    NICMAR - SODE

    ASSIGNMENT

    GRADUATE PROGRAMME IN CONSTRUCTION PROJECT MANAGEMENT (GPPM)

    MODULE - 18

    CONSTRUCTION PERSONNEL MANAGEMENT

    NCP 22

  • 8/22/2019 Ncp 2222

    2/17

    Assignment

    1 Course No - NCP 22

    2 Course Title - Construction Personnel Management

    3 Assignment No - One

    4 Date of Dispatch - August 16,2012

    5

    Last Date of Receipt of Assignment at

    CODE Office

    - August 25, 2012

    ASSIGNMENT:You are a Project Manager on site where work for 3 Km long Tunnel has been undertaken.

    The site is remote and takes about 2 days travel to nearest town. Supervisors, technicians & skilled

    workers are engaged in dangerous / hazardous work. Absenteeism due to sickness, quarrels, drinking are

    adding to less output of work and chances of accidents on site are increasing. Management has urged to do

    something so that time targets can be achieved. Discuss how will you tackle the problem and increase the

    output of work.

  • 8/22/2019 Ncp 2222

    3/17

    Introduction of Main Problem:

    1. Working condition at remote location.2. Less productivity & irregularity of workman hampering the project progress.3. Involvement of Dangerous / hazardous activity4. Absence due to sickness.5. Absence due to quarrels & drinks.6. Accidents at site.

    Reasons of Various Problems:

    1. Involvement of High risk construction activity2. Improper Manpower Management Planning & absenteeism of workmen.3. Un-Hygienic surroundings & Temporary Accommodation4. Non availability of Medical facilities at the vicinity of the project Site5. Availability of Alcohol & Consumption of Alcohol by the Labours6. Work related risk of rural construction workers.

    Needs & Their Fulfilments on Site:

  • 8/22/2019 Ncp 2222

    4/17

    1. Involvement of High risk construction activityProper construction methodology is to be established prior to starting of activity. Design stability to be ensured for

    each supporting / enabling works. Identify risk involvement of each project related activity and their impact.

    Highlight / intimate risk identified and collect the suitable economical suggestion through conducting inter

    brainstorming or consultancy from out side. Involvement of human resource to be minimized by identifying

    alternative automated methods. Explore the possibilities of engagement of modern technology applicable for the

    project work. Ensuring the good condition of the machinery involved. Prepare methodology statement

    understandable for frontline supervisor / technician who have more practical knowledge but less theoretical

    knowledge.

    Recommendation for dangerous and hazardous constructing activity:

    o Ensure Preparation of proper construction methodology prior to start.o Conduct training for the supervisor / technician on the methodology adopted.o Identifying more automated method for carrying out the construction activity.o Engage more machinery and reduce manpower involvement as much as possible.o Keep equipment in good condition.o Ensure the stability of the enabling structure.o Regular conduct training for workmen engaged for particular activity.

    2. Improper Manpower Management Planning & absenteeism of workmen:Preparation of a proper schedule of Project and assign resources to each task i.e. each activity, Assigning

    resources means identify manpower required for each Task and what is the availability of manpower and how

    much work has been done till date and how much work is to be done. Identify type of manpower required i.e.

    Skilled or unskilled. If manpower is in adequate try to get more manpower or try to use the available

    manpower fully so that maximum amount of work to complete and try to complete the urgent works such that

    it does not effect our project duration, reschedule the project and update schedule to head office and inform

    them weekly work progress so that they can help you to overcome the manpower problem or try to motivate

    the available manpower by giving extra benefits if they complete the project in time or if manpower is very less

  • 8/22/2019 Ncp 2222

    5/17

    than required then immediately inform head office so that they can send some more manpower so that the

    project can run smoothly

    Recommendation for Manpower Management Planning:

    o Manpower planning involved some of steps project manager has to follow the same for engagement ofmanpower, because the Tunnel project is a large project more number of manpower is involved in the

    project .

    o Developing source of manpower supply for all categories of manpower.o Understanding the project in all respect and get all details of the project i.e Site condition, contract

    conditions, technical specifications, construction techniques, and time frame

    o Working out the labour component in various parameter of the project, by using consultants to work outlabour requirement

    o Classifying and categorising labour requirement and various jobs by level of skill, responsibility, nature ofwork etc.

    o Estimation of manpower required in view of the anticipated of absenteeism and labour turnover and thestability factor.

    o Ensure the guideline set by the organization for engagement of manpower to be followed.The guiding principles are as follows:

    o Care and skill should be exercised in the selection of employees.o Introduction to the job should be friendly skilful and adequate.o Each employee should be made of feel that his efforts are really appreciated.o Consideration should be given to the effect that each rule and instruction may have on the feelings of

    employees.

    o There should be sense of security and reasonable freedom from worryo Employees should have a part in planning those things that affect their working conditions.o Management should be absolutely fair in every policy every practice.o Each employee should have a feeling of pride in the worthwhileness of his work and his company.

