EXPERIENCE

Brief Description- My 5 years work experience encompasses Thermal Power Project, Oil & gas and Fire Fighting Piping, Oil Tank Modification Projects which involves Turbuine, Generator and Auxiliary Equipment, Low Pressure Piping, Critical Pressure Piping, Tank Modification and Hyrdrant Piping, Maintenance and Erection Job profile. My job profile belongs to technical & Managerial functions.

I am also open to work in sectors which are new to my work experience to add another dimension to my career like Renewable Energy Project, Infrastructure Development Project, Manufacturing and Maintenance.

COMPANY SITE- INCHARGE Thermosystems Pvt.Ltd since Sep'2015 to present PROJECT Tank Modification Project at Hindustan Petroleum Corporation Limited, Jaipur (Rajasthan) WORK EXPERIENCE

Preparation of schedule of technical and field activity of project.Ensuring the availability of material, required tools & tackles and the execution of job as per job specifications and project schedule.

Maintenance of Tanks and Pipeline of petroleum product conducted when defect observed at pipe, welded joints, flange connections and various auxilliaries in the pipeline. Also, consider the life span of pipeline and get it replaced when needed.

Execution and inspection of Hydro-Testing“which is performed to determine the strength of material, welded joints and leak proofness of joints” and Roof Floating Test of Oil (Petroleum product) Tanks.

Tank Modification Job involves activities like making a hole in Tank Pontoon then welding a sleeve pipe with Pontoon.Now, pontoon leakage detection test conducted and a pipe installed through the sleeve Pipe vertically upto tank height by fixing it from tank shell wall through supporting structure at top and bottom of tank. There is arrangement of various nozzle at top of pipe flange on which sensing gauges installed.

Knowledge of analysing and conducting inspection of First Angle Drawing. Experienced with the preparation cum maintenance of welders performance qualification

record. Familiar with and hands on with most measuring/inspection tools. Record Keeping and inspection of Quality of shot blasting “which is performed to produce

clean and abrasive surface”, painting of pipe, Joint Fit-Up of lap-joint, butt-joint, SMAW

Page 1

Page 2: Siddharth_resume_Engg

SIDDHARTH SINGH

Welding and Dye Penetration Test which is performed at first-run of welding in order to detect the surface defect of welding as per standard specifications provided.

Preparing & Raising Material Supply & Erection bill Invoice to client and get it approved for clearance.

Monitoring the activities of contractor for work Progress, worker welfare and Material availability at Project.

COMPANY SITE- INCHARGE Thermosystems Pvt.Ltd since Aug'2014 to Sep’2015 PROJECT MBLC Fire Fighting Project at Hindustan Petroleum Corporation Limited, Mughalsarai (U.P) WORK EXPERIENCE

Management of resources for unhindered work progress and execution of technical & field activities at site as per standard specifications and Project schedule.

Hydrant Piping Job (above ground) involves activities like erection and welding of Pipe on pedestals which connect the water tank to pupms.To control the flow through pipeline various valves installed on pipe.

Ensure the fulfilment of duties of contractor as per contractor and work progress as per project schedule and standard specification.

There is also responsibility of ensuring labour welfare, material availability, record keeping and preparing & raising material supply & erection bill Invoice to client.

Inspection of Quality of Shot Blasting and Painting of Pipe, Joint Fit-Up Butt- Joint, SMAW Welding and Dye Penetration Test which is conducted to detect the surface defect of welding as per specification provided.

Installation & Dismantling of Gate Valves, NRV, Water Monitor Double Hydrant, and Jockey Pump.

The valve and pipeline connected by flange and welded connection. Prior installation, properly clean the mating surface of flanges then insert the gasket in order to achieve the leak proof connection otherwise the possibility of leakage is very high.

HPCL Depot terminal Pipeline Maintenance works performed when defect observed at pipe, welding joints, flange connection and various auxilliaries in the pipeline.Also, consider the life of pipeline and get it replaced when needed.

Hydrant Piping (under ground) job involves Holiday Testing of Wrapping of Pipe “which determine that there is no air gap between wrap material and pipe” and Hydro-Testing of Pipe “which is executed to determine the strength of material, welded joints and leak proofness of joints”prior laying it under the ground which is connected to the ends of pipe above ground.

Casting (Civilwork) of Foundations of pumps, Pedestals of pipeline.

COMPANY Engineer in BHEL (as a outsource through PCPIL) since Aug'2012 to Aug'2014PROJECT 3X660 MW Lalitpur Super Thermal Power Project of Bajaj Group, Lalitpur (U.P)WORK EXPERIENCE

Erection of Turbine and Generator, Critical Pressure Piping, Low Pressure Piping, Condenser and various Auxiliary equipments.

