DMICDC DELHI-M UMB AI IN DUSTRI AL CORRI DOR  DEVELOPMENT CORPORATION LIMITED DMIC – ST A T U S &  OPPORTUNITIES Tokyo Febru ary 18, 2008 Haryana Rajasthan Gujarat Madhya Pradesh Uttar Pradesh Maharashtra Arabian Sea J.N.Port End Terminals DFC Alignment G-Q (NH-8) N-S & E-W NH Corridor Existing Passenger Rail Link (Delhi-Mumbai) Dadri

Upload: robinraj12

Post on 06-Apr-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 1/47

DMICDCDELHI-MUMBAI INDUSTRIAL CORRIDOR DEVELOPMENT CORPORATION LIMITED

DMIC –STATUS & 

OPPORTUNITIES

Tokyo

February 18, 2008

Haryana

Rajasthan

Gujarat

MadhyaPradesh

Uttar

Pradesh

Maharashtra

Arabian Sea

J.N.Port

End TerminalsDFC Alignment

G-Q (NH-8) N-S & E-W NH Corridor

Existing Passenger Rail Link (Delhi-Mumbai)

Dadri

Page 2: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 2/47

DMICDC

Brief Brief -- DMIC Project ConceptDMIC Project Concept

Page 3: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 3/47

DMICDC

1483 km long western dedicated freight corridor (DFC)

project between Delhi & Mumbai to be commissioned by

2012  An MOU was signed between MoCI and METI, Japan in

December, 2006 to create a framework for mutual

cooperation for the project

GOI initiated the DMIC to leverage the economic benefits

arising from the western dedicated freight corridor

GOI accorded ‘in principle’ approval to the DMIC Project

Outline in August, 2007

Background

Page 4: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 4/47DMICDC

Delhi-Mumbai Industrial Corridor (DMIC)

Focus is on ensuring high impact developments w ithin a band of 150kmon either side of alignment of DFC

Haryana

Rajasthan

GujaratMadhyaPradesh

Maharashtra

Arabian Sea

J.N.Port

End TerminalsDFC Alignment

G-Q (NH-8)N-S & E-W Corridors

Passenger Rail Link (Delhi-Mumbai)

DadriUttarPradesh

Arabian Sea

Dadri

J.N.Port

End TerminalsDFC Alignment

DFC Junctions Feeder Rail Links

Barmer Kota

Agra`

Barmer Kota

Delhi-Mumbai Passenger Rail Link

Haryana

Rajasthan

Maharashtra

Gujarat MadhyaPradesh

UttarPradesh

Page 5: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 5/47DMICDC

 “To create strong economic base with globally competitive environment

and state-of-the-art infrastructure to activate local commerce, enhance

foreign investments and attain sustainable development” 

Delhi-Mumbai Industrial Corridor is conceived to be developed as

 “global manufacturing and trading hub” supported by world class

infrastructure and enabling policy framework 

Project goals

Double employment potential in five years Triple industrial output in five years

Quadruple exports from the region in five years

Vision for DMIC

Page 6: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 6/47DMICDC

Infrastructure development- key to DMIC instead of additional fiscal or financialincentives

 A regional development approach instead of isolated pockets

The development strategy for the DMIC is based on the competitiveness of eachof the DMIC states : Development of high impact/market driven nodes at strategic locations in the

DMIC region while adopting holistic approach

Each Node will be self-sustained regions with world class infrastructure andenhanced connectivity to DFC, Ports, and Hinterlands

Market driven nodes are proposed to be in two categories Investment regions - ~ 200 sq km area (minimum)

Industrial areas - ~ 100Sqkm area (minimum)  A total of 24 nodes have been identified in consultation with state governments :

11 investment regions 13 industrial areas

Strategy for integrated development

Page 7: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 7/47DMICDC

Nodes for PhaseNodes for Phase--1 Development1 Development

Short listed investment regions:1) Dadri-Noida-Ghaziabad (Uttar Pradesh);2) Manesar-Bawal region (Haryana);3)

Khushkhera-Bhiwadi-Neemrana(Rajasthan);4) Bharuch-Dahej (Gujarat);5) Igatpuri-Nashik-Sinnar (Maharashtra);6) Pitampura-Dhar-Mhow(Madhya Pradesh)

Short listed industrial areas:a) Meerut-Muzaffarnagar (Uttar Pradesh)b) Faridabad-Palwal (Haryana)c) Jaipur-Dausa (Rajasthan);d)  Vadodara-Ankleshwar (Gujarat);e) Dighi Port (Maharashtra);f)

