen

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

Pelaksanaan stressing

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

Pengukuran elongation

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

STRESSING PROCEDURE (MULTISTRAND)

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

METODA STRESSING SECARA UMUM :

1. ONE ENDArti : Stressing 1 unit tendon dilakukan pada 1 arah dengan

menggunakan 1 alat

2. BOTH ENDArti : Stressing 1 unit tendon dilakukan pada 2 arah secara

bersamaan dengan menggunakan 2 alat

3. TOP UPArti : Stressing 1 unit tendon dilakukan pada 2 arah secara

bergantian dengan menggunakan 1 atau 2 alat

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

TAHAPAN STRESSING :

1. Stage I : up to 25% of Final Jacking Force

2. Stage II : up to 50% of Final Jacking Force

3. Stage III : up to 75% of Final Jacking Force

4. Stage IV : up to 100% of Final Jacking Force

5. Stage V : Release force down to 5% of Final Jacking Force

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

WHEN EVERYTHING IS READY, STRESSING MAY BEGIN

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

STRESSED TENDON AT ONE END ONLY (passive side is live end)

END AEND A

LL

STRESSED TENDON AT ONE END ONLY

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

STRESSING TENDON UP TO 25% OF FINAL JACKING FORCE

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

MEASURED ELONGATION AND CEK WEDGE DRAW IN AT PASSIVE SIDE (IF ANY)

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

1.) RECORD ELONGATION READING AT 25% OF FINAL JACKING FORCE

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

RELEASE PRESSURE TO ZERO AND RETRACT PISTON

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

PULL JACK BACKWARD SLIGHTLY AND SPRAY MARK AT BUNDLE STRAND WHERE ARE FACING ON ANCHOR HEAD

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

PUSH JACK TOWARD ANCHOR HEAD

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

STRESSING TENDON UP TO 50% OF FINAL JACKING FORCE, MEASURED ELONGATION.RECORD ELONGATION READING AT 50% OF FINAL JACKING FORCE.(calculated the elongation between 25% and 50% by deducting 25% value from 50% value and record that value)

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

STRESSING TENDON UP TO 75% OF FINAL JACKING FORCE, MEASURED ELONGATION.RECORD ELONGATION READING AT 75% OF FINAL JACKING FORCE.(calculated the elongation between 50% and 75% by deducting 50% value from 75% value and record that value)

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

STRESSING TENDON UP TO 100% OF FINAL JACKING FORCE, MEASURED ELONGATION.RECORD ELONGATION READING AT 100% OF FINAL JACKING FORCE.(calculated the elongation between 75% and 100% by deducting 75% value from 100% value and record that value)

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

RELEASE FORCE DOWN TO 5% OF FINAL JACKING FORCE , MEASURED ELONGATION.RECORD READING ELONGATION AT 5% OF FINAL JACKING FORCE.

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

CALCULATION ELONGATION

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

Value of “adjustment jack (mm)” are based on the jack will be used during stressing.

Formula for Adjustment Jack = P L / n E A

Example :Type jack : ZPE 460L jack : 58 cmP jacking (100% JF) : 4028 KN = (4028 x 1000)/9.81 = 410601.427 kg n strand : 19 (0.6’)A strand : 1.5 cm2E strand : 1.95 x 106 kg/cm2

Adjustment Jack = (410601.427 x 58) / (19 x 1950000 x 1.5)= 0.42 cm = 4 mm

Value of “adjustment draw in a (mm)” and “adjustment draw in b (mm)” are based on VSL system, where ; a : draw in wedges at active side = 6 mm b : draw in wedges at passive side = 2 mm

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

Elongation

calculated before

lock-off

Elongation

calculated after

lock-off

0mm -6mm Wedge seating in stressing end

-4mm -4mm Elongation in jack

-2mm -2mm Wedge seating in dead end

+6mm 0 Wedge seating in stressing end

0 0 Elongation in jack

-2mm -2mm Wedge seating in dead end

Engineer

Elongation measured

before lock-off

Elongation measured

after lock-off

Multi

Single

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

Tujuan Grouting :

Mencegah korosi didalam Tendon

Sebagai kekuatan ikatan antara Tendon dan Beton

GROUTING

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

Pemilihan materials semen, air, additive yang sesuai dengan spesifikasi

Kontrol terus menerus untuk memastikan hasil dan campurannya sesuai.

Pelaksanaan Grouting dilaksanakan oleh orang yang sudah berkompeten

Kualitas dari Grouting dapat dicapai dengan :

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

Komposisi material penyusun grout :

Semen : 1 bag (50 kg)

Air : 0,40 – 0,45 dari berat semen

20 – 22,5 liter / sak semen

Admixture : 0.45 % dari berat semen

200 – 225 gram / sak semen

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

Compressive Strength test

a. Test dilakukan pada sample kubus Grouting

b. Alat yang digunakan :

o Metal moulds 50 mm x 50 mm x 50 mm

o Compressive test machine

o Glass plate

o Steel ruler

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

c. Prosedur :

o Pour fresh grout into the mould. The sample shall not be subject to any vibration. Immediately strike off the excess grout with steel ruler slowly in each direction. Then cover the sample with a glass plate. Give mark on mould to identify the sample.

o Sample harus direndam didalam air pada suhu ± 20 derajat celcius sampai saat akan dilakukan test.

o Compressive strength test dilakukan minimal pada 2 benda uji untuk satu Grouting mixing.

• Reporting : Catat hasil pengujian compressive strength untuk masing – masing

sample (N/mm2)

• Kriteria : strength ≥ 30 N/mm2 at 28 days strength ≥ 27 N/mm2 at 7 days

Creating

Solutions

Together

FLY OVER KUALANAMU - MEDAN

Thank for your attention

VSL INDONESIAVSL INDONESIAPhone: (62) 21 570 0786Phone: (62) 21 570 0786

Fax: (62) 21 573 1217 / (62) 21 573 7557Fax: (62) 21 573 1217 / (62) 21 573 7557E-mail: vslin@vslin.comE-mail: vslin@vslin.com

top related