  • 8/13/2019 Zohaid Ali

    1/18

    1 | P a g e

    INTERNSHIP REPORT ON

    STRENGTHNING OF KING EDWARD

    MEDICAL UNIVERSITY, LAHORE.

    A practical training report on STRENGTHNING OF KING EDWARD

    MEDICAL UNIVERSITY, LAHORE from 29 July 2013 to 14 September

    2013

    Submitted by

    Zohaid Ali

    BSCE-01103123

    Department of Civil Engineering

    THE UNIVERSITY OF LAHORE

  • 8/13/2019 Zohaid Ali

    2/18

    2 | P a g e

    Table of ContentsIntroduction of Project ............................................................................................................................ 5

    INTRODUCTION ................................................................................................................................... 5

    GENERAL INFORMATION ........................................................................................................................ 6

    Company Profile .................................................................................................................................. 7

    Some Major Projects of the company ............................................................................................ 7

    Current Project ................................................................................................................................ 7

    Competency Profile ......................................................................................................................... 7

    Scope of Project ...................................................................................................................................... 8

    Physical Progress of the Project .......................................................................................................... 8

    MATERIALS ............................................................................................................................................ 10

    Steel bars........................................................................................................................................... 10

    Sand................................................................................................................................................... 10

    Binder materials ................................................................................................................................ 10

    Water ................................................................................................................................................ 10

    Equipments ........................................................................................................................................... 11

    vibrator.................................................................................................Error! Bookmark not defined.

    Cylinders and cubes .......................................................................................................................... 11

    Concrete mixer .................................................................................................................................. 12

    Concrete lifter ................................................................................................................................... 12

    Instruments to install the steel cabins .............................................................................................. 12

    Wheel barrows .................................................................................................................................. 13

    Shuttering and Frame work .............................................................................................................. 13

    Water Tanks ...................................................................................................................................... 13

    Construction Management ................................................................................................................... 13

    Basic Concept .................................................................................................................................... 13Selection usage of technology & method ......................................................................................... 14

    Work task .......................................................................................................................................... 14

    Relationship among different work activities ................................................................................... 14

    Estimation of duration of work activities. ......................................................................................... 14

    Requirements of resources ............................................................................................................... 14

    Safety ................................................................................................................................................ 15

    Dome ..................................................................................................................................................... 16

    Conclusions ........................................................................................................................................... 18

  • 8/13/2019 Zohaid Ali

    3/18

    3 | P a g e

    ABSTRACT

    This report is submitted for the requirements of the degree of Bachelor of

    Science in civil engineering.

    This report is a summer internship report submitted in partial fulfillment of the

    requirements for the degree of Bachelor of Science in civil engineering as per

    norms of the University of Lahore.

    I visited the site for construction of King Edward medical university, Lahore in

    my training period and attained technical knowledge during the project. Andafter that i was able to compile this report.

    The report consists of brief study and description of material, equipments and

    procedures used at site for construction of King Edward medical university.

    I have put my best to elaborate the actual site conditions, the problems faced

    there and the tactics used to tackle those problems.

    The main objective of this report is to tell about the execution for constructionof King Edward medical university. The report also covers the basic aspects of

    safety, planning, feasibility and economy at the construction site.

  • 8/13/2019 Zohaid Ali

    4/18

    4 | P a g e

    ACKNOWLEDGMENTI would like to thank prof. Zulfiqar Ali Khan HOD of civil engineering

    department for permitting me to carry out this training.

    I would also like to thank Mr. Basit sultan (Site engineer at the project) for

    providing me the guidance and teaching me the methodologies to carry out

    construction in the most efficient manner.

    Finally but importantly, I would like to express my heartiest thanks to my

    parents for their blessings, my friends/classmates for their help and wishes for

    the successful completion of this training.

  • 8/13/2019 Zohaid Ali

    5/18

    5 | P a g e

    Introduction of Project

    INTRODUCTION

    Tender Documents prepared by the Consultants were issued to pre-qualified

    contractors. These were received and opened by the Committee in office of the

    Project Director (KEMU), Lahore on 22.06.2010. After detail scrutiny and

    recommendation by the Consultants the work was awarded to lowest bidder i.e. M/s.

    Progressive International, Lahore on 26.06.2010.

  • 8/13/2019 Zohaid Ali

    6/18

    6 | P a g e

    GENERAL INFORMATION

    Project Strengthening of King Edward Medical

    University, Lahore

    Location Patiala Block, Lahore

    Plot Area 7 Kanal

    Covered Area 89,511 Sft.

    Date of Start 1stJune, 2011

    Date of Completion Two yearsJune 2013

    Contract Value Rs. 228,621,989/-

    Owner King Edward Medical University, Lahore.

    Consultants Pakistan Environmental Planning &

    Architectural Consultants (Private) Limited,Islamabad (PEPAC)

    Top Supervision Project Director, King Edward Medical

    University, Lahore.

    Contractor M/s. Progressive International, Lahore.

  • 8/13/2019 Zohaid Ali

    7/18

    7 | P a g e

    Company Profile

    This construction firm named as Hafiz Akhter was established in august 1997,

    and it is the construction firms of Pakistan.

    Name of the owner of the company is Mr. Hafiz Akhtar running this company.

    Some Major Projects of the company

    Construction of GILLANI LAW COLLEGE MULTAN. Construction of Highway.