Nimach-Nayagaon (Madhya Pradesh)

Dadri

J.N.Port

Rajasthan

Maharashtra

Gujarat

Madhya

Pradesh

UttarPradesh

1

c

d

5

4

b

e

32

a

f

6

Haryana

DFC Alignment

Investment Region(Min.200SQKM)

Industrial Area (Min.100SQKM)

Page 8: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 8/47DMICDC

Components of each investment nodeComponents of each investment node

Industrial Infrastructure New industrial clusters/ parks/ SEZs Upgradation of existing industrial estates/clusters

Modern integrated agro-processing zones with allied infrastructure IT/ITES hubs and other allied infrastructure Efficient logistics chain with integrated multi-modal logistic hubs

Physical Infrastructure Knowledge cities / skill development centers with integrated approach  Augmentation of existing port infrastructure & Greenfield port

development; Upgradation/ modernization of airports; Power generation plants with transmission facilities; Feeder road/rail connectivity to ports, hinterlands and markets; Dovetailed integrated townships catering to investor countries

Effective environment protection mechanism

Page 9: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 9/47

DMICDC

DMIC Project StatusDMIC Project Status

Page 10: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 10/47

DMICDC

 Apex Authority constituted for DMIC with Union Finance Minister as

Chairman, other Cabinet Ministers and Six Chief Ministers as Members

DMICDC, the project development agency for DMIC, successfully

incorporated on 7th January, 2008 with following initial equity

structure:

GOI: 49%

Financial Institutions: 51% First Board Meeting of DMIC held on 28th January, 2008 under the

chairmanship of Shri Ajay Shankar, Secretary, DIPP, MoCI

M/s IL&FS Infrastructure Development Corporation Limited (IIDC)appointed as Project Management Consultant (PMC) to DMICDC

DMIC Project Status

Page 11: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 11/47

DMICDC

Expression of Interest (EOI) Notice, to appoint Master PlanningConsultants for DMIC Region, published on 9th February,2008 inworldwide editions of ‘The Economist’ 

Envisaged Timelines for selection of Master Planning Consultants: Receipt of EOI Applications: 21 Days from publication of EOI Pre-Qualification & Issue of RFP: By 16th Day of EOI submission Receipt of RFP : 60 Days from issue of RFP

Evaluation & Selection: 30 Days from submission of RFP Consultants shall prepare detailed plans for DMIC Region in 8-10

months after appointment

 A perspective plan for overall DMIC Region

Master Plans for investment nodes to develop as Modern IndustrialTownships with world class infrastructure

Other administrative tasks being addressed to avail Commencementof Business (COB) Certificate and to open Bank Account for DMICDC

DMIC Project Status

Page 12: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 12/47

DMICDC

SectorSector--w ise Investmentw ise Investment

Opportunities in DMIC RegionOpportunities in DMIC Region

Project Component:

Page 13: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 13/47

DMICDC

Project Component:

New Export Oriented Units/ SEZs

Involves setting up self-sustainable

manufacturing/industrial processing activities

(SEZs/ Industrial Parks/ Port Based Industries) These regions shall be:

Sector-specific/ multi-product depending upon

the location (or) specific potentials of the region Will be part of all the envisaged Special

Investment Node in DMIC Region

Could be inclusive of SEZs/ Industrial Parks thatare various stages of approvals

Project Component:

Page 14: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 14/47

DMICDC

Project Component:

 Augmentation of Industrial Estates

Focus is on identifying industrial estates thathave potential for further augmentation

 Augmentation measures for industrial estatesinclude:

Expansion of area allocated with requisiteamenities

Improvement of existing physical and socialinfrastructure (Road/Rail, Truck Terminals/Warehousing Zones)

Development of requisite commoninfrastructure as CETP, Hazardous WasteManagement Facility (HWMF) etc

In all, 12 to 15 Locations identified across theDMIC Region

Investment Region (200SQKM)

Industrial Area (100SQKM)

Industry Augmentation Locations

Dadri

J.N.Port

Rajasthan

Maharashtra

Gujarat

MadhyaPradesh

UttarPradesh

Haryana

Project Component:Project Component:

Page 15: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 15/47

DMICDC

Project Component:Project Component:

Integrated Agro/Food Processing ZoneIntegrated Agro/Food Processing Zone Developing Integrated Agro/ Food

Processing Zones with backward andforward Linkages to offer necessary fillip toagriculture and food processing industries

Indicative Components:

Horticulture Hub and Food processing Zone-End to End Approach to integrate theprocess

Cold Chain Logistics Infrastructure Retail Infrastructure: Strong retail front-end

Short listed Locations (in all 9 Locations): UP (Hapur)- Food Grains, Vegetables Haryana (Sonepat) - Vegetables, Food

Grains Rajasthan (Dausa and Pali)- Guar Gum,

Fruits/Vegetables, Oil & Cotton Seed Process Gujarat (Navsari and Valsad) - Isabgul,Spices, Mango, Sapodilla

Maharashtra(Nashik, Pune) -WineProcessing, Fruits & Vegetables

Madhya Pradesh (Nimach)- Opium ProcessDFC Alignment

Investment Region (200SQKM)

Industrial Area (100SQKM)

Integrated Agro/Food Processing Zone

Dadri

J.N.Port

Rajasthan

Maharashtra

Gujarat

MadhyaPradesh

UttarPradesh

Haryana

Project Component:Project Component:

Page 16: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 16/47

DMICDC

Project Component:Project Component:

Knowledge Cities/ Skill Development CentersKnowledge Cities/ Skill Development CentersObjectives: Position DMIC States as Centers of Excellence for

learning and innovation Linking & developing skills, know-how of industry

and bridge the talent gap Generate knowledge output of highest quality not

only to benefit states/country but to globalcommunity

Project Concept:

To create an ambience of learning and innovationcharacterized by vibrant campuses, peacefulneighborhood, adequate commercial/ recreationalfacilities, good civic infrastructure

  Atleast Ten Locations short listed for ‘Knowledge

Cities’  Other locations to have similar facilities at smaller

scale

DFC Alignment

Investment Region (200SQKM)

Industrial Area (100SQKM)

Knowledge City

Dadri

J.N.Port

Rajasthan

Maharashtra

Gujarat

MadhyaPradesh

UttarPradesh

Haryana

Project omponent:

Page 17: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 17/47

DMICDC

Project omponent:

Development of Feeder Road Links

Proposed Industrial Regions would be well

served by National Highways

Development of Feeder Road Links include

construction of missing links, augmentation

of existing linkages to Four/Six Lane

configuration

DMIC involves construction/ augmentationof 4000km State Highways and Missing

Links

Ministry of Road Transport may accordNational Highway Status to Highway links

in consultation with DMICDC/ State

Governments

HaryanaDadri

Rajasthan

Gujarat

MadhyaPradesh

UttarPradesh

End Terminals

Golden Quadrilateral

DFC Alignment National HighwaysN-S & E-W Corridor

Maharashtra

Arabian Sea

J.N.Port

110

24

11

58

8

15

15

15

17

3

3

3

3

6

66

59

79

79

11

12

12

12

50

76

14

14

89

89

65

65

65

65

71

71

3

8

8

15

Mumbai-PuneExpressway

Mumbai-NashikExpressway

Project omponent:

Page 18: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 18/47

DMICDC

DMIC Region would be served by combination of DFC & Feeder Rail Linkages

 Augmentation of 1100km long rail network, out of 2500km, is already

commissioned for developing as DFC Spurs by Indian Railways

DMIC involves construction/ augmentation of new rail links to connect the

identified industrial regions with DFC, Ports and Hinterlands

Developing Additional DFC Spurs along:

 Vasai Road-Diva-Panvel-Karjat-Pune Rail Link (for enhancing linkage

between Mumbai/ North India and Pune)

Construction of Dhar-Chhota Udepur Rail Link (100km) to link 

Indore/Pithampur with DFC near Vadodara in Gujarat

Developing Regional Rail Links along:Pune-Nashik, Palwal- Rewari & Palwal-

Khurja

Developing Regional MRTS links for

Gandhinagar-Ahmedabad-Dholera;

Delhi-Gurgaon-Manesar-Neemrana

Noida-Greater Noida- Jeur Airport

Project omponent:

Development of Feeder Rail Connectivity

Project Component:

Page 19: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 19/47

DMICDC

Dholera Greenfield Port,Gujarat:

15-18m Draft and Tidal Amplitude of 

10m Height

Potential for Ship Building/ Repairing,

 Auto/Auto Component

Being Developed as Special

Investment Region over 250Sqkm

Maroli Greenfield Port, Gujarat:

Potential to handle 13MTPA in 2010

Coal, Containers, LNG, General Cargo

 – Potential Commodities

Dighi Greenfield Port in Maharashtra:

Potential to handle all sizes of vessels & 

8.5 MTPA Cargo

Potential for additional Developments at

Dahej and Hazira Ports in Gujarat

Project Component:

 Augmentation of Port Connectivity

HaryanaDadri

J.N.Port

Rajasthan

Maharashtra

Gujarat

MadhyaPradesh

UttarPradesh

Mumbai Port

Minor/Other PortsGreenfield Ports

DFC AlignmentEnd Terminals Major PortsMedium Ports

Mundra

Kandla

Pipavav

rbandar Dahej

Hazira

Dholera

Maroli

 Alewadi

Dighi

Project Component:

Page 20: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 20/47

DMICDC

Concept: Planning Approach for DMIC to ensure air

connectivity to all investment regions andindustrial areas

Investment Regions can have Air Strips,

depending on location, to link withinternational airport transfer facility forBusiness Visitors

Proposed Augmentation Measures: New Airport at Greater Noida (Jeur, Dist.

 Aligarh, Uttar Pradesh)  Augmenting Udaipur/ Jodhpur, Jaipur

 Airports in Rajasthan New Airport at Dholera & Augmentation of 

 Vadodara and Surat Airports in Gujarat Nashik and Pune Airports in Maharashtra Intl. Airport at Indore in Madhya Pradesh Greenfield Air Strips at Neemrana-

Rajasthan; Mandsaur/ Ratlam/ Nagda- MP

Project Component:

 Augmentation of Airports

DFC Alignment

Investment Region (200SQKM)

Industrial Area (100SQKM)

Airport Augmentation

Dadri

J.N.Port

Rajasthan

Maharashtra

Gujarat

MadhyaPradesh

UttarPradesh

Haryana

Project Component:

Page 21: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 21/47

DMICDC

Each Common Investment Region (IR/IA) will beprovided with modern logistics infrastructure to

serve containerized and non-containerized cargo

Integrated Multimodal Logistics Hubs at:

Bawal and Palwal, Haryana Ajmer/Marwar, Rajasthan

Palanpur in Gujarat

Nashik, Pune in Maharashtra

Dewas and Indore in Madhya PradeshEnvisaged Port (Container, Ro-Ro, Bulk) Terminals

Bulk Terminal, Ro-Ro Facility at Dahej

Break-Bulk Terminal, Ro-Ro Facility at Maroli

Container Terminals at Hazira, Dighi PortsState-of-the-Art Warehousing zones to be provided

with Inventory Management and Communication

System integrating logistics components as well as

facilitating 3rd Party Logistics Operators

Project Component:

Developing Logistics Facilities

Project Component:

Page 22: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 22/47

DMICDC

Proposed Frameworks:

Generation Plants at State Controlled/ Owned Projects/ IPPs

Generator could supply Power to State DISCOM under PPA and State

DISCOMs can supply power to DMIC at applicable commercial tariff  Generator can identify industrial consumers and enter into PPA 

Generation Plants under CPP Framework 

Could be set up under captive mode by a group of industries

Successful development of DMIC requires assured/reliable power supply on

continuous basis

Need for Additional Capacity and Sources of Power to cater to DMIC

DMIC envisages addition of 10,000MW, mostly along the west coast of Gujaratand Maharashtra

Fuel Sources: Imported Coal (Coastal) , Lignite, Domestic Coal, UCG

3000-3500MW Power Plants at Dholera, Gujarat and at Dighi, Maharashtra

j p

 Augmentation of Power Supply System

Project Component:

Page 23: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 23/47

DMICDC

Emphasis on sustainable development and protection of the region’s minerals,

forests and other natural resources

Proposed Approach for Environmental Protection Mechanism

 Adherence to National environment policy, guidelines, rules & acts;

Comprehensive Environmental Planning and Management;

Emphasis on ecological designs, cleaner production technologies;

Public communication and participation;

Creating market based enforcement mechanism “Polluter Pays”;

Ensure provision of requisite environmental infrastructure with appropriate

design and integration with industrial infrastructure

Indicative Guidelines Envisaged for Development of Industrial Regions:

Define the carrying capacity of each industrial zone;

Maintain the natural areas and indigenous vegetation to extent possible;

Incorporate Energy and resource efficient designs;

Planning environmental management systems & projects

j p

Environmental Protection Mechanism

Project Component:

Page 24: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 24/47

DMICDC

Industrial Regions in DMIC (Investment Regions and

Industrial Areas) will be provided with integrated

townships consisting of 

Residential, commercial, institutional, leisure andrecreational areas along with requisite physical

and social infrastructure facilities

Traffic calming/ local area traffic managementsystem with segregated walkways, cycle tracks,

public transport facilities

Development of dovetailed integrated townships

replicating the living styles/ development needs of 

investors with state-of-the-art physical and social

infrastructure

j p

Integrated Townships

Page 25: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 25/47

DMICDC

Thank YouThank You

Page 26: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 26/47

DMICDC

Way ForwardWay Forward

W F dW F d

Page 27: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 27/47

DMICDC

Way ForwardWay Forward

Developing select stand-alone projects, across the DMICRegion within next 10-12 months

Undertake Master Planning for six investment nodes inPhase-1 to develop as Modern Industrial Townships with

world class infrastructure, and identification of viableprojects for investment – with in next 10 to 12 months

Undertaking Studies for enhancing Logistics/Transportation, Power Supply and EnvironmentManagement system across DMIC Region

Page 28: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 28/47

DMICDC

STATE WISE INDUSTRIAL NODESSTATE WISE INDUSTRIAL NODES

IN DMIC REGIONIN DMIC REGION

Page 29: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 29/47

DMICDC

UTTAR PRADESHUTTAR PRADESH

P d I d t i l N d i Utt P d hP d I d t i l N d i Utt P d h

Page 30: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 30/47

DMICDC

1

DFC Alignment

DMIC Influence

DFC End Terminal

Mega Industrial Region

Delhi-Kolkata DFC

Dadri

2Industrial Region

Proposed Industrial Nodes in Uttar PradeshProposed Industrial Nodes in Uttar Pradesh

Node-1: Dadri-Noida-Ghaziabad Mega Industrial

Region

Node-2: Meerut-Muzaffarnagar Industrial

Region

SummarySummary- Components of Nodes in Uttar PradeshComponents of Nodes in Uttar Pradesh

Page 31: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 31/47

DMICDC

SummarySummary-- Components of Nodes in Uttar PradeshComponents of Nodes in Uttar PradeshComponent Dadri-Noida- Ghaziabad (MIR, Minimum-

200 Sqkm)^

Meerut-Muzaffarnagar (IR,

Min.100 Sqkm)Node No 1

*

Ghaziabad

*

*

Integrated Logistics Hub (with ICD)

** (Dadri-2500MW)

*

Connectivity to Eastern (Ludhiana-Delhi-Kolkata) and Western (Delhi-Mumbai)

Freight Corridors

New Export-oriented Unit/ SEZs

Linking with NHDP (NH-24, NH-58), TajExpressway, Eastern PeripheralExpressway & Hinterlands & 

 Augmentation of State Highway(Ghaziabad-Aligarh-Agra)

2

*

Meerut, Muzaffarnagar

*

Truck Terminal withWarehousing Facility

*

 Augmenting Exist. Indl. Estates

 Agro/ Food Processing Zone

Knowledge City

Logistic Park/ICD/ Port Cont.Terminal/CFS

Integrated TownshipPower Plants

IT/ITES / Biotech Hub

Feeder Rail Connectivity to DFC, Meerut,Lucknow/Saharanpur

Connectivity to NH-58, Augmentation of StateHighways, construction of newExpressway between Delhi,Meerut and Muzaffarnagar

Feeder Roads

^Note: This Investment Region will be served by proposed Greater Noida Airport, besides International Airport atDelhi ‘General Manufacturing Investment Region’, to be spread over 400sqkm, is being planned at Dadri-Noida-GreaterNoida-Ghaziabad

Page 32: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 32/47

DMICDC

HARYANA HARYANA 

P d I d t i l N d i HP d I d t i l N d i H

Page 33: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 33/47

DMICDC

4

5

6

3

DFC Alignment

Mega Industrial Region

Industrial Region

DMIC Influence

Proposed Industrial Nodes in HaryanaProposed Industrial Nodes in Haryana

Node-3: Faridabad-Palwal

Industrial Region

Node-4: Kundli-Sonepat

Mega Industrial Region

Node-5: Rewari-Hissar

Industrial Region

Node-6: Manesar-BawalMega Industrial Region

SummarySummary-- Components of Nodes in HaryanaComponents of Nodes in Haryana

Page 34: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 34/47

DMICDC

Component Faridabad-Palwal(IR- Min.100Sqkm)

Kundli-Sonepat(MIR-Min. 200sqkm)

Rewari-Hissar(IR-

Min.100Sqkm)

