    PLANT AND NON-PLANT BUILDINGS NON-PLNT BLDG

    Sr.No.

    TWDNo.

    Short Title Engineering Specification / Work ItemDescription

    UnitApprx.quantity

    107 NEW Providing and applying Epoxy coating to existing concretesurface including making the concrete surface smooth and freefrom honeycomb, fixing of base liquid and hardener liquid toform epoxy liquid, at site, in mix proportion as permanufacturer's instruction , Protection of epoxy liquid fromdirect sun light, primer coating with Nito prime 25 of FOSROCChemicals or Araldite of Ciba-GEIGY 250 - 100 Pbw andHardener of Ciba-GEIGY HY 840 - 50 Pbw or equivalent,Applying under coating with Nitocote EP-410 of FosrocChemicals or Araldyte of Ciba-GEIGY GY 250 - 100 Pbw andHardener of Ciba-GEIGY HY 830 - 45 Pbw and Hardener ofCiba-GEIGY HY850- 15 Pbw and Silica Flour of Ciba-GEIGY -20 Pbw and Flow Control Agent of Ciba-GEIGY - 2 Pbw orequivalent within pot life of formulation on the concrete surfacein layers using brushes or rollers for under coating, Spreadingglass cloth after applying one layer of epoxy liquid with

    minimum Overlap for glass cloth 10 cms at corners whererequired after inetrval of 20 minutes,applying finishing coatingwith two more coats of epoxy liquid over the glass cloth withbrushes, curing etc. complete.

    SQ.M. 127.00

    Sl.No.

    Description Unit Area Rate Amount

    1

    Surface Preparation

    Prepare the dry concrete surface using proper grindingequipment to remove any loose material, contaminations and

    laitance to provide a sound, fine gripping surface. Clean theentire floor area using a powerful industrial vacuum cleaner

    SQM 127 100 12700

    2 Providing and applying 2 componentDr. Fixit Novolac EPprimerand allow it to dry for 5 6 hrs before application ofScreed @ the rate of 0.15kg / sqm.

    SQM 127 65 8255

    3

    Providing and applying 1 coats ofDr. Fixit Novolac TC,followed by installation of glass cloth and allow it to dry for812 hrs before application of 2 coats of Dr. Fixit Novolac TC.Mixing of part A and Part B will be in the ratio of 4 :1. specific

    gravity of Dr. Fixit Novolac TC is 1.25 (+/- 0.05), Hardness ShoreD (ASTM D 2240) is 80.

    SQM 127 350 44450

  • 7/28/2019 GDCL MANGLORE 1

    3/3

    Pidilite Industries Limited.HVS Apartments, Edward road.Banglore-560052(Karnataka)

    Phone-080-30563000 / 3001 .Fax: 22281579Web: www.doctor-fixit.com

    4Providing and applying 2 coats ofDr. Fixit Novolac TC andallow it to dry for 812 hrs before application of Dr. FixitNovolac Clear top coat. Mixing of part A and Part B will be inthe ratio of 4 :1. specific gravity of Dr. Fixit Novolac TC is 1.25(+/- 0.05), Hardness Shore D (ASTM D 2240) is 80.

    SQM 127 250 31750

    5

    Providing and applying Dr.Fixit Novolac Clearcoat in 2 coats@ 0.15 kg/sqm/ coat having Hardness Shore D 80 as per

    ASTM D 2240 Compressive strength, 70 N/mm2 @ 7 DaysASTM D 695, Flexural strength 40N/mm2 @7 Days ASTM C580, Tensile strength 30N/mm2 @ 7 Days ASTM D 638, NoIndentation as per MIL D 3134F, pH range withstands 1-13.5, flammability self extinguishing ASTM D 635. Servicetemp. 120

    0C 150

    0C, water absorption 0.1% as per ASTM C

    570. All in complete as per the manufacturers specificationsand directions of the engineer in charge.

    SQM 127 250 31750

    TOTAL RS 128905/-

    Terms and conditions:

    1) The above estimate is inclusive of all taxes and exclusive of service charge [12.30%] whichwill be charged extra.

    2) Please prepare the work order in the name of our authorized applicator3) Above quantity specified are only for reference the final bill will be made as per actual

    measurements.4) We require techno commercial work order and clearance from site.5) Water, Electricity, and staging shall be provided from the company free of cost.6) We shall we provided sufficient time to complete the treatment as per standard practice.

    7) Secured and covered storage space for storing our material and labor shed foraccommodating our labor shall be provided free of cost at site.

    8) The rate is valid for present marketing rates of the items any variation above 5% either wayshall be taken into consideration while billing.

    9) Payment: 50% advance, and rest will be taken as per running bills.10)Validity 30 days.