Tools and plant (T&P) maintenance and record keeping like 600 MT, 250 MT, 135 MT Cranes,Huck Bolting Machine, Induction Heating Machine, Hydro Pumps and Lube Oil Purifying

Page 2

Page 3: Siddharth_resume_Engg

SIDDHARTH SINGH

Machine etc. Inspection of dimensions and Position of embedments of TG Deck, Condenser foundation

and Auxiliary equipment foundation. Checking of Erection and Alignment of Auxiliary equipment such as Pumps, H.P heater, L.P

heater, Deareator etc. Installation and inspection of MOVs, SOV and Control Valves. The valve and pipeline

connected by flange and welded connection. Prior installation, properly clean the mating surface of flanges then insert the gasket in order to achieve the leak proof connection otherwise the possibility of leakage is very high

Checking of Bearing Pedestal erection and alignment for maintaining catenary of shaft of Turbine.

Execution and inspection of grouting of Bearing Pedestal and Auxiliaries as per specification provided by Manufacturer of grout cement and Quality documents.

Inspection of Bottom Plate, TSP, Sidewall, Hot well, Water Chamber, Water box and Dome wall Erection, Alignment, Fit-Up, and Weld Visual of condensate system.

Preparation of Erection schedule of L.P Piping, H.P Piping, auxilliary equipment, Turbine and Generator and conducting various inspection of Erection.

Knowledge of analysing and conducting inspection of First Angle Drawing. Familiar with and hands on with most measuring/inspection tools.

Fit-up Inspection of Joints in-process stage with respect to visual, dimensional and orientation compliance as per the approved drawings and specifications.

Welding inspection and familiar with most of the Welding Processes like SMAW, GTAW, GMAW, SAW for CS, SS, Mild steel, Cast iron etc.

Experienced with the preparation cum maintenance of welders performance qualification record and welders performance rating thro' welders and welding control log.

COMPANY Engineer in Velcrotech since 14th July' 2011 to July'2012PROJECT 2X300 MW Reliance Thermal Power Project, Butibori (M.H)WORK EXPERIENCE

Management and Execution of Erection of Fire Fighting Pipeline. Record Keeping and inspection of Joint Fit-Up of butt & lap joint, SMAW (Shield Metal Arc

Welding) Welding and Dye Penetration Test which is executed to detect surface defect of welding joint.

Installation & Dismantling of Gate Valves and NRV. The valve and pipeline connected by flange connection. Prior installation, properly clean the mating surface then insert the gasket in order to achieve the leak proof connection otherwise the possibility of leakage is very high.

Conducting Hydro-Testing “which is executed to determine the strength of material,welding joint and leak proof joint” and Holiday Testing “which determine the tightness of wrapping around the pipe and ensure there is no air gap between wrap material and pipe” of pipeline.

Maintenance works executed when leakage observed through pipe, welded joints, flange connection and various auxilliaries in the pipeline

Preparing Project Schedule, Conducting Field activity and preparing & Raising Erection Bill. Preparation of welder performance log sheet and job card.

Page 3

Page 4: Siddharth_resume_Engg

SIDDHARTH SINGH

ACADEMIC QUALIFICATIONS

GATE QUALIFIED 2013 - 98.50 Percentile 2012 - 92.93 Percentile

B -TECH. in ‘MECHANICAL ENGINEERING' from JSS ACADEMY OF TECHNICAL EDUCATION, NOIDA.

Institute Course Year Percentage JSSATE B.TECH 2007-2011 72%

PROJECTS

MAJOR PROJECT : STEERING CONTROLLED MOVEMENT OF HEADLIGHT OF A FOUR WHEELED VEHICLE

OBJECTIVE : To compensate the effect of blind angle during steering. Components used : Optical encoder, microcontroller, stepper motor, gears, control

boards. Mechanism used : Optical sensors precisely measure the steering wheel rotation and

transfer the same in Micro controller, which process the input data and give output in accordance with theProgram and actuate the stepper motor which attached with gears and they turn Head light as per the wheel movement either side of their straight ward position.

TRAINING DETAIL

SUMMER TRAINING : K. M. SUGAR MILLS, FAIZABAD IN JUNE 2010. PERIODS : Four weeks. MACHINES : Boiler and Turbine

FAVORITE SUBJECTS

Power Plant Engineering Applied Thermodynamics Hydraulic Machinery Strength Of Material

EXTRA-CURICULAR ACTIVITIES

Member of YANTRASHILP "THE MECHANICAL SOCIETY" of our College. Head of my college cricket team for the year 2007-2011. Organised the event for "YOUTH FOR A CAUSE" which is a cultural society of our college.

STRENGTH

Perseverance & Analytical Approach

Page 4

Page 5: Siddharth_resume_Engg

SIDDHARTH SINGH

Dedication Determined Optimism

PERSONAL DETAILS

Name : Siddharth SinghFather's Name : Shiv Pujan SinghDate of birth : 11-07-1988Gender : MaleMarital Status : SingleNationality : IndianReligion : HinduLanguage : English, HindiPermanent Address : V/P- Pilkhawan, Distt.- Faizabad, Pin- 224001Contact No. : 09785706526Passport No : N2196473

DECLARATION

I hereby declare that all the details furnished above are true to the best of my knowledge and belief.

Place: Jaipur SIDDHARTH SINGH

Date: 21-07-2016

Page 5