Manesar-Bawal(MIR-

Min.200Sqkm)^Node No 3 4 5 6

^An ‘Auto/Auto Component Investment Region, to be spread over 800sqkm, is being planned at Rewari-Manesar-Bawal Region

*

Bawal GrowthCenter

*

Inland ContainerDepot at Bawal/Rewari

*

*

Connectivity to DFCat Rewari

Linking with NHDP,DFC, Expressways& Hinterlands

New Export-orientedUnits/ SEZs

* * *

 Augmenting Exist. Indl.Estates IMT-Faridabad

 Agro/ Food ProcessingZone

*

Knowledge City *

Integrated LogisticsHub / Port Terminal/Truck Terminal

Integrated LogisticsHub (with ICD) Truck Terminal withWarehouse Truck Terminalwith warehousenear Bhiwani

Integrated Township * * *

IT/ITES / Biotech Hub

Feeder Rail Connectivity toDelhi-Agra Main

Connectivity toDelhi-Ambala Main

 Augmentation of Rewari-Hissar-Bathinda Link 

Feeder Roads Linking with NHDP,PeripheralExpressways & Hinterlands

Linking with NHDP,PeripheralExpressways & Widening of NH-71A,

St. Highways

Linking withNHDP, PeripheralExpressways & Widening of NH-

71, NH-10, SHs

Page 35: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 35/47

DMICDC

RAJASTHANRAJASTHAN

Proposed Industrial Nodes in RajasthanProposed Industrial Nodes in Rajasthan

Page 36: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 36/47

DMICDC

Proposed Industrial Nodes in RajasthanProposed Industrial Nodes in Rajasthan

7

DFC Alignment

Mega Industrial Region

Industrial Region

DMIC Influence

8

10

11

9

Node-7: Khushkhera-

Bhiwadi-Neemrana Mega

Industrial Region

Node-8: Jaipur-Dausa

Industrial Region

Node-9: Ajmer-Kishangarh

Mega Industrial Region

Node-10: Rajasamand-

Bhilwara Industrial Region

Node-11: Pali-Marwar

Industrial Region

ummaryummary-- omponents o o es n a ast anomponen s o o es n a as an

Component Khushkhera-Bhi di

Jaipur-Dausa(IR Mi

 Ajmer-Ki h h

Rajsamand-Bhil (IR

Pali-Marwar (IR Mi 100 k )

Page 37: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 37/47

DMICDC

Bhiwadi-Neemarana(MIR-Min.200sqkm)^

(IR-Min.100sqkm)

Kishangagrh(MIR- Min.200sqkm)

Bhilwara (IR-Min. 100sqkm)

Min. 100sqkm)

Node No 7 8 9 10 11

^Government of Rajasthan plans to develop a Mega City, to be spread over 160Sqkm, at Nimarana-Behror

New Export-orientedUnit/ SEZs

* * * * *

 Augmenting Exist. Indl.

Estates

Kishangarh Pali

 Agro/ Food ProcessingZone

* *

Knowledge City * *

Integrated LogisticsHub / Port Terminal/Truck Terminal

IntegratedLogistics Hub

Truck Terminal +Warehouse

IntegratedLogistics Hub(with ICD)

Truck Terminal+ Warehouse

IntegratedLogistics Hub

(with ICD)

 Airport Development Intl. AirportComplex

Jaipur Udaipur Jodhpur

Integrated Township * * * * *

IT/ITES / Biotech Hub *

Feeder Rail Links Rail Linkagewith DFC

Served byJaipur-Agra

BG Link 

Linkage withDFC

Linkage with Ajmer-Chittaurgah

Served by DFCat Marwar

Feeder Roads Linkage withNHDP, DFC,Hinterland

Linkage withNH-11 & Hinterland

Linkage withNHDP, DFC/Hinterland

Linkage withNHDP , DFC & Hinterland

Linkage withNHDP, DFC/Hinterland

Page 38: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 38/47

DMICDC

GUJARATGUJARAT

Proposed Industrial Nodes in GujaratProposed Industrial Nodes in Gujarat

Page 39: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 39/47

DMICDC

Proposed Industrial Nodes in GujaratProposed Industrial Nodes in Gujarat

DFC Alignment

Mega IndustrialRegionIndustrial Region

DMIC Influence

12

14

13

15

16

Node-12: Ahmedabad-

Dholera Mega Industrial

Region

Node-13: Vadodara-

 Ankleshwar Industrial Regio

Node-14: Bharuch-Dahej

Mega Industrial Region

Node-15: Surat-Navsari

Industrial Region

Node-16: Valsad-Umbergao

Industrial Region

Summaryummary-- Components of Nodes in Gujaratomponents o o es n u arat

Component Ahmedabad-Dholera (MIR-Min 200Sqkm)#

 Vadodara-Ankleshwar

Bharuch-Dahej (MIR

Surat-Navsari

 Valsad-Umbergaon

Page 40: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 40/47

DMICDC

Min. 200Sqkm)#  Ankleshwar(IR-Min.100Sqk m)