    Current Project

    Construction of new block in King Edward medical university.Competency Profile

    This construction firm is categorized as A class contractors in the PECrankings.

    Company has more than 170 dumpers in working condition. Company has hired permanent skilled labor. Maintenance of the machineries is very good. Company has covered many mega projects all across PAKISTAN. Company plays a major role in providing job opportunities all over

    PAKISTAN. And that is a very positive sign for PAKISTAN.

    Company has a very vast experience in the construction of roads. Company is having very experienced skilled staff which is a good asset

    for the company, and it has increased its reputation a lot.

  • 8/13/2019 Zohaid Ali

    8/18

    8 | P a g e

    Scope of Project

    Construction of new block in King Edward medical university. Construction Auditorium. Class rooms. Construction of Office Rooms and Canteen. Construction of basement for car parking. Provision of Street Lights. Provision of Tuff Tiles in Parking and Shopping Areas. Total Cost Rs. 228,621,989/- Time for Completion of work of completion in 2 years. Executing Agency: Works & Services Dept. king Edward medical

    university.

    Physical Progress of the Project

    Up to 4thfloor of building completed. Basement and auditorium completed. Temporary offices completed. 4thslab and 5thfloor were in progress. Finishing of auditorium completed. Steels are laded by workers. Concrete pouring to be made. Dome were in progress

  • 8/13/2019 Zohaid Ali

    9/18

    9 | P a g e

    Figure showing pouring of concrete and steel in 4thslab.

  • 8/13/2019 Zohaid Ali

    10/18

    10 | P a g e

    MATERIALS

    Steel bars

    Steel bars are laded in 8in thick slab

    Sand

    Sand was used to make cement paste which was used for construction.

    Binder materials

    These materials were used as a binder material such as cement and

    concrete.

    Water

    Water is used to make a paste of cement and sand. And it is also used

    to make concrete. It is very necessary to maintain the required strength

    of concrete and to control the hydration of concrete. It is a major

    component to improve workability.

  • 8/13/2019 Zohaid Ali

    11/18

    11 | P a g e

    Equipments

    Vibrator

    Vibrator were used for removing of air from concrete.

    Cylinders and cubes

    These are used for compression test of concrete before pouring infield.

  • 8/13/2019 Zohaid Ali

    12/18

    12 | P a g e

    Concrete mixer

    Mixing of concrete were done by concrete mixer.

    Concrete lifter

    After mixing of concrete lifter were used to lift the concrete up to top

    Instruments to install the steel cabins

    These instruments were used to install and fix the steel cabins at site.

  • 8/13/2019 Zohaid Ali

    13/18

    13 | P a g e

    Wheel barrows

    Shuttering and Frame work

    Shuttering and frame work was used to construct the buildings of

    beams, columns and slab.

    Water Tanks

    Water tanks were there to store and use water.

    Construction Management

    Basic Concept

    Construction planning is a fundamental and challenging activity in the

    management and execution of construction projects. It involves the

    choice of technology, the definition of work tasks and many other

    things. An effective construction plan is the base for the development

  • 8/13/2019 Zohaid Ali

    14/18

  • 8/13/2019 Zohaid Ali

    15/18

    15 | P a g e

    Safety

    Following safety measures should be carried out on the construction

    site.

    There should be hard hats on site. There should be eye protection on site. There should be hearing protection near loud equipment. There should be safety shoes for workers. There should be proper first aid at the site.

  • 8/13/2019 Zohaid Ali

    16/18

    16 | P a g e

    Dome

    At that time construction of dome was in progress. All the details of dome

    are given

  • 8/13/2019 Zohaid Ali

    17/18

    17 | P a g e

  • 8/13/2019 Zohaid Ali

    18/18

    18 | P a g e

    Conclusions

    I worked there and I felt that my working abilities and my skill level has

    improved and groomed a lot and that is a very positive sign for me. I gained the

    experience to study keeping in mind the actual field so that I can implement my

    knowledge in a very effective way in the field.

    Main deficiency in the project was proper planning and planning lacks in almost

    all the projects all over the PAKISTAN. And that causes major delays in the

    duration of the projects. And safety measurements very also not taken very

    effectively, and that can cause a permanent disability or a life of any person, and

    that can be very shameful.

    This experience was very helpful for me and I gained much more knowledge

    through it. I understood the working process in the actual field and I came to

    know the actual relationship between contractor, client and consultant. I felt that

    actual working in the field was a bit different from studies. I observed proper

    application of knowledge which I gained during studies in the field and I was

    very happy after seeing that.

    I also got experience in slabs and beams designing. Many of the slab and beam

    were design by engineer. I saw different section of beams in which steel bars

    were laid at both sides. Stirrups were provided. 8 inch thick slab were designed.The most I got experience is about domes. At that time dome construction were

    in process. Which was placed on the beam. All load of dome was transferred to

    beams. No such load was placed on slab of dome.

    I personally think that there should be a full semester in which student can get

    exposure of the field. And there should be proper grading for that so that each

    and every student can pay full attention in the field work. I gained so much

    experience in just one moth thats why I think that a full semester would be very

    helpful for that purpose. I obtained very much experience of public dealing. I

    learnt that how to deal with a labor and a higher authority person. I learnt so

    many thing s which would be very helpful in my future and my career.

    Major change in me that my understanding was improved a lot. And my

    coordination was also groomed to another level.