  • 8/22/2019 Ncp 2222

    6/17

    3. Un-Hygienic surrounding & Temporary Accommodation:Before starting of the project management has to well plan because this project is long duration so manpower

    involved will be more it is the one of the preliminary need for the employees & workers.

    Un-Hygienic surrounding observed in the project sites are as follows:

    a. Poor drainage condition resulting stagnant water causing growth of mosquito, which develop thepossibilities of malaria of workmen.

    b. Shallow tube oil for drinking water resulting water diseases.c. Improper toilet & latrine facilities for workmen.d. Inadequate space for leaving.e. Cooking facilities not available towards labour hutf. Canteen for food not allotted to labours.g. Cleaning of wast material from the colony area.

    Suggestion Methods for Hygiene Factors:

    Management has to well plan for the temporary shelters in such a way that number of workers will be involved

    in the project and how many shelters are required and for different category of employees will be working at

    site and different facility what all materials required for construction any how much time required to construct

    it so that all those thing should be completed before starting of project, Management should built temporary

    shelters for the workers who will be working at site because the site is at remote area workers cannot be able

    to say at there and come for work it is the preliminary requirement for the workers so management has to

    take extra precautions, A site office also built with all necessary requirements, drinking water should be good

    because most of diseases are spread by water so it is important step to taken care by management.

    4. Non availability of Medical facilities at the vicinity of the project SiteManagement should send a medical team to site and they should stay there till completion of project, they

    should be supplied necessary equipment and medical kits so that they can manage any hazardous situation i.e.

    any sudden accidents they can over come that situation, any epidemic occurred they can over come that

  • 8/22/2019 Ncp 2222

    7/17

    situation. By this work will be smoothly progressed and number of workers absenteeism will be reduced.

    Worker who is sick will be taken care by medical team he will be recovered quickly and he can start doing the

    work so that manpower problem is solved.

    5. Availability of Alcohol & Consumption of Alcohol by the Labours:This is the major problem with labour because they drink daily after work so that they get some relief from

    whole days work and body pains, but management should try to avoid drinking alcohol or try to get them in

    limited dose so that they have it in just go for sleep if they get it in excess quantities they will be drinking whole

    night and next day they will be absenteeism and also after excess drinking they start quarrelling between

    themselves its a big problem for the project manager while quarrelling their may be any accidents that leads

    to more absenteeism that will also indirectly effect the progress of project. If this quarrelling happens regularly

    then management has to take some precaution steps to handle that problem. Such as try to avoid the

    availability of alcohol near the site so that the labour cannot consume much alcohol and this problem is solved

    and the project may continue smoothly.

    6. Work related risk of rural construction workers.The workers are vulnerable not only because they are rural workers who do not enjoy the same equal

    social protection as their urban counterparts. They are vulnerable also because they work in the

    construction industry which brings with it a set of risks that are particularly serious for construction

    workers. They are also migrants who are not yet fully integrated into urban life and keep distinctive

    lifestyles. Therefore, even if the state policy intends to extend the formal social security schemes to

    these workers, a combination of work related risks, and social risks and personal understanding of the

    risks, often expressed with their status as rural-urban migrants, may lead to the failure of a simple

    extension of social security. To understand the challenges better, it is important to distinguish work

    related and status related risks that affect the livelihoods of these workers.

    o Some subcontractors deliberately hold the money for a long time to earn interest. When asubcontractor mainly hires workers from his home village or county, he is more likely to behave in a

  • 8/22/2019 Ncp 2222

    8/17

    more responsible way, as he has to face the pressure back at home. Late or missing pay is more

    frequent when a subcontractor hires people from outside his home county.

    o Another work related risk is injuries. Construction work involves hard labour and operation of heavyequipment. Industrial accidents are frequent, especially among poorly trained and inexperienced

    workers

    Measures to minimize the work related risk:

    o Ensure time release of labour payment and monitor actual payment towards labour involved.o Ensure safety standard for protection against industrial injuries.