Dahej (MIR-Min.200Sqkm)^

Navsari(IR-Min.100Sqkm)

Umbergaon(IR-Min.100Sqkm)

Node No. 12 13 14 15 16

New Export-orientedUnit/ SEZs

* * * * *

 Augmenting Exist. Indl.Estates

 Vatva Ankleshwar/Jhagadia

 Vilayat Umbergaon

 Agro/ Food ProcessingZone

* *

Port Development Dholera (Greenfield) Dahej Hazira Maroli(Greenfield)

Ship Yard * *

Knowledge City * * *Integrated LogisticsHub / Port Terminal/Truck Terminal

Integrated Logistics Hub(With CFS)

Truck Terminal +Warehouse

Bulk & Ro-Ro TerminalsLogisticsHub

Port Cont.TerminalLogisticHub

Break-Bulk & Ro-RoTerminalsLogistics

Hub

 Airport Development Intl. Airport Complex Vadodara SuratIntegrated Township * * * * *

Power Plants 3500MW Captive Captive Captive Captive

IT/ITES / Biotech Hub * * *

#Note: At Gandhinagar, Government of Gujarat has proposed a Knowledge City with Finance City over 700-800Ha land, envisaged to be part of Ahmedabad-Dholera Investment Region# Dholera Investment Region, to be spread over 250Sqkm, is part of the State’s Vision Plan for Infrastructure^Investment Region at Bharuch-Dahej will include Petroleum, Chemicals & Petrochemical Investment RegionPCPIR s read over 250s km ro osed b the Ministr of Chemicals & Petro-Chemicals Government of India

SummarySummary-- Components of Nodes in GujaratComponents of Nodes in Gujarat

Page 41: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 41/47

DMICDC

SummarySummary Components of Nodes in GujaratComponents of Nodes in GujaratComponent Ahmedabad-Dholera (MIR-

Min. 200Sqkm)^ Vadodara- Ankleshwar(IR-Min.100Sqkm)

Bharuch-Dahej (MIR-Min.200Sqkm)

Surat-Navsari(IR-Min.100Sqkm)

 Valsad-Umbergaon(IR-Min.100Sqkm)

Node No. 12 13 14 15 16

Feeder Rail Links Regional Rail Link between Ahmedabad-Dholera;

Dholera-Vadodara Link forDFC

Will beServed by VadodaraJunction on

DFC

Bharuch-Dahej GaugeConversion

Hazira-SuratGauge

Conversion

Broad-gauge Rail

link between

Maroli andDFC

Feeder Roads Connectivity to NH-8A, NH-8,Bhavnagar & 

Surendra Nagar,

Connectivityto NH-8 andaugmentation of statehighwaylinks for

Jambusar,Rajpipla

Four-laningof Bharuch-Dahej and

 Augmentation of 

 Ankleshwar-

Shirpur (NH-3) Link 

Four-laning of Hazira-Surat;Connectivity to NH-

8, NH-6

 Augmentation of ConnectivitybetweenMaroli- NH-8; Vapi-

NH-3; Valsad- NH-6 Links

^ Note: Development of Dholera-Surendra Nagar Feeder Road Link will entail with development of Logistics Hubat Surendra NagarNote: Unless otherwise specified, Development of Feeder Road and Rail Links in the DMIC project influence areaof Gujarat will include linkages between ports, National Highways as well as the proposed investment regions andindustrial areas

Page 42: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 42/47

DMICDC

MAHARASHTRA MAHARASHTRA 

Proposed Industrial Nodes in MaharashtraProposed Industrial Nodes in Maharashtra

Page 43: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 43/47

DMICDC

Proposed Industrial Nodes in MaharashtraProposed Industrial Nodes in Maharashtra

DFC Alignment

Mega IndustrialRegionIndustrial Region

DMIC Influence18

19

DFC- End Terminal

20

17

Node-17: Dhule-Nardhana

Mega Industrial Region

Node-18: Igatpuri-Nashik-

Sinnar Mega Industrial

Region

Node-19: Pune-Khed

Industrial Region

Node-20: Dighi Port

Industrial Region

Summaryummary-- Components of Nodes in Maharashtraomponents of Nodes in Maharashtra

Component Dhule-Nardhana(MIR

Igatpuri-Nashik-Si (MIR

Pune-Khed (IR A Mi 100

Dighi Port (IR-Min. 100sqkm)

Page 44: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 44/47

DMICDC

(MIR-Min.200Sqkm)

Sinnar (MIR-Min.200Sqkm)

 Area-Min.100Sqkm)

Node No 17

*

*

*

Connectivity to

Mumbai- Nashik-Jalgaon Railway

Linking with NHDP& Hinterlands

18 19

*

Chakan, Khed

*

*

Integrated

Logistics Hub(with ICD)

Pune Intl Airport

*

*

Pune-Karjat-

Panvel to DFCStandards

20

Linking withNHDP & 

New Export-orientedUnit/ SEZs

*

 Augmenting Exist.Indl. Estates

Nashik, Sinnar

 Agro/ FoodProcessing Zone

*

Port Development Dighi Port with ContainerTerminal (Greenfield)

Knowledge City *

Integrated Logistics

Hub / PortTerminal/ Truck Terminal

Integrated

Logistics Hub (withICD)

Integrated Logistics Hub

(with CFS)

 AirportDevelopment

Nashik Airport

Integrated

Township

* *

Power Plants 3000MW in Raigad District

IT/ITES / BiotechHub

Feeder Rail Connectivity to

Mumbai- Nashik-Jalgaon Railway

Connectivity to DFC, Port & 

Hinterland

Feeder Roads Linking with NHDP& Hinterlands

Linking NHDP, Ports & Hinterlands with Site

Page 45: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 45/47

DMICDC

MADHYA PRADESHMADHYA PRADESH

Proposed Industrial Nodes in Madhya PradeshProposed Industrial Nodes in Madhya Pradesh

Page 46: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 46/47

DMICDC

Proposed Industrial Nodes in Madhya PradeshProposed Industrial Nodes in Madhya Pradesh

22

21

DFC Alignment

Mega IndustrialRegion

Industrial Region

DMIC ProjectInfluence Area

24

23

Node-21: Neemuch-

Nayagaon Industrial Region

Node-22: Shajapur-Dewas

Industrial Region

Node-23: Ratlam-Nagda

Mega Industrial Region

Node-24: Pithampura-Dhar-

Mhow Mega Industrial Regio

ummary--Components of Nodes in Madhya PradeshComponents of Nodes in Madhya Pradesh

Page 47: Status Dmicdc 180208 r0

8/3/2019 Status Dmicdc 180208 r0

http://slidepdf.com/reader/full/status-dmicdc-180208-r0 47/47

DMICDC

Components of Nodes in Madhya PradeshComponents of Nodes in Madhya PradeshComponent Neemuch-

Nayagaon

(IR- Min.100Sqkm)

Shajapur-Dewas(IR-Min.100Sqkm)

Ratlam-Nagda (MIR-Min. 200Sqkm)

Pithampur-Dhar-Mhow (MIR-

Min.200Sqkm)

Node No 21 22 23

*

Ratlam/ Nagda

Inland Container

Depot at Ratlam withTruck Terminal

*

 Augmentation of links to

Godhra/Vadodara,Indore, Ajmer

Linking with NHDP, & Hinterland

 Airport Development Augmentation of Indore Airport to International Airport, Air Strips at Mandsaur,Ujjain/Nagda

24

*

Indore/ Pithampur

*

*

Integrated Logistics

Hub with ICD atIndore/ Pithampur

*

*

 Augmentation of Indore-Godhra-

 Vadodara to DFCStandards

Linking with NHDP,& Hinterland

New Export-orientedUnits/ SEZs

* *

 Augmenting Exist.

Indl. Estates

Dewas Industrial

Growth Center Agro/ Food ProcessingZone

*

Knowledge City *

Integrated Logistics

Hub / Port Terminal/Truck Terminal

Truck Terminal

with WarehousingFacility at Neemuch

Integrated

Logistics Hub atDewas

Integrated Township * *

IT/ITES / Biotech Hub

Feeder Rail Enhanced Linkageto Ratlam-Chittaurgarh andIndore

Enhanced Linkageto Indore, Bhopal

Ujjain

Feeder Roads Linking with NHDP& Hinterland

Linking with NHDP& Hinterland;

 Augmentation of NH-3 (Indore-

Dewas/ Shajapur)to Expressway