    Motivation of Employees in Construction Project:

    Motivation is the driving force within individuals that drive them physiologically and psychologically to pursue

    one or more goals to fulfil their needs or expectations. Motivators may be intrinsic or extrinsic. An example of

    an intrinsic motivator is the self-fulfilment of a worker as a result of performing a task well.

    Motivation of labour in Construction Project:

    Construction labour can be motivated. This is important because dwindling productivity is a major problem confronting

    construction today. Productivity has decreased every year for the past decade, in part because of increasing design

    complexity, more rigorous federal and state regulations and socio-economic changes affecting the work force. Our

    findings indicate that a highly motivated workforce enhances productivity and project effectiveness.

    In construction, the work itself that is, the building of a structure for all to behold is a key motivator for all levels of

    management and the work force. Therefore, a well planned project seems to be the first and most important step to

    achieve good productivity. Unfortunately, on large industrial projects, craftsmen often receive only minimal amounts

    of information about their work . Duplication of effort, numerous modifications to plans, schedules that consistently

    slip makes it difficult to maintain a motivated workforce. On large power plant projects, changes in design and

  • 8/22/2019 Ncp 2222

    9/17

    problems with material availability are considered the major demotivating factors. With effective pre-planning, the

    availability of materials will be checked before workers are assigned to an area so workers do not start in one location

    only to have to be shifted to another location, Care in this respect should improve worker motivation and productivity

    and help promote a high level of accomplishment. Most foremen are craftsmen take considerable pride in the work

    they do. Having to rip out their work and redo it can be extremely discomforting. In fact, if it is extensive, redoing parts

    of a project may be the worst de-motivator of all. Craftsmen view overcrowded conditions and crew interference due

    to extensive rework as de-motivating. Worse, such problems can create hostile feelings as a result of the frustration.

    Design standardization can help to minimize rework and improve morale.

    Motivational Programs:

    Although some unique motivational programs were found, the vast majority can be grouped into five primary

    categories: goal setting, incentives, positive reinforcement (i.e., recognition for a job well done), worker participation,

    and work facilitation. The following presents a dissertation on each of the five categories discussing first their use in

    other industries and then their application to construction.

    Motivational Technique:

    The motivational techniques are as follows:

    1. A letter of praise from a customer shared directly with the employee who delivered the service.

    2. Provide training to employees. Offer them opportunities to improve themselves.

    3. Involve employees in decisions that directly affect them.

    4. Special Wage increase should be given to employees who do their jobs well.

    5. Provide better job descriptions so that employees will know exactly what is expected of them.

    6. Individual incentive bonuses based upon values that need to be reinforced.

  • 8/22/2019 Ncp 2222

    10/17

    7. Having good equipment to work with. Good working conditions.

    8. Being trustworthy and respectable.

    9. Job security

    10. Feedback should be constructive and timely.

    Welfare Amenities:

    To mitigate desire productivity the welfare amenities should be ensured towards workmen. The following welfare

    amenities at site for use of workers at scale and standards prescribed below

    1. Canteen2. Rest rooms3. Night Shelter4. Clean drinking water5. Latrines and urinals6. Washing facilities7. First aid facilities8. Housing9. Crche

    Absenteeism and Turnover:

    The department of Energy study indicated that the absenteeism and turnover are a relatively minor concern to

    workmen. Still, they can have a major impact on total project productivity. High rates of absenteeism are a concern,

    however, to individuals who had to carry extra workloads to compensate for missing crewmembers.

  • 8/22/2019 Ncp 2222

    11/17

    The low job satisfaction resulted in high absence from work and high turnover. Thus absenteeism and turnover can be

    viewed as effects of motivational activities or de-motivational concerns. The cost of motivational programs is often by

    the reduced absenteeism and turnover.

    For example the cost of M2 group Engineering Private Ltd. Big Designing & construction company on eight projects has

    been more than paid for by the reduction in absenteeism and the reduced costs associated with hiring some amount

    per employee to process paper work plus two to three weeks of each new employees time to learn the job. Again, the

    figures on attendance and turnover measure the motivational effort that is finally justified. Moreover, awards for good

    records are perhaps the most effective method to decrease absenteeism.

    Recommendation to Management: Considering the project analysis and feasibility study made the following

    recommendation extended towards management -

    1. Deployment of consultant for construction method finalization.2. Deployment of Doctor and fast aid centre with adequate medicine facilities.3. Arrangement of periodic medical check-up for labours4. Proper screening for labour prior to engage them in risk job.5. Technical knowledge to be screened for workers.6. Identifying more resource pull for workers.7. Promoting motivational scheme for labours8. Incentive scheme to be implemented for enhancing motivation towards work.9. Special care to be taken in account of hygienic aspect of labour hut.10.Separate gang to be deployed for maintenance of labour colony.11.Remote allowance can be introduce for labours.

    Bibliography :

    1. A Guide to the Project Management Body of Knowledge. William R.Duncan2. Management in organization by Koontz and Odoneal, MacGraw Hill3. Construction Personnel Management for Construction Industry Managers SODE, NICMAR.4. ASSIGNMENT5.

  • 8/22/2019 Ncp 2222

    12/17

    6. NICMAR /SODE OFFICE7.

    8. 1. PROGRAMME : GRADUATE PROGRAMME INCONSTRUCTION PROJECT MANAGEMENT

    9.10.11.2. COURSE : MODULE # 1812.13.14.3. COURSE TITLE : MATERIALS & EQUIPMENT MANAGEMENT15.16.17.4. COURSE No : NCP-24/2518.19.20.5. REG No : 211-08-14-9831-213121.22.23.24.25.26.27.A) Overview of Contract:28. Developing & Constructing New International Airport29.B) Key Scope of works:30. Cutting, Excavation & Dozing of 100,000 M331. Disposal of surplus earth 20,000 m332. Imported materials filling33. Filling of sand 3000 m3 including spreading & leveling34. Road work including procurement of 1,50,000 liters of Bitumen35.C) Main Constraints:36. The proposed project is 30 KM away from the main city.37. The project is to be constructed in two Phase, and first phase to be completed i

    n 100 days.38. Mobilization of Equipment & properutilization39. Identification of agencies for supplying of sand from 20 km and work including s

    preading & leveling

    40. Procurement of Bitumen 1,50,000 liters from Assam which is having lead timeof 4

    41.5 days.42. Storage facility available at site only for 50,000 liters43.D) Tentative programme for the work:44.Excavation of 100,000 m3 earth to be completed in 50 days. Per day approximately45.-2,000 m3 to be excavated so that we can complete the excavation work in 50

    day46.s47.48.E) Cost working for Excavation works49.Selection of equipment a) Excavatorwith bucket Komatsu PC 200 productivity

    60050.m3/per day considered.51.Option -1 - Cost working for PC 200:52.1. Hire charges per Hour Rs.850.00 rate for 10 hrs = 8,50053.2. Cost of Diesel 7 litres per hour @ 70 Rs per litre considered for 10 hrs54.= 4,90055.3. Operatorwages included56.4. Operator food, accommodation & transport per day =Rs.30057.5. Wages for Banks man Rs.40058.TOTAL COST PERDAY = RS.14,100 X 4 Excavators required = Rs.56,400 per day and t59.otal cost estimated for 50 days is 56,400 x 50 = Rs.28.20 lacs

  • 8/22/2019 Ncp 2222

    13/17

    60.Selection of equipment b) Excavator with bucket Komatsu PC 400 productivity 800m3/per day considered.Option -2 - Cost working forPC 400:1. Hire charges per Hour Rs.1200.00 rate for 10 hrs = 12,000

    61.2. Cost of Diesel 10 litres per hour @ 70 Rs per litre considered for 10 hr62.s = 7,00063.3. Operatorwages included64.4. Operator food, accommodation & transport per day =Rs.30065.5. Wages for Banks man Rs.40066.TOTAL COST PERDAY = RS.19,700 X 2.5 (2 + 1 Excavator 10 days) Excavators requir67.ed = Rs.49,250 per day and total cost estimated for 45 days is 49,250 x 45 = Rs.68.

    22.16lacs

    69.Selection of equipment c) Excavatorwith bucket productivity 300 m3/per daycons

    70.idered.71.Option -3 - Cost working for HITACHI EX-220:72.1. Hire charges per Hour Rs.600.00 rate for 10 hrs = 6,00073.2. Cost of Diesel 5 litres per hour @ 70 Rs per litre considered for 10 hrs74.= 3,50075.3. Operatorwages included76.4. Operator food, accommodation & transport per day =Rs.30077.5. Wages for Banks man Rs.40078.TOTAL COST PERDAY = RS.10,200 X 6 Excavators required = Rs.61,200 per day and t79.otal cost estimated for 56 days is 49,250 x 45 = Rs.34.27 lacs80.

    F) Cost working for Disposal works81.Selection of equipment Dozer 1 No, Wheel loader 1 Nos, Tipper truck 18 m3capac

    82.ity considering 800 m3 disposal of surplus earth/per day and completing the work83.by 25 days84.1) Hire charges for Dozer 1 Nos per Hour Rs.600.00 rate for 10 hrs =

    8,00085.2) Hire charges for Wheel loader1 No per Hour Rs.600.00 rate for 10 hrs =

    6,086.0087.3) Hire charges for Tipper8No per Hour Rs.400.00 rate for 10 hrs = 32,00088.4) Cost of Diesel 5 litres per hour each @ 70 Rs per litre considered for 189.0 hrs = 35,00090.5) Operator wages included91.6) Operator food, accommodation & transport per day =Rs.30092.7) Wages for Banks man Rs.80093.TOTAL COST PERDAY = Rs.84,200 per day and total cost estimated for 25 days is =

    94.Rs.21.20 lacs, unit rate arrived for 20,000 m3 is Rs.106/m3 also by usingthe s

    95.ame equipments can be used for removing & stocking the balance required earth at96.nearby site area.97.98.99.100.101.102. G) Cost working for sand Filling103. Supply of Sand as per specification by local supplierand spreading &leveling b104. y dept.(own) considered.105. 1. Supply of sand including transportation delivery at site 18 m3 Truck

    Rs.106. 6,000.00 rate for 18 m3 =per m3 Rs.6,000/18 =Rs.333/m3107. 2. Cost of Showel for spreading & leveling the sand Depreciation cost

    Rs.266108. per day x 15 days considered= Rs.3,990, per day 200 m3 productivity

    taken, cost109. per m3 = 19.95 Rs.110. 3. Operatorwages per month Rs.20,000 per month required for 15

    days, cost

    111. per m3 = 10,000/200 =Rs.50/m3

  • 8/22/2019 Ncp 2222

    14/17

    112. 4. Diesel charges 4 ltrs per hour x Rs.70/ltr =Rs.280 x 10 hrs =Rs.2,800/2

    113. 00 =Rs.14/m3 considered.114. 5. Water tanker 5,000 gallons Rs.2,600/trip = 2,600/200 = Rs.13/m3

    considere115. d116. 6. Compaction using plate compactor/roller = Rs.500/day = Rs.2.50/m3117. 7. Operator food, accommodation & transport per day =Rs.300/200=1.50/m3

  • 8/22/2019 Ncp 2222

    15/17

    118. 8) Wages for labour for compaction Rs.800/per day,800/200 =Rs.4.00/m3

    119. TOTAL COST = Rs.437.95/m3 x total qty 3,000 m3 = Rs.13.14 lacs.120. H) BOQ for Bitumen Pavement121. Surface dressing & preparation122. Penetration grouting semi grouting/full grouting123. Premix carpet/Seal Coat124. Hot mixed bituminous macadam125.126.127.128. I) Cost Working for Bitumen work129. Surface dressing & preparation:130. Considering Total qty of area is 100 m x 20 m width = 2,000 m2 will be

    started o131. n 60th day as per programme.132. 1. Cost of Showel for spreading & leveling the earth Depreciation

    cost Rs.26133. 6 per day x 10 days considered= Rs.2,660134. 2. Operatorwages per month Rs.20,000 per month required for 10

    days, cost135. =Rs.6,666136. 3. Diesel charges 4 liters per hour x Rs.70/ltr =Rs.280 x 10 hrs =

    Rs.28,00137. 0.138. 4. Compaction using plate compactor/roller = Rs.8000/day = Rs.80,000139. 5. Operator food, accommodation & transport per day =Rs.300140. TOTAL COST = Rs.1.17 lacs.141. Spraying of metal & bitumen mix in two layers:142. 1. Supply cost for bitumen to be procured from Bongaingaon in Assam

    1,50,00143. 0 liters @ Rs.20/liters considered cost for total qty = 30.00 Lacs144. 2. Transportation cost per liters Rs.5.00/Litre = 7.50 Lacs145. 3. Wastages 10% = 30 + 7.5 = 37.5 * 10% = 3.75 Lacs146. 4. Stocking & shifting to site Rs.1.00/litre =1.50 Lacs147. 5. Cost of 10-20 mm metal delivery at site for 2000 m2 x 0.2 mtr ht

    = 400 m

    148.

    3 @ 600 rs/m3 = 2.400 Lacs149. 6. Wastages 10% = 0.24 Lacs150. 7. Cost of Hot mix plant Depreciation cost = Rs.4500/day x 40 days

    required151. -1.80 Lacs152. 8. Transportation of hot bituminous mix through tipper truck

    Rs.4000/day in153. cluding driver & diesel charges x 40 days =1.60 Lacs154. 9. Spreading & Laying by using paver Depreciation cost Rs.8,000per

    day cos155. t for40 days is = 3.20 Lacs156. 10. Operator wages per month Rs.20,000 per month required for 40

    days, cost=

    157. Rs.27,000 x 4 operators = 1.08 Lacs158. 11. Diesel charges 10 liters per hour x Rs.70/ltr =Rs.7000 x 40 days= Rs.2

    159. .80 Lacs160. 12. Compaction using roller 10 Ton Rs.8000/day x 40 days = Rs.3.20

    Lacs161. 13. Operator food, accommodation & transport per day =Rs.300 x 8 =

    2,400 x 4162. 0 days 0.960 Lacs163. TOTAL COST = Rs.59.07 lacs.164. J) Purchase Order Schedule165. 1. Supply of Bitumen from assam including transportation & delivery

    at site

    166. for the total qty 1st day delivery

  • 8/22/2019 Ncp 2222

    16/17

    in two lots167. 2. Delivery of 1st lot will be received on 46th day168. 3. Delivery of 2nd lot will be received on 60th day169. 4. Order for supply of sand, metal to be done on 1st week170. K) Programme Outline171. Total scope will be executed in two parts172. 1. Part -1173. 1. Excavation, Dozing & disposal of surplus earth 1 to 25th day174. 2. Imported materials & Sand filling start from 10th Day 25th

    days175. 3. Surface preparation, leveling and compaction 26th to 46th days176. 4. Metal spreading 46th day to 60th day177. 5. Bitumen pavement 61st day to 80th day

  • 8/22/2019 Ncp 2222

    17/17

    178. 2. Part -2179. 1. Excavation, Dozing & disposal of surplus earth 26th to 50th

    day180. 2. Imported materials & Sand filling start from 26th Day 46th

    day181. 3. Surface preparation, leveling and compaction 47th day to 65th

    days182. 4. Metal spreading 66th day to 80th day183. 5. Bitumen pavement 81st day to 100th day184.185. L) Cost Summary:186. 1. Cost for Excavation works = Rs.22.16 Lacs187. 2. Cost for Disposal works = Rs. 21.20 Lacs188. 3. Sand Filling = Rs.13.14 Lacs189. 4. Cost of Bitumen Pavement = Rs.60.24 Lacs190. GRAND TOTAL COST = 116.74 Lacs191.192.193.194. M) Bitumen ordering Plan:195.

    Note: Average daily consumption of bitumen is 3750 Ltrs.

    Asafety stockof 3 day

    196. s consumption is always maintained.197.198. N) Bitumen Inventory chart:199.200.201. O) Bitumen Logistic Plan:202. 1. Bitumen shall be supplied in drums, each drum containing 200

    Ltrs.203. 2. It willbe carried in trucks /long trailers from the loading

    point and204. shall be unloaded at site with fork lift.205. 3. Each truck will carry 50 drums x 200 Ltrs = 10,000 Ltrs.206. 4. For each order qty of 30,000 Ltrs x 5 orders, 3 trucks per order

    shall b207. e engaged for bringing in bitumen from refinery to airport site.208. P) Recommendations /Conclusions:209. 1. As the project to be executed with in short duration and it is

    time boun210. d, all materials and equipments shall be mobilized as per the above plan

    and HO211. approvals on resources should not be delayed.212. 2. As bitumen is brought in from long distance and the lead time is

    more, i

    213. t

    is better to post a material expeditor and loading point for betterfollow up214. and ensuring timely delivery at site.215. Q) Bibliography:216. 1. NICMAR Lessson book Construction Equipment & Materials

    management.217. 2. Other miscellaneous hand books on construction equipments &

